10/14/23, 7:00 PM View Form

M/S Mizan Enterprise-M/S Hazi Shariatullah Traders (JV)


(JVCA - View Details)

Bill of Quantities

Bill of Quantities

Total
Unit Price Unit Price Total Price
Price
Item Item Code (if Measurement
Group Description of Item Quantity
no. any) Unit In figures In Words In Figures
In Words
(BDT) (BDT) (BDT)
(BDT)

Project Profile Signboard:


Providing and fixing of
typical project profile
signboard as per direction of
E-I-C, to be placed at a
suitable place of the site
including submission of
proposals for the materials
& size of the signboards
(recommended size:
1800mm x 1200 mm with 2
nos. 75mm dia. MS post,
outer & inner frames of
Seven Thirty-
board shall be 50mm x
Thousand Four
50mm x 5mm & 25mm x
Nine Thousand
25mm x 5 mm respectively )
General, Site Hundred Five
Section- and text layout to the
Facilities and 1.02 sqm 4.320 7992.132 and 34526.010 Hundred
1 : 01 engineer for approval which
Safety Ninety- and
will be positioned as
Two point Twenty-
directed by the engineer
One Three Six point
and removing the same on
Two Zero One
completeion of the works or
as instructed by the E-I-C.
Sheeting will be made of
encapsulated lens with
retro-reflective type and
messages/ borders will be
screen printed. The text
shall mention among others
the name of the project,
name of the implementing
agency, cost of the project,
completion time, name of
the contractor etc.

Temporary Toilet:
Construction of temporary
toilets in work site/ rest area Nine Nine
complete as per design and Thousand Thousand
General, Site specifications and approved Nine Nine
Section-
Facilities and 1.13 by the Engineer-in-Charge. each 1.000 9990.165 Hundred 9990.165 Hundred
1 : 02
Safety There should be 1 camp in and Ninety and Ninety
each site. In each camp, point One point One
there should be 1 no of toilet Six Five Six Five
for women and 1 no of toilet
for men

Section- General, Site 1.01.03 Erection and maintenance job 1.000 25375.019 Twenty- 25375.019 Twenty-
1 : 04 Facilities and of semi permanent site Five Five
Safety office and removal of the Thousand Thousand
same after completion of Three Three
work in accordance with the Hundred Hundred
conditions of contract. In and and
addition to the office Seventy- Seventy-
required for own use, the Five point Five point
contractor shall provide and Zero One Zero One
maintain furnished site office Nine Nine
for the use of Engineer-in-
charge and his staff. The
site office must have tiles
floor, adequate foundation,
brick walls, false ceiling of
gypsum board and all
windows are to be glazed,
shuttered and provided with
steel grill. Outside and
https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 1/40
10/14/23, 7:00 PM View Form
inside wall surface are to be
painted on plaster
acceptable to the Engineer-
in-charge. The site office
shall be maintained in a
secure condition by the
contractor until the
completion of the contract
and shall be provided with
electricity, water supply,
wash rooms and sewerage
facilities. All doors shall be
fitted with approved locks
and windows shall be
provided with screen/blinds.
Before construction the
contractor shall submit plans
and drawings showing
proposed details and
location for the site office,
including foundations,
access roads, shades,
layout of electrical and water
supply and hard standings
there for the approval of
Engineer-in-charge. The
Engineer-in-charge may
require revision of the plans
prior to giving approval for
construction. The contractor
shall also submit detailed
proposed furniture, fittings
and other items of
equipment and plant to the
Engineer-in-charge for
approval. These items shall
be of the standard quality
suitable for site. T he office,
complete with furnishings,
fittings, access roads and
hard standings shall be
ready for occupation by the
Engineer-in-charge within
28 days of the date when
the contractor first occupies
the site. The contractor shall
provide day and night
guards and an attendant for
the field office. At the end of
the contract all materials,
equipment and plant,
furniture, fittings recovered
from dismantling the office
and removing access road
will be the property of the
contractor. No interim
payment shall be certified
unless engineer's office with
required facilities are
constructed and accepted
by the Engineer-in-charge.
(This is a time related item;
proportionate payment for
this item shall be made
distributing in each bill on
the basis of percentage
progress of the whole works
under contract) Engineer's
site office of minimum 38
sqm plinth area with
providing necessary
facilities including office
furniture, 24000 BTU air
cooler, umbrella, crookeries,
water purifier, PC with
monitor, uninterruptible
power supply (UPS), laserjet
printer (minimum 20 ppm),
LED flood light

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 2/40
10/14/23, 7:00 PM View Form
fittings(Halogen) for sight
security etc. [PWD 01.1.3]

Supplying and providing of


first aid box with necessary
materials/medicine (hygienic
gown, thermometer, Nine Nine
adhesive dressings, Thousand Thousand
General, Site antiseptic solutions, Nine Nine
Section-
Facilities and 1.03 bandages, cotton balls or each 1.000 9990.165 Hundred 9990.165 Hundred
2 : 01
Safety swaps, emergency blanket, and Ninety and Ninety
gloves, hand sanitizer, ice point One point One
pack, saline etc ). All Six Five Six Five
complete as per direction of
Engineer-in -charge. [PWD
01.1.4.3]

EFW(CE): Earth filling work


with specified soil in any
type of embankment, where
earth shall be carried by
truck/boat or any other
means, supplied at
contractor's own cost
including royalty, cutting,
carrying, filling and
compacting to
85%/95%/98% of Maximum
Dry Density (MDD) at
Optimum Moisture Content
(OMC), with reference to
laboratory density test
AASHTO standard hammer
by throwing earth in layers
not more than150mm in
proper alignment, grade,
camber and side slope in all
types of soil except rocky,
gravelly and slushy
including benching not more
than 300mm in vertical and
Ten Lakh
600mm in horizontal steps
Sixty-
along the sides while Two
Three
widening any embankment, Hundred
Thousand
Earth Works with clod breaking to and
Section- Eight
in Road 2.02.3.02 maximum size of 100mm, cum 3549.600 299.705 Ninety- 1063832.868
3 : 01 Hundred
Embankment benching the side slopes, Nine point
and Thirty-
removing roots and stumps Seven
Two point
of trees of girth upto 200mm Zero Five
Eight Six
and other foreign particles,
Eight
stripping/ ploughing the
base of embankment and
borrow pit area, dug bailing,
clearing jungles, bail out of
water, rough dressing
including 150mm cambering
at the centre of crest with all
leads and lifts complete
(compaction will be done by
the contractor with approved
equipment including all
ancillary charges for
compaction and testing) as
per direction of Engineer in
charge. Payment will be
made on compacted
volume. The item is
applicable when earth is
supplied and arranged by
the contractor from a
distance beyond 200m from
the end of right of way.
Outside municipal area,
95% Compaction

Section- Road Works 3.03.1 Dis(SB/BC): Dismantling of cum 133.200 194.339 One 25885.955 Twenty-
3 : 02 damaged sub-base and Hundred Five
Base course works in and Thousand
flexible paved road of any Ninety- Eight
thickness by appropriate Four point Hundred
mechanical means and Three and

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 3/40
10/14/23, 7:00 PM View Form
removing the debris to a Three Eighty-
safe distance, stacking Nine Five point
properly including all tools Nine Five
and plants, etc. all complete Five
as per direction of the E-I-C.

