Factory Name & Address Adury Apparels Ltd.New Shed, Shed-8 (Id: 23545), Karardi, P.O- Karardi High School, P.S- Shibpur, Dist- Narsingdi, Narsingdi
Date of Inspection 8-Oct-2017
Finance Plan Agreed
Inspection Visit Type Inspection Visit Sub Type Item No Inspection Observation Inspection Factory Action Final Timeline Inspection Inspection Progress Status
Action Plan Plan Comments Timeline
Initial Inspection 1 As-built drawing not available on site. Have a qualified On 22/12/2020: Dec 31 2017
electrical engineer SLD need to be
develop an as- updated ( TOB has
built single line Completed (SLD no identification,
diagram detailing Has been Neutral
key components updated) identification does
and capacity of not match with
the electrical phase
system in identification)
Initial Inspection 8 Internal components of distribution b Provide
accordance covers
withor On 22/12/2020: Nov 30 2017
oards are not properly concealed. blanks
Allianceto conceal Not Corrected.
Location: DB-01/1st Floor, SDB-01/1st all live internal
requirements. Completed
Floor. components of (Distribution
switchboards board has been
and/or concealed)
distribution
boards.
Initial Inspection 12 Electrical wiring/cables are not prope Provide identificati On 22/12/2020: Dec 31 2017
rly identified. Location: DB-01/1st on of wires/cables Phase
Floor, SDB-01/1st Floor. by separate color identification does
coding, marking ta In Progress (Time not match with
pe, Line: 30.5.21) neutral
tagging, or other a identification.