Professional Documents
Culture Documents
Project
Contract Number Date 2022/12/01
Description RFI
Status Request For Information Prepared By T. Sakuneka
Reason For
RFI Item# RFI Round RFI Date Type RFI Mechanno Systems Resolution by Client RFI Status Signature Date
No Resolution
Supply comprehensive Scope of Work. If
1 1 2022/12/01 Scope not in hand Mechanno Systems may
develop one in collaboration with the client
Supply project schedule. If not in hand
2 1 2022/12/01 Scope Mechanno Systems may develop one in
collaboration with the client
3 1 2022/12/01 Design Input Docs Supply Water Balance Calcs (if available)
Supply Process Flow Diagrams (PFDs) for
the Water Treatment System. This is
4 1 2022/12/01 Design Input Docs
typically designed by a qualified process
engineer and contains mass balance
Supply Process Philosophy. This details the
5 1 2022/12/01 Design Input Docs
process as laid out on PFDs.
Supply Piping and Instrumentation
Diagrams (P&IDs) for the Water Treatment
6 1 2022/12/01 Design Input Docs
System. If not in hand, this may form part of
Mechanno Systems design deliverables.
sa
Supply a site area layout (2D map of
7 1 2022/12/01 Design Input Docs
infrastructure)
Supply documentation or write-up
8 1 2022/12/01 Standards/Specifications specifying and detailing user requirements
pertaining to E&I installation works
RFI Revision AA
[OFFICIAL copy maintained electronically] 2022/12/01 1 of 3
Client Jimmac
Project
Contract Number Date 2022/12/01
Description RFI
Status Request For Information Prepared By T. Sakuneka
Reason For
RFI Item# RFI Round RFI Date Type RFI Mechanno Systems Resolution by Client RFI Status Signature Date
No Resolution
Supply documentation or write-up
16 1 2022/12/01 Standards/Specifications specifying and detailing user requirements
pertaining to E&I earthing & lighting
RFI Revision AA
[OFFICIAL copy maintained electronically] 2022/12/01 2 of 3
Client Jimmac
Project
Contract Number Date 2022/12/01
Description RFI
Status Request For Information Prepared By T. Sakuneka
Reason For
RFI Item# RFI Round RFI Date Type RFI Mechanno Systems Resolution by Client RFI Status Signature Date
No Resolution
Typical Instrumentation Design
Deliverables:
1. Instrument Schedule
2. Cable Schedule
3. IO Schedule
4. Termination Schedule
5. RAT List
6. Rack Schedule
7. Panel Gas
8. Panel Schematics
24 1 2022/12/01 Design Deliverables 9. Cable Block Diagrams
10. Loop Diagrams
11. Instrument Location Diagrams
12. Network Diagrams
13. P&IDs
14. Spares List
15. BOM
RFI Revision AA