S&C(SB): Labour for mixing,


spreading & compacting of
Sub-base consisting of sand
and crusher run aggregate
made of well burnt picked
1st class bricks or stone
having compacted thickness
as per specifications
including local handling,
hand packing, watering, dry Fifty-
rolling followed by wet Three
Three
rolling in layers of specified Thousand
Hundred
loose thickness with 8~10 Two
and
Section- tonne road roller to achieve Hundred
Road Works 3.03.2 cum 133.200 399.607 Ninety- 53227.652
3 : 03 Design soaked CBR but not and
Nine point
less than 30% at a degree Twenty-
Six Zero
of compaction to minimum Seven
Seven
98% (Modified Proctor) etc. point Six
all complete as per direction Five Two
of the Engineering-in-
charge. Thickness of each
layer should not be more
than 100mm loose and
Payment will be made on
compacted thickness. (The
rate excludes the cost of
sand, brick/stone
aggregates)

EE(125mm): Brick on end


edging (125mm across) with
1st class/picked bricks
Sixty
including cutting trenches Two
Thousand
true to level & maintaining Hundred
Section- AND
Road Works 3.04.3.2 grade, removing earth, re- m 240.000 250.064 and Fifty 60015.360
3 : 04 Fifteen
filling & ramming the sides point Zero
point
properly, including supplying Six Four
Three Six
and filling the gaps with
local sand, etc. all complete
as per direction of the E-I-C.

PiEE(125mm): Labour
Four
charge for picking up the
Thousand
existing brick on end edging
Eighteen Three
Section- (125mm across) including
Road Works 3.04.1.2 m 240.000 18.202 point Two 4368.480 Hundred
3 : 05 staking the materials at a
Zero Two and Sixty-
specified distance, etc. all
Eight point
complete as per direction of
Four Eight
the E-I-C.

Sand (FM 0.50) filling on the


road bed in the improved
sub-grade with sand
(minimum FM 0.5) free from
One Lakh
dust, earth, other vegetable
Eighty-
growth, foreign materials
Seven
etc. including supplying all Nine
Thousand
materials, spreading, Hundred
Seven
Section- watering, compacting by and Forty-
Road Works 3.02.1.1 cum 198.912 944.021 187777.105 Hundred
3 : 06 appropriate mechanical Four point
and
means to obtain a minimum Zero Two
Seventy-
Soaked CBR 8% or Design One
Seven
CBR at minimum
point One
compaction 98% of
Zero Five
Maximum Dry Density
(MDD) (Modified Proctor),
etc. all complete as per
direction of the E-I-C.

Section- Road Works 3.05.2.3 B&SBC: Labour charge for cum 10.400 367.748 Three 3824.579 Three
3 : 07 breaking and spreading 1st Hundred Thousand
class & picked brick chips and Sixty- Eight
including cost of bricks Seven Hundred
carrying, breaking into point and
specified sizes including Twenty-

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 4/40
10/14/23, 7:00 PM View Form
screening & spreading Seven Four point
uniformly on the road Four Eight Five
surface maintaining grade, Seven
camber and super elevation, Nine
etc. all complete as per
direction of the E-I-C. 50mm
downgraded

SBBC(FM-0.5): Providing
compacted aggregate sand
sub-base course with 38mm
down Crusher run 1st class
bricks/picked chips of LAA
value not exceeding 40 &
sand of minimum FM 0.50
Three Twenty-
mixed in proportion 1:1 by
Thousand Six
volume placed in layer(s),
Nine Thousand
mixing properly, watering,
Section- Hundred Six
Road Works 3.03.3.1 compacting with 8~10 tonne cum 6.660 3996.066 26613.800
3 : 08 and Hundred
road roller to attain each
Ninety-Six and
layer's minimum soaked
point Zero Thirteen
CBR 30% or Design CBR at
Six Six point Eight
minimum compaction 98%
of MDD (Modified Proctor)
including supplying of all
materials, labourers, tools
and equipment etc. all
complete as per direction of
the E-I-C.

CWBM(iSSM): Labour
charge for compacted WBM
base course with crusher
run aggregate made of well
burnt picked and 1st class
bricks or stone having
compacted thickness as per
specifications including local
handling, hand packing,
watering, dry rolling followed
by wet rolling in layers of
specified loose thickness
with 8~10 tonne road roller
to attain each layer's
minimum soaked CBR 80%
or Design CBR at specified
Four
degree of compaction
Thousand
including supplying Five
Six
choking/screening material Hundred
Hundred
as filler material and
Section- and
Road Works 3.05.6.02 @0.012cum/sqm or as cum 7.820 599.411 Ninety- 4687.394
3 : 09 Eighty-
required etc. all complete as Nine point
Seven
per direction of the Four One
point
Engineering-in-charge. After One
Three
adequate dry rolling,
Nine Four
spreading of
choking/screening material
on the surface, sprinkling of
water and rolling is to be
continued until all the voids
are filled, wave of
grout/slurry flushes ahead of
the roller. Thickness of each
layer should not be more
than 100mm loose and
Payment will be made on
compacted thickness. The
rate excludes the cost of
brick aggregates. Degree of
compaction: 100% of MDD
(Modified Proctor)

Section- Road Works 3.05.7.1.02 WBMBC: Providing cum 106.030 6493.607 Six 688517.150 Six Lakh
3 : 10 compacted brick aggregate Thousand Eighty-
base course, including Four Eight
supplying, spreading and Hundred Thousand
compacting 50mm and Five
downgraded crusher run 1st Ninety- Hundred
class and Picked brick chips Three and
(LAA value not exceeding point Six Seventeen
40%) including supplying of

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 5/40
10/14/23, 7:00 PM View Form
required amount of 12mm Zero point One
downgraded chips made of Seven Five
same quality bricks,
including spreading
uniformly in layers of
specified loose thickness on
road surface maintaining
grade, camber and super
elevation including local
handling, hand packing,
booming, watering, dry
rolling followed by wet
rolling in layers with 8~10
tonne road roller to attain
each layer's minimum
soaked CBR 80% or Design
CBR at specified degree of
compaction, including
supplying choking/screening
material as filler material
@0.018cum/sqm or as
required including cost of
materials, labours etc. all
complete as per direction of
the E-I-C. After adequate
dry rolling spreading of
choking/screening material
on the surface, sprinkling
water and rolling is to be
continued until all the voids
are filled, wave of
grout/slurry flushes ahead of
the roller. Thickness of each
layer should not be more
than 100mm loose and
measurement for Payment
will be made on compacted
thickness. Degree of
Compaction: 100% of MDD
(Modified Proctor)

PCMD@1.2: Providing
Prime coat @1.2 liter/sqm
with cut back bitumen to be
prepared by cutting back
60/70 penetration grade
straight run bitumen
(conforming to the
requirements of ASTM/
AASHTO in the ratio of 100 Ninety-
parts by volume of bitumen One Eight
to 40-60 parts by volume of Hundred Thousand
kerosene depending on the and Five
Section- porosity of the surface and Twenty- Hundred
Road Works 3.06.1.2 sqm 759.000 129.872 98572.848
3 : 11 will be decided by field trials, Nine point and
the correct quantity that is Eight Seventy-
completely absorbed within Seven Two point
24 hours including carefully Two Eight Four
cleaning of the surface of Eight
the granular base material
to be primed and spraying
cut back bitumen at a
temperature from 100°C to
120°C by mechanical
distributor, etc. complete as
per direction of the E-I-C.
[Retail]

Section- Road Works 3.06.5.2 40mmDC (BG-60/70): sqm 759.000 899.115 Eight 682428.285 Six Lakh
3 : 12 Providing 40mm thick Hundred Eighty-
(minimum) compacted pre- and Two
mixed bituminous surfacing Ninety- Thousand
- wearing course with 25mm Nine point Four
downgraded crushed stone One One Hundred
chips (LAA value < = 30%) Five and
complying with the specified Twenty-
grading requirement of the Eight point
relevant item of Road Two Eight
Design standards, water Five
absorption not >2%,

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 6/40
10/14/23, 7:00 PM View Form
flakiness index not >35%
mixed with 60/70
penetration grade straight
run bitumen satisfying the
requirements of
ASTM/AASHTO. The
bitumen and stone-chips
shall be separately heated
to a temperature 140°C ?
155°C and 150°C ? 170°C
respectively before mixing.
The mixing shall be done at
temperature between 140°C
? 160°C at a separate place
away from the fire. The
bitumen and stone-chips
mixture shall be laid
uniformly on the road
surface in single appropriate
layer to give specified
compacted thickness,
maintaining specified
camber, grade and super-
elevation. The mixture
should be rolled at a
temperature not below 90°C
with appropriate Steel Drum
Roller (3-5 tons) &
pneumatic multiple tire roller
(8-10 tons) to full
compaction, including
supplying of all materials,
their carriage, labourers
tools and equipment etc. all
complete as per the
direction of the E-I-C. The
bitumen in the mix shall be
between @ 5.0% to 5.5% by
weight of total mix or as
determined by job mix
design. (In order to achieve
the specified grading a
blending of nominal
maximum size of 25mm,
19mm, 12mm, 6mm
crushed stone chips and
stone dust is suggested and
proportion will have to
determine by the laboratory
analysis).[Retail]

