Professional Documents
Culture Documents
so
= Vb + Missing Pulse
Vb + (M-Vm) * Average Correction Factor
Gas Consumption for Month October,20
Thermax Group Ltd. Engineering Department, Generator Section
1 2 3 4 5=3-4 6 7
r Month October,2020
ment, Generator Section
Correctio
Correction n factor
factor of
EVC,Vbt
8=7/4 9
TWDL (G) Gas Consumption for Month October,2020
Thermax Group Ltd. Engineering Department, Generator Section
1 2 3 4 5=3-4 6 7 8=7/4 9 10
2/10/2020 2543841 2543739 102 200 When installing the
July,2020 7/22/2020 5406015 5257007 149008 148906 8459828 1.6092 8699455 meter
August,2020 8/25/2020 5664975 5515158 149817 149715 8939614 1.6209 9182290
September,2020 9/27/2020 5945240 5795422 149818 149716 9461122 1.8608 9739709
October,2020 10/28/2020 6198946 6049126 149820 149718 9933590 1.8623 10212407
TYDFL (B) Gas Consumption for Month October,2020
Thermax Group Ltd. Engineering Department, Generator Section