Project
Contract Number Date 12/1/2022
Description FAT Punch List - CuSX_PLC01
Status Request For Information Prepared By T. Sakuneka
Item RFI Round RFI Date Type By RFI Resolution by Client RFI Status Sign off Date Addressed
Supply comprehensive Scope of Work. If
1 1 12/1/2022 Scope Mecchano Systems not in hand Mecchano Systems may
develop one in collaboration with the client
Supply project schedule. If not in hand
2 1 12/1/2022 Scope Mecchano Systems Mecchano Systems may develop one in
collaboration with the client
3 1 12/1/2022 Design Input Docs Mecchano Systems Supply Water Balance Calcs (if available)
Supply Process Flow Diagrams (PFDs) for
the Water Treatment System. This is
4 1 12/1/2022 Design Input Docs Mecchano Systems
typically designed by a qualified process
engineer and contains mass balance
Supply Process Philosophy. This details the
5 1 12/1/2022 Design Input Docs Mecchano Systems
process as laid out on PFDs.