Section- Bridge 4.05.01.01.01 Earth work in excavation of cum 14.117 249.754 Two 3525.777 Three
3 : 13 Works foundation of structures by Hundred Thousand
mechanical (Hydraulic and Forty- Five
excavator - Long Boom)/ Nine point Hundred
manual means in all sorts of Seven and
soil up to specified depth in Five Four Twenty-
accordance with Five point
requirements of lines, Seven
grades, cross sections and Seven
elevation as shown in the Seven
drawing including setting
out, removal of stumps,
logs, boulders and other
deleterious materials,
providing necessary tools
and plants, construction of
shoring and bracing,
cleaning the excavated
materials to a safe distance
out of the site premises, cut
to a firm surface including
pumping/ bailing out water,
removal of spoils to a safe
distance, dressing of sides
and bottom and backfilling
of trenches up to original
level with approved material
etc. all complete as per
approval of E-I-C.

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 7/40
10/14/23, 7:00 PM View Form
Contractor shall get
acquainted with site
conditions, nature of soil
and adopt suitable adequate
dewatering system as
deemed fit for the nature of
soil and prevailing water
table to get the surface
reasonably dry for laying
PCC at the time of
execution so that execution
will not be hampered or
delayed. Back-filled
materials shall be
compacted to a density
comparable with the
adjacent undisturbed
material. Earth work in
Ordinary Soil by Manual
Means for an initial lead up
to 30m For depth up to 3m

PCC-10: Plain cement


concrete work in foundation
with minimum compressive
strength of 10 MPa at 28
days (sugessted mix
proportion 1:3:6) on
standard cylinder as per
standard practice of Code
AASHTO/ ASTM and
cement conforming to BDS
EN 197-1 : 2003 CEM-II/A- Eight Six
L/M/V/W 42.5N, sand of Thousand Thousand
minimum FM 1.8 and 20mm Nine Six
down well graded 1st class/ Hundred Hundred
Section- Bridge
4.06.03 picked brick chips (LAA cum 0.744 8991.148 and 6689.414 and
3 : 14 Works
value not exceeding 40) Ninety- Eighty-
comforming to ASTM C 33 One point Nine point
including breaking bricks One Four Four One
into chips, shuttering, mixing Eight Four
by concrete mixer machine,
casting, laying compacting
and curing for the requisite
period etc. all complete as
per direction of the E-I-C.
Additional quantity of
cement to be added if
required to attain the
strength at the contractor's
own cost.

RMP(By-TPC): Providing
and applying road markings
of center line and stop line
etc. with 5mm to 7mm thick
hot applied thermoplastic
compound including
reflectorising glass beads @
250mgs per sqm area by
special applicator machine
on road/plain surface,
including cleaning the Eight Thirty-Two
surface of all dirt, oils, Hundred Thousand
grease, dust and other and Three
Section-
Road Works 3.12.08.01 contaminants, demarcation sqm 36.000 899.115 Ninety- 32368.140 Hundred
3 : 15
at site and traffic control Nine point and Sixty-
involved, the finished One One Eight point
surface to be level, uniform Five One Four
and free from streaks and
holes, etc. all complete in all
respect as direction of the
Engineer-in-charge. Rate is
inclusive of cost of all
materials, labour machinery,
lighting, guarding,
maintenance of diversion
and all incidental charges in
this connection.

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 8/40
10/14/23, 7:00 PM View Form

PCC-17: Plain cement


concrete work in foundation
with minimum compressive
strength of 17 MPa at 28
days (sugessted mix
proportion 1:2:4 & maximum
w/c ratio 0.45) on standard
cylinder as per standard
practice of Code AASHTO/
ASTM/ and cement
conforming to BDS EN 197-
Six
1 : 2003 CEM-II/A-L/M/V/W
Nine Thousand
42.5N, sand of minimum FM
Thousand Five
1.8 and 20mm down well
Nine Hundred
Section- Bridge graded 1st class/ picked
4.06.04 cum 0.652 9990.165 Hundred 6513.588 and
3 : 16 Works brick chips (LAA value not
and Ninety Thirteen
exceeding 40) comforming
point One point Five
to ASTM C 33 including
Six Five Eight
breaking bricks into chips,
Eight
shuttering, mixing by
concrete mixer machine,
casting, laying compacting
and curing for the requisite
period etc. all complete as
per direction of the E-I-C.
Additional quantity of
cement to be added if
required to attain the
strength at the contractor's
own cost.

PS: Supplying and laying of Two


single layer polythene sheet Hundred
Twenty-
weighing one kilogram per and
Nine point
Section- 6.5 square meter in floor or Ninety-
Road Works 3.07.1 sqm 9.752 29.971 Nine 292.277
3 : 17 any where below cement Two point
Seven
concrete complete in all Two
One
respect and accepted by Seven
Engineer-in-charge. Seven

Section- Bridge 4.11.01.04.01 Supplying and fabrication of kg 272.448 115.257 One 31401.539 Thirty-One
3 : 18 Works Ribbed or deformed bar Hundred Thousand
reinforcement for all types of and Four
RCC work including Fifteen Hundred
straightening, removing ruts, point Two and One
cleaning, cutting, hooking, Five point Five
bending, lapping and/or Seven Three
welding wherever required Nine
as directed, placing in
position, tieing with 22 BWG
black annealed binding wire
(PVC coated in case of
FBEC rebar) double fold,
cost of binding wire and
anchoring to the adjoining
members wherever
necessary, supplying and
placing with proper cover
blocks (1:1), supports,
chairs, spacers, splices or
laps etc. including cost of all
materials, cost of labour,
cost of equipment &
machinery, loading and
unloading, transportation, all
other incidental charges and
work at all leads and lifts
etc. to complete the work as
per design, drawing,
specifications and direction
of the E-I-C. Measurement
relating to nominal mass,
dimensions and tolerances
of various types of steel
shall conform to relevant
BDS/ ASTM codes.
Reinforcement shall be
measured only in lengths of
bar as actually placed in
position on standard weight

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 9/40
10/14/23, 7:00 PM View Form
i.e. 7850 kg/m3 (BNBC
Table 6.2.1) basis. No
separate payment shall be
allowed for chairs of any
shape & profile, spacer bar
of any shape & profile,
lap/splice & welding unless
otherwise shown in the
drawing, wastages, binding
wire etc. as the cost of these
is included in the unit rate.
Note: Tests for reinforcing
bars shall be conducted at
LGED/ BUET/ CUET/
KUET/ RUET/SUST. Grade
B500DWR: Deformed bar
produced and marked as
per BDS ISO 6935-2:2016
with minimum yield strength,
fy (ReH) = 500 MPa but fy
(ReH) not exceeding 1.3
ReH, the ratio of actual
ultimate tensile strength,
fu(Rm) to actual yield
strength, fy(ReH) shall be at
least 1.25 and minimum
elongation after fracture
(A5.65) & minimum total
elongation at maximum
force (Agt) is 13% and 8%
respectively.[This
reinforcement shall be
selected as per instruction
given in the drawing & after
getting approval from
Design unit, LGED.] Using
retail rate of reinforcing bar

SBFS(FM-0.50): Providing
Single layer brick flat soling
(BFS) with 1st class or
picked bricks, true to level, Three
Three
maintaining camber/super Thousand
Hundred
elevation and grade Nine
and
Section- including carrying bricks, Hundred
Road Works 3.08.4.1 sqm 9.900 399.607 Ninety- 3956.109
3 : 19 filling the interstices tightly and Fifty-
Nine point
with sand of minimum FM Six point
Six Zero
0.50, etc. all complete in all One Zero
Seven
respect as per approved Nine
drawing, specification and
direction of the Engineer-in-
charge.

Section- Bridge 4.09.05.01 RCC-30SCCM: Reinforced cum 2.560 15984.264 Fifteen 40919.716 Forty
3 : 20 Works cement concrete work with Thousand Thousand
minimum cement content Nine Nine
and maximum water cement Hundred Hundred
ratio as specified by the and and
laboratory through mix Eighty- Nineteen
design having minimum Four point point
required average strength, Two Six Seven
f'cr = 38.5 MPa and Four One Six
satisfying a compressive
strength f'c = 30 MPa at 28
days on standard cylinders
as per standard practice of
Code AASHTO/ ASTM and
cement conforming to BDS
EN 197-1 : 2003 CEM I
52.5N / ASTM C150 Type I,
high range water reducing
admixture of complying type
A or F under ASTM C 494
(Doses of admixture to be
fixed by the mix design),
sand of minimum FM 2.5
and 20mm down well
graded crushed stone chips
broken from boulders
(Preferably stone chips from

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 10/40
10/14/23, 7:00 PM View Form
Madhyapara, Dinajpur, LAA
value not exceeding 30)
conforming to ASTM C33
including breaking chips,
screening through proper
sieves, cleaning, placing
shutter in position, making
shutter water-tight properly,
placing reinforcement in
position, mixing in standard
mixture machine with hoper,
maintaining allowable slump
of 100mm to 150mm,
casting in forms, compacting
by mechanical vibrator
machine, curing for 28 days,
removing centering-
shuttering after approved
specified time period, other
incidental charges, etc. all
complete as per drawing,
specification & direction of
the E-I-C. The cost of
reinforcement and it's
fabrication, welding,
coupling, placing, binding
etc. is not included but the
cost of admixture is included
in this unit rate. The Mix
Design shall have to be
approved by the concerned
District Quality Control
Laboratory or any other
reputed laboratory approved
by the competent authority
before execution of the
work. [Using Concrete
Mixture Machine and retail
rate of Cement] For
foundation of Pier &
Abutment of Bridges and
Box Culverts

Section- Road Works 3.11.25.01 JGT-HSM: Supplying and sqm 279.708 29.971 Twenty- 8383.128 Eight
3 : 21 laying of open mesh Plain Nine point Thousand
Weave jute geo-textile Nine Three
(JGT) commonly known as Seven Hundred
Soil Saver of different One and
grades conforming to BDS Eighty-
1909: 2016 for Hill Slope Three
Management work including point One
local handling, unrolling, Two Eight
placing in position, unrolling
of JGT in the direction of
surface run-off, stapling JGT
by 6mm dia. U-shapped
hooknails at an interval of
300mm with overlaps of
100mm at the sides and
150mm at the ends,
anchoring JGT within a
trench at the two ends by
filling the trench with big
bats/gravel or other suitable
materials, ensuring proper
drapability (JGT must touch
the ground surface at all
points), filling drain materials
immediately after laying of
JGT, protecting the JGT
from any other damages
etc. all complete in all
respect as per instructions
given in Annexure-C (JGT
Installation Guideline for Hill
Slope Management) of BDS
1909 : 2016 and approval of
Engineer-In-Charge.
JGT_HSM-1: Applicable for
Moderate slope (=35

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 11/40
10/14/23, 7:00 PM View Form
degree) & annual rainfall =
2000mm. This type of JGT
shall have the following
requirements. Ends x Picks
/dm = 6.5 x 4.5, Width(m) =
1.22, Mass per unit area
(gsm) = 500 ± 10%,
Thickness under 2 kPa
pressure (mm) = 4.5 ± 10%,
Water Holding Capacity (%
by weight) = 400, Wide
Width Tensile Strength
(kN/m) MD x CD = 6.5 x 6.0,
Wide Width Elongation (%)
MD x CD = 14.0 x 14.0.

PCC Block-17MPa (PW):


Manufacturing and
supplying Plain Cement
Concrete (PCC) Blocks with
cement conforming to BDS
EN 197-1 : 2003 CEM- II/A-
M 42.5N, sand of minimum
FM 1.5 and 20 mm down
well graded Shingles/stone
chips(LAA value not
exceeding 35) to attain a
minimum 28 days cylinder
strength of 17.00 MPa
(suggested mix proportion
Three
1:2:4), including grading,
Lakh
washings shingles, mixing in
Ninety-Six
standard mixture machine, Two
Thousand
casting in forms, making Hundred
Nine
Section- shutter water-tight properly, and Forty-
Road Works 3.11.28.02 each 1589.250 249.754 396921.544 Hundred
3 : 22 compacting by vibrator Nine point
and
machine and curing for at Seven
Twenty-
least 28 days, including Five Four
One point
preparation of platform,
Five Four
shuttering and stacking in
Four
measurable stacks, cost of
all materials, labor,
equipment and machinery,
work at all leads and lifts,
loading and unloading,
transportation and all other
incidental charges etc. all
complete in all respect as
per approved drawing,
specification and direction of
the Engineer-in-charge.
Steel shutter shall be used
to perform the job. Size
400mmX400mmX150mm

LC-CCB: Labour charge for


laying single layer CC Block
of different sizes for
protective wall, including
preparation trenches, true to
level, maintaining alignment,
Fifty-
watering and ramming the
One Seven
base, including carrying and
Thousand Thousand
placing CC blocks, filling
Four One
minimum 65% interstices of
Hundred Hundred
Section- CC Block work tightly with
Road Works 3.09.09 cum 38.160 1498.525 and 57183.714 and
3 : 23 cement mortar (1:6), raking
Ninety- Eighty-
out joints, cleaning and
Eight point Three
soaking Block at least for 24
Five Two point
hours before use, washing
Five Seven
of sand, curing for requisite
One Four
period, etc. all complete in
all respect as per approved
drawing, specification and
direction of the Engineer-in-
charge. [Excluding the cost
of CC Blocks].

Section- Earth Works 2.06.1 Creating turf on the side sqm 360.000 19.981 Nineteen 7193.160 Seven
3 : 24 in Road slopes and top of point Nine Thousand
Embankment embankment with good Eight One One

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 12/40
10/14/23, 7:00 PM View Form
quality turf not less than 225 Hundred
mm square chunk, watering and
till the grass grown including Ninety-
all leads and lifts etc. Three
complete and accepted by point One
the Engineer-in-charge. Six

RCC-Gpost: Prroviding,
fitting and fixing 200mm dia
round RCC Guide Post
1.70m long as per standard
drawing enumerated in
Appendix-6 (type design for
Guide Post) with Reinforced
Cement Concrete (1:2:4)
with 20mm down well
graded brick chips casting,
curing for requisite period,
including cost of providing
4nos.of 12mm dia. Rod of
length 1.65m as main
reinforcement and 12 nos.
of round shaped 8mm dia
rods used as binders;
including two coats of
painting with best quality
synthetic enamel paint over
One
a prime coat of approved Ninety-
Thousand
brand of different colour and Five
Five
grade to form 6 nos. Thousand
Hundred
Section- horizontal alternate bands in Nine
Road Works 3.12.02 each 60.000 1598.426 and 95905.560
3 : 25 white/yellow and red to 90 Hundred
Ninety-
cm length standing up and Five
Eight point
above ground, making hole point Five
Four Two
in ground of 800mm depth Six
Six
and 300m minimum dia,
fixing the guard posts in the
same holes and repacking
the earth properly so as to
keep the guard posts
standing properly erect in
correct position true to line
and length including
carriage of RCC Guide Post
with due care to the site
including loading into the
truck and unloading at site
complete in all respect as
per approved drawing,
specification and direction of
the Engineer-in-charge.
Rate is inclusive of cost of
all materials, labour and all
incidental charges in this
connection.

Section- Road Works 3.12.04.1 CRS-Plate: Providing and each 1.000 4995.082 Four 4995.082 Four
3 : 26 fixing of retro-reflectorized Thousand Thousand
cautionary, mandatory and Nine Nine
informatory sign as per Hundred Hundred
standard drawing and and
enumerated in Appendix-6 Ninety- Ninety-
(type design for Traffic Five point Five point
Signs) made of 18 BWG Zero Eight Zero Eight
M.S. sheet of equilateral Two Two
triangle/Circular/Rectangular
plates of different sizes as
mentioned in the drawing
fitted with MS
triangular/Rectangular frame
of same size as plates by
point welding (frames made
by thorough welding of
25mmX25mmX3mm MS
angle covering all sides of
the plates and maximum
150mm center to center in
the middle of frames in each
vertical & horizontal
directions), Plates are fitted

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 13/40
10/14/23, 7:00 PM View Form
with 50mm dia & 2.90mm
thick MS pipes by
continuous welding,
including cutting of MS
angle at touched point of
MS pipe, including cost of
providing 200mm long 4
nos. 12mm dia anchor bars
be fitted at the lower part of
the GI pipes by welding,
making finishing, grinding
and carrying to the working
sites, the post firmly fixed to
the ground by means of
properly deigned foundation
with cement concrete of
minimum cylinder crushing
strength of concrete
17.0Mpa at 28 days of
curing (Suggested Mix
Proportion 1:2:4), 60cm
below the ground level, the
signs properly erect in
correct position, true to line
and length, including two
coats of painting with best
quality synthetic enamel
paint of approved brand &
printing with retro-reflective
paint of different approved
colour, etc. all complete in
all respect as per approved
drawing, specification and
direction of the Engineer-in-
charge. Rate is inclusive of
cost of all materials, labour
and all incidental charges in
this connection. 600mm
equilateral triangle with
671mm X 202mm
supplementary Plate (For
Precautionary Sign)

Section- Road Works 3.12.04.2 CRS-Plate: Providing and each 2.000 2997.049 Two 5994.098 Five
3 : 27 fixing of retro-reflectorized Thousand Thousand
cautionary, mandatory and Nine Nine
informatory sign as per Hundred Hundred
standard drawing and and
enumerated in Appendix-6 Ninety- Ninety-
(type design for Traffic Seven Four point
Signs) made of 18 BWG point Zero Zero Nine
M.S. sheet of equilateral Four Nine Eight
triangle/Circular/Rectangular
plates of different sizes as
mentioned in the drawing
fitted with MS
triangular/Rectangular frame
of same size as plates by
point welding (frames made
by thorough welding of
25mmX25mmX3mm MS
angle covering all sides of
the plates and maximum
150mm center to center in
the middle of frames in each
vertical & horizontal
directions), Plates are fitted
with 50mm dia & 2.90mm
thick MS pipes by
continuous welding,
including cutting of MS
angle at touched point of
MS pipe, including cost of
providing 200mm long 4
nos. 12mm dia anchor bars
be fitted at the lower part of
the GI pipes by welding,
making finishing, grinding
and carrying to the working
sites, the post firmly fixed to

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 14/40
10/14/23, 7:00 PM View Form
the ground by means of
properly deigned foundation
with cement concrete of
minimum cylinder crushing
strength of concrete
17.0Mpa at 28 days of
curing (Suggested Mix
Proportion 1:2:4), 60cm
below the ground level, the
signs properly erect in
correct position, true to line
and length, including two
coats of painting with best
quality synthetic enamel
paint of approved brand &
printing with retro-reflective
paint of different approved
colour, etc. all complete in
all respect as per approved
drawing, specification and
direction of the Engineer-in-
charge. Rate is inclusive of
cost of all materials, labour
and all incidental charges in
this connection. 600mm
circular with 600mm X
202mm supplementary
Plate (For Compulsory Sign)

Section- Road Works 3.12.04.4 CRS-Plate: Providing and each 2.000 2997.049 Two 5994.098 Five
3 : 28 fixing of retro-reflectorized Thousand Thousand
cautionary, mandatory and Nine Nine
informatory sign as per Hundred Hundred
standard drawing and and
enumerated in Appendix-6 Ninety- Ninety-
(type design for Traffic Seven Four point
Signs) made of 18 BWG point Zero Zero Nine
M.S. sheet of equilateral Four Nine Eight
triangle/Circular/Rectangular
plates of different sizes as
mentioned in the drawing
fitted with MS
triangular/Rectangular frame
of same size as plates by
point welding (frames made
by thorough welding of
25mmX25mmX3mm MS
angle covering all sides of
the plates and maximum
150mm center to center in
the middle of frames in each
vertical & horizontal
directions), Plates are fitted
with 50mm dia & 2.90mm
thick MS pipes by
continuous welding,
including cutting of MS
angle at touched point of
MS pipe, including cost of
providing 200mm long 4
nos. 12mm dia anchor bars
be fitted at the lower part of
the GI pipes by welding,
making finishing, grinding
and carrying to the working
sites, the post firmly fixed to
the ground by means of
properly deigned foundation
with cement concrete of
minimum cylinder crushing
strength of concrete
17.0Mpa at 28 days of
curing (Suggested Mix
Proportion 1:2:4), 60cm
below the ground level, the
signs properly erect in
correct position, true to line
and length, including two
coats of painting with best
quality synthetic enamel

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 15/40
10/14/23, 7:00 PM View Form
paint of approved brand &
printing with retro-reflective
paint of different approved
colour, etc. all complete in
all respect as per approved
drawing, specification and
direction of the Engineer-in-
charge. Rate is inclusive of
cost of all materials, labour
and all incidental charges in
this connection. 810mm X
480mm Rectangular (For
Informative Sign)

Section- Road Works 3.11.33.01 Brick (BP-TW): Construction m 56.000 8991.148 Eight 503504.288 Five Lakh
3 : 29 and Installation in position Thousand Three
brick palisading work as per Nine Thousand
standard drawing Hundred Five
enumerated in Appendix-6 and Hundred
(type design for protective Ninety- and Four
work) with 375mm thick One point point Two
Brick Masonry work upto One Four Eight
500 mm height from bottom Eight Eight
& rest 500 mm height
250mm thick Brick Masonry
work and Pre cast RCC
Post of 03 (three) meter
long (150mmX150mm) and
capping beam
(200mmX150mm) using
20mm down graded crushed
stone chips (LAA value not
exceeding 30), sand
(minimum FM 2.5) and
cement conforming to BDS
EN 197-1 : 2003 CEM-II/A-
M 42.5N to attain a
minimum 28 days cylinder
crushing compressive
strength 25.00 Mpa ( mixing
ratio 1:1.5:3 & maximum
water cement ratio 0.4) as
per standard practice of
code AASHTO/ASTM
including supplying,
fabricating and binding of
400/420 Grade MS
deformed bar of required
size, length and spacing.
The pre-cast post must be
driven by suitable
monkey/drop hammer in 5/6
th of its total length @ 1 m
c/c into the ground laying on
proper alignment. Brick
Masonry work in cement
mortar (1:3), filling the
interstices tightly with
mortar, raking out joints,
cleaning and soaking bricks
at least for 24 hours before
use, washing of sand,
including flush pointing at
front face of the brick wall
with cement mortar (1:2),
curing for requisite period,
including excavating
minimum 575mm depth
foundation trenches for brick
wall and laying one layer
polythene sheet, casting
75mm thick cement
concrete (1:3:6) below the
375 mm brick work by
means approved designed
including form work, etc. all
complete in all respect as
per approved drawing,
specification and direction of
the Engineer-in-charge.

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 16/40
10/14/23, 7:00 PM View Form
(Unit cost includes Brick
wall, all casting work,
reinforcement, its
fabrication, shuttering,
curing for 28 days, driving of
the post, lab testing charges
as per design and all other
incidental charges, etc.) with
capping beam

RRSheeting: Supplying and


fixing retro-reflectorised
reflective sheeting on
cautionary, mandatory and
informatory traffic signs with
honey comb retro-
reflectorised (encapsulated One
lens type) reflective sheet of Thousand Five
approved brand of different Nine Thousand
colour, including cleaning Hundred Six
Section- and washing the surface and Hundred
Road Works 3.12.10 sqm 2.820 1998.033 5634.453
3 : 30 and necessary scaffolding, Ninety- and Thirty-
etc. including carriage of Eight point Four point
sheet to the site and fixing, Zero Four Five
etc. all complete in all Three Three
respect as per approved Three
drawing, specification and
direction of the Engineer-in-
charge. Rate is inclusive of
cost of all materials, labour
and all incidental charges in
this connection.

Brick work with 1st class


brick in specified cement
mortar in foundation with
sand of minimum FM 1.20
and cement conforming to Seven Thirty-
BDS EN 197-1 : 2003 CEM- Thousand Eight
II/A-L/M/V/W 42.5N, filling Nine Thousand
the interstices tightly with Hundred Two
Section- Bridge
4.06.05.02 mortar, raking out joints, cum 4.784 7992.132 and 38234.359 Hundred
3 : 31 Works
cleaning and soaking bricks Ninety- and Thirty-
at least for 24 hours before Two point Four point
use, washing of sand, curing One Three Three Five
at least for 7 days etc. all Two Nine
complete as per design,
specification & direction of
the E-I-C. Cement mortar
(1:4)

Minimum 12 mm thick
cement sand (F.M. 1.2)
plaster with neat cement
finishing to plinth wall with
cement (1:4) up to 150 mm
Six
below ground level including Two
Thousand
washing of sand, finishing Hundred
One
the edges and corners and and
Section- Building Hundred
5.12.03 curing at least for 7 days, sqm 20.520 299.705 Ninety- 6149.947
3 : 32 Works and Forty-
cost of water, electricity, Nine point
Nine point
scaffolding and other Seven
Nine Four
charges etc. all complete in Zero Five
Seven
all respect as per drawing
and accepted by the
Engineer-in-charge.
(Cement: CEM-II/B-M)
ground floor. [PWD 15.2]

Section- General, Site 1.08 Bench Mark Pillar: each 2.000 999.016 Nine 1998.032 One
4 : 01 Facilities and Manufacturing, supplying & Hundred Thousand
Safety fixing in position RCC and Nine
(1:2:4) Bench Mark Pillars of Ninety- Hundred
size 150mm x 150mm x Nine point and
750mm, with 400mm x Zero One Ninety-
400mm x 100mm base Six Eight point
having 3 nos. 10mm dia MS Zero
bar each way at base, 4 Three Two
nos. 10mm dia vertical bar
and 8 nos. 6mm dia tie,
including cost of form works,

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 17/40
10/14/23, 7:00 PM View Form
concreting, reinforcement,
plastering at top, inscribing
on exposed surface,
finishing surface, curing,
earth cutting, embedding
450mm below GL.,
backfilling, ramming etc.
complete as per direction of
E-I-C.

Dismantling of existing/
damaged structures like
culverts, bridges, retaining
walls comprising of
masonry, cement concrete,
wood work, steel work by
manual/ mechanical means
and sorting the dismantled
material, disposal of
unserviceable material and
stackting the serviceable
material with all lifts and
lead up to 1000 meters
including scrapping and
removing concrete from MS
rods, preparation and
erection of platform where
necessary, carrying, all sorts Two Two Lakh
of handling, stacking the Thousand Seven
same properly after clearing, Five Thousand
Section- Bridge leveling and dressing the Hundred Nine
4.01.01.01.01 cum 81.122 2563.926 207990.805
4 : 03 Works site and clearing the and Sixty- Hundred
river/canal bed, etc. all Three and Ninety
complete as per direction of point Nine point Eight
the E-I-C. Cost of Two Six Zero Five
conveying, loading,
transportation of
unserviceable material
accumulated during
dismantling operation is
included in this unit rate.
The unserviceable material
must be disposed at a safe
place outside the site
premises with minimum
traffic disruption and the
procuring entity will not
provide any environmentally
safe place for disposing the
unserviceable materials.
RCC works Case I: By
Manual Means

Section- Earth Works 2.02.3.02 EFW(CE): Earth filling work cum 828.000 299.705 Two 248155.740 Two Lakh
4 : 04 in Road with specified soil in any Hundred Forty-
Embankment type of embankment, where and Eight
earth shall be carried by Ninety- Thousand
truck/boat or any other Nine point One
means, supplied at Seven Hundred
contractor's own cost Zero Five and Fifty-
including royalty, cutting, Five point
carrying, filling and Seven
compacting to Four
85%/95%/98% of Maximum
Dry Density (MDD) at
Optimum Moisture Content
(OMC), with reference to
laboratory density test
AASHTO standard hammer
by throwing earth in layers
not more than150mm in
proper alignment, grade,
camber and side slope in all
types of soil except rocky,
gravelly and slushy
including benching not more
than 300mm in vertical and
600mm in horizontal steps
along the sides while
widening any embankment,

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 18/40
10/14/23, 7:00 PM View Form
with clod breaking to
maximum size of 100mm,
benching the side slopes,
removing roots and stumps
of trees of girth upto 200mm
and other foreign particles,
stripping/ ploughing the
base of embankment and
borrow pit area, dug bailing,
clearing jungles, bail out of
water, rough dressing
including 150mm cambering
at the centre of crest with all
leads and lifts complete
(compaction will be done by
the contractor with approved
equipment including all
ancillary charges for
compaction and testing) as
per direction of Engineer in
charge. Payment will be
made on compacted
volume. The item is
applicable when earth is
supplied and arranged by
the contractor from a
distance beyond 200m from
the end of right of way.
Outside municipal area,
95% Compaction

Sand (FM 0.50) filling on the


road bed in the improved
sub-grade with sand
(minimum FM 0.5) free from
dust, earth, other vegetable
growth, foreign materials Twenty-
etc. including supplying all Nine One
materials, spreading, Hundred Thousand
Section- watering, compacting by and Forty- Eight
Road Works 3.02.1.1 cum 23.100 944.021 21806.885
4 : 05 appropriate mechanical Four point Hundred
means to obtain a minimum Zero Two and Six
Soaked CBR 8% or Design One point Eight
CBR at minimum Eight Five
compaction 98% of
Maximum Dry Density
(MDD) (Modified Proctor),
etc. all complete as per
direction of the E-I-C.

SBFS(FM-0.50): Providing
Single layer brick flat soling
(BFS) with 1st class or
picked bricks, true to level, Fifty-Nine
Three
maintaining camber/super Thousand
Hundred
elevation and grade One
and
Section- including carrying bricks, Hundred
Road Works 3.08.4.1 sqm 148.000 399.607 Ninety- 59141.836
4 : 06 filling the interstices tightly and Forty-
Nine point
with sand of minimum FM One point
Six Zero
0.50, etc. all complete in all Eight
Seven
respect as per approved Three Six
drawing, specification and
direction of the Engineer-in-
charge.

Section- Road Works 3.08.5.1 SHBB(FM-0.50): Providing sqm 148.000 799.213 Seven 118283.524 One Lakh
4 : 07 Brick on edge pavement in Hundred Eighteen
single layer of Herring Bone and Thousand
Bond (HBB) with 1st class Ninety- Two
or picked bricks true to level, Nine point Hundred
maintaining camber, super Two One and
elevation and grade, Three Eighty-
including supplying and Three
laying 25mm thick sand point Five
(minimum FM 0.50) cushion Two Four
over the BFS, filling the
interstices tightly with same
type of sand, etc. all
complete in all respect as
per approved drawing,

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 19/40
10/14/23, 7:00 PM View Form
specification and direction of
the Engineer-in-charge.

EE (75mm): Brick on end


edging (75 mm across the
road) with first class or
Eleven
picked jhama bricks and
One Thousand
filling the gaps with fine
Hundred Nine
sand (F.M. 0.80) including
Section- and Forty- Hundred
Road Works 3.04.3.1 cutting trenches, true to m 80.000 149.852 11988.160
4 : 08 Nine point and
level and grade, removing
Eight Five Eighty-
earth, refilling and ramming
Two Eight point
the sides properly including
One Six
cost of all materials and
accepted by the Engineer-
in-charge. [PWD 24.7.1]

Earth work in excavation of


foundation of structures by
mechanical (Hydraulic
excavator - Long Boom)/
manual means in all sorts of
soil up to specified depth in
accordance with
requirements of lines,
grades, cross sections and
elevation as shown in the
drawing including setting
out, removal of stumps,
logs, boulders and other
deleterious materials,
providing necessary tools
and plants, construction of
shoring and bracing,
cleaning the excavated
materials to a safe distance
out of the site premises, cut
to a firm surface including One Lakh
pumping/ bailing out water, Nineteen
removal of spoils to a safe Two Thousand
distance, dressing of sides Hundred Nine
Section- Bridge and bottom and backfilling and Forty- Hundred
4.05.01.01.01 cum 480.133 249.754 119915.137
4 : 09 Works of trenches up to original Nine point and
level with approved material Seven Fifteen
etc. all complete as per Five Four point One
approval of E-I-C. Three
Contractor shall get Seven
acquainted with site
conditions, nature of soil
and adopt suitable adequate
dewatering system as
deemed fit for the nature of
soil and prevailing water
table to get the surface
reasonably dry for laying
PCC at the time of
execution so that execution
will not be hampered or
delayed. Back-filled
materials shall be
compacted to a density
comparable with the
adjacent undisturbed
material. Earth work in
Ordinary Soil by Manual
Means for an initial lead up
to 30m For depth up to 3m

Section- Bridge 4.05.03 P&B: Pumping and bailing hour 60.000 299.705 Two 17982.300 Seventeen
4 : 10 Works out water from the interior of Hundred Thousand
any foundation enclosure of and Nine
work site with all leads and Ninety- Hundred
lifts including supply, Nine point and
operation and maintenance Seven Eighty-
of requisite number of water Zero Five Two point
pumps, arrangements for Three
protection of ring bundh and
side slopes of foundation pit
against erosion or washout
etc. It should be carried out
in such a manner as to

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 20/40
10/14/23, 7:00 PM View Form
preclude the possibility of
the movement of water
through or alongside any
concrete being placed, etc.
all complete as per direction
of E-I-C. [PWD 2.2]

Section- Bridge 4.07.01.01.04 BCIS: Boring for cast-in-situ m 561.000 3816.243 Three 2140912.323 Twenty-
4 : 11 Works piles up to the required Thousand One Lakh
depth and specified Eight Forty
diameter with driving Hundred Thousand
temporary steel casing and Nine
(shall be 8mm thick with Sixteen Hundred
necessary stiffener bands point Two and
and sharp edge at bottom Four Twelve
and provided up to non- Three point
collapsible strata from the Three Two
existing ground level but not Three
less then 4.0 m) in all types
of soils including min. 2-
chamber slurry tank, drilling
with bentonite circulation
(Dry Bentonite powder of
liquid limit of minimum 350
shall be mixed with water @
minimum 4% by weight to
make the fresh drilling fluid
of viscosity between 32-50
seconds and density less
than 1.1gm/cc), maintaining
fluid level inside casing at all
time at least 2 m higher than
outside the casings,
washing bore hole by air lift
cleanup method with fresh
bentonite slurry until the
slurry from bore hole bottom
have density less than
1.15gm/cc and sand content
is less than 4%, make the
bore hole ready for
concreting including
disposal/removal of all
bored material, hire charge
of mechanical winch
machine/ skid mounted
mechanical table drive
rotary/ hydraulic rotary
boring equipment, derrick,
trimie pipe, cost of fuel,
lubricant, mobilization,
demobilization, spares,
insurance coverage, water,
electricity and other charges
all complete as per design,
drawing, specification and
direction of E-I-C.
Contractor shall submit the
methodology of cast-in-situ
pile work including
information on boring
equipment, sequence of
boring & casting, quality
control, disposal of spoils,
test result of materials to the
E-I-C for approval before
commencing any boring
operation. Boring and
excavation for a pile shall
not commence until 24
hours after completion of
any pile within radius of 6
meters c/c. Cost of
collecting, conveying,
loading, transportation of
spoils/mud accumulated
during boring of cast-in-situ
pile with all lifts and lead is
included in this unit rate.
The spoils must be dumped

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 21/40
10/14/23, 7:00 PM View Form
in an unobjectionable place
outside the site premises
with minimum traffic
disruption and the procuring
entity will not be responsible
for any irregularities by the
party regarding dumping of
the spoils. Note: Boring
method shall be selected as
per instruction given in the
drawing. BCIS_PM: Boring
by PERCUSSION METHOD
using Direct Mud Circulation
(DMC) or Bailer and Chisel
technique by tripod and
mechanical winch machine.
Tubewell boring machine
shall not be used. 700mm
diameter

Section- Bridge 4.11.01.04.01 Supplying and fabrication of kg 54049.000 115.257 One 6229525.593 Sixty-Two
4 : 12 Works Ribbed or deformed bar Hundred Lakh
reinforcement for all types of and Twenty-
RCC work including Fifteen Nine
straightening, removing ruts, point Two Thousand
cleaning, cutting, hooking, Five Five
bending, lapping and/or Seven Hundred
welding wherever required and
as directed, placing in Twenty-
position, tieing with 22 BWG Five point
black annealed binding wire Five Nine
(PVC coated in case of Three
FBEC rebar) double fold,
cost of binding wire and
anchoring to the adjoining
members wherever
necessary, supplying and
placing with proper cover
blocks (1:1), supports,
chairs, spacers, splices or
laps etc. including cost of all
materials, cost of labour,
cost of equipment &
machinery, loading and
unloading, transportation, all
other incidental charges and
work at all leads and lifts
etc. to complete the work as
per design, drawing,
specifications and direction
of the E-I-C. Measurement
relating to nominal mass,
dimensions and tolerances
of various types of steel
shall conform to relevant
BDS/ ASTM codes.
Reinforcement shall be
measured only in lengths of
bar as actually placed in
position on standard weight
i.e. 7850 kg/m3 (BNBC
Table 6.2.1) basis. No
separate payment shall be
allowed for chairs of any
shape & profile, spacer bar
of any shape & profile,
lap/splice & welding unless
otherwise shown in the
drawing, wastages, binding
wire etc. as the cost of these
is included in the unit rate.
Note: Tests for reinforcing
bars shall be conducted at
LGED/ BUET/ CUET/
KUET/ RUET/SUST. Grade
B500DWR: Deformed bar
produced and marked as
per BDS ISO 6935-2:2016
with minimum yield strength,
fy (ReH) = 500 MPa but fy

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 22/40
10/14/23, 7:00 PM View Form
(ReH) not exceeding 1.3
ReH, the ratio of actual
ultimate tensile strength,
fu(Rm) to actual yield
strength, fy(ReH) shall be at
least 1.25 and minimum
elongation after fracture
(A5.65) & minimum total
elongation at maximum
force (Agt) is 13% and 8%
respectively.[This
reinforcement shall be
selected as per instruction
given in the drawing & after
getting approval from
Design unit, LGED.] Using
retail rate of reinforcing bar

Welding: Providing and


making specified welding
conforming to AWS D1.4 by
electric arc welding for
construction of cast-in-situ
bored pile carefully with
highly oxidized electrodes
making the points prominent
and accepted by the One Lakh
Engineer-in-charge. The Twenty-
cost of all materials, labour, Nine
tools and plants, electricity Three Thousand
Section- Bridge
4.07.07.01 and all equipment is each 32340.000 3.996 point Nine 129230.640 Two
4 : 13 Works
included in this unit rate. Nine Six Hundred
Welding shall be carried out and Thirty
under the continuous point Six
direction of an experienced Four
and competent superisor.
SW: spot/tack welding at
contact point of the spirals
at reasonalbe intervals with
the main vertical
reinforcements of re-bar
cage to be placed in
borehole.

Welding: Providing and


making specified welding
conforming to AWS D1.4 by
electric arc welding for
construction of cast-in-situ
bored pile carefully with
highly oxidized electrodes
making the points prominent
and accepted by the
Engineer-in-charge. The
cost of all materials, labour,
Four
tools and plants, electricity Eighty-
Hundred
and all equipment is One
and
Section- Bridge included in this unit rate. Thousand
4.07.07.02 m 168.000 482.525 Eighty- 81064.200
4 : 14 Works Welding shall be carried out AND
Two point
under the continuous Sixty-Four
Five Two
direction of an experienced point Two
Five
and competent superisor.
LW: Direct type Lap-welded
splice over two sides of
contact by welding of
minimum length not less
than 10 times of bar
diameter unless otherwise
mentioned in the working
drawing at the lap of main
reinforcement in re-bar cage
to be placed in borehole.

Section- Bridge 4.07.03 RCC-25SCCM: Reinforced cum 215.980 17982.297 Seventeen 3883816.506 Thirty-
4 : 15 Works cement concrete work for Thousand Eight Lakh
cast-in-situ pile with Nine Eighty-
minimum cement content Hundred Three
relates to mix ratio 1:1.5:3 and Thousand
and maximum water cement Eighty- Eight
ratio 0.4 having minimum Two point Hundred
required average and

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 23/40
10/14/23, 7:00 PM View Form
compressive strength, f'cr = Two Nine Sixteen
33.5 MPa and satisfying a Seven point Five
compressive strength f'c = Zero Six
25 MPa at 28 days on
standard cylinders as per
standard practice of code
AASHTO/ ASTM and
cement conforming to BDS
EN 197-1 : 2003 CEM-II/A-
L/M/V/W 42.5N, high range
water reducing admixture of
complying type A or F under
ASTM C 494 (Doses of
admixture to be fixed by the
mix design), sand of
minimum FM 2.5 and 20mm
down well graded crushed
stone chips broken from
boulders (Preferably stone
chips from Madhyapara,
Dinajpur, LAA value not
exceeding 30) conforming to
ASTM C 33, including
breaking chips, screening
through proper sieves,
placing & maintaining re-bar
cage in position, jointing
longitudinal bars by welding
or re-bar coupling method,
placing and removing tripod/
derrick as per requirement,
mixing in standard mixture
machine with hoper,
maintaining allowable slump
of 150mm to 200mm,
placing a sliding plug or
barrier to prevent direct
contact between the first
charge of concrete in the
pipe of the tremie and the
water of drilling fluid,
pouring the concrete in bore
hole with the help of trimie
pipe, maintaining the trimie
pipe immersed in concrete
by at least 1.5m throughout
the period of concreting etc.
including cost of all
materials, labour, equipment
and all incidental charges
but excluding the cost of
reinforcement and its
fabrication, welding,
coupling and placing etc. all
complete as per design,
drawing, specifications and
direction of the E-I-C. The
contractor shall maintain a
continuous record of the
volume of concrete used
and the level of the concrete
in the pipe. Any deviations
from the theoretical, or
expected, volume/ level
relationship shall be
immediately reported to the
E-I-C. Additional quantity of
cement to be added if
required to attain the
specified strength to be
provided by the contractor at
his own cost. [Using
Concrete Mixture Machine
and retail rate of Cement]

Section- Bridge 4.07.23.03 SLT: Conducting static load each 1.000 119881.979 One Lakh 119881.979 One Lakh
4 : 16 Works test as per ASTM D 1143 or Nineteen Nineteen
equivalent standard for the Thousand Thousand
cast in situ/ pre-cast pile Eight Eight
providing required land Hundred Hundred

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 24/40
10/14/23, 7:00 PM View Form
development (earth and and
exavation, sand filling, sub- Eighty- Eighty-
base, cement concrete One point One point
work, bullah palisading etc.), Nine Nine
Crib wall (sand bags, brick Seven Seven
works, CC blocks etc.) Nine Nine
depending on test loading,
scaffolding, bracing, jacks,
pressure test gauge, loading
unloading, arranging other
necessary plants and
equipment including
staging, mobilization,
demobilization, cost of
empty gunny/ fertilizer/
plastic bag, concrete block/
steel sheet, sand and filling
sacs/ empty
gunny/fertilizer/plastic bags,
switching, loading and
unloading, record readings
and preparation of results in
standard forms and other
incidental charges as per
standard practice and
procedures including
submission of load test
report, furnishing all graph
and chart etc. complete in
all respects approved and
accepted by the E-I-C.
Before commencing load
test, Contractor shall submit
methodology along with
combined calibration report
for conducting load test to
the E-I-C for approval. The
Testing firm will be selected
taking prior approval of
procuring entity. The
methodology of static load
test and driving logs/ boring
& pouring logs shall be the
part of test report. Load Test
and Report shall be
conducted under the
supervision of a professional
Geotechnical Engineer
registered in the
Bangladesh Professional
Engineers Registration
Board (BPERB), Institute of
Engineers Bangladesh
(IEB). [Cost of Combined
Calibration Test (Hydraulic
Jack, pressure gauge &
electric/hydraulic pump) has
been included in all sub-
items.] Above 125 MT and
up to 175 MT

Section- Bridge 4.07.26.01 PIT (Pile Integrity Test): set 1.000 24975.412 Twenty- 24975.412 Twenty-
4 : 17 Works Conducting Low-Strain Four Four
Impact Integrity Testing on Thousand Thousand
cast-in-situ/ pre-cast piles in Nine Nine
accordance with ASTM D Hundred Hundred
5882 (Standard Test Method and and
for Low Strain Impact Seventy- Seventy-
Integrity Testing of Deep Five point Five point
Foundations) using pile Four One Four One
integrity tester containing Two Two
calibrated measuring
devices like highly sensitive
accelerometer, a
magnification device, an
amplification box, a small
impact device (hammer) & a
computer with ability to
convert data from analog to
digital form with graphical

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 25/40
10/14/23, 7:00 PM View Form
display on completion of
required setting/ driving of
piles, preparation of pile top
by removing soil, mud, dust
& chipping lean concrete
lumps etc., mobilizing and
demobilizing of equipment,
preparation of results in
standard forms and
compiling final report with
recommendations on the
tests etc. complete in all
respects approved and
accepted by the E-I-C.
Report should include
proper presentable graph of
same wave speed (m/sec),
impendence reduction,
interpretation of results,
cross sectional or material
changes (if any), length of
pile, concrete quality etc.
Routine test samples shall
be chosen by E-I-C on
random basis. Methodology
for conducting PIT shall be
submitted to the E-I-C for
approval and shall be the
part of PIT report. All pile
integrity tests shall be
performed and analyzed
under the supervison of a
professional geotechnical
engineer registered in the
Bangladesh Professional
Engineers Registration
Board (BPERB), Institute of
Engineers Bangladesh
(IEB). PIT on 10 (ten) nos.
piles or less of a single
bridge (up to 100km of
Dhaka/ nearby source to
site)

Section- Bridge 4.07.26.03 PIT (Pile Integrity Test): each 10.000 999.016 Nine 9990.160 Nine
4 : 18 Works Conducting Low-Strain Hundred Thousand
Impact Integrity Testing on and Nine
cast-in-situ/ pre-cast piles in Ninety- Hundred
accordance with ASTM D Nine point and Ninety
5882 (Standard Test Method Zero One point One
for Low Strain Impact Six Six
Integrity Testing of Deep
Foundations) using pile
integrity tester containing
calibrated measuring
devices like highly sensitive
accelerometer, a
magnification device, an
amplification box, a small
impact device (hammer) & a
computer with ability to
convert data from analog to
digital form with graphical
display on completion of
required setting/ driving of
piles, preparation of pile top
by removing soil, mud, dust
& chipping lean concrete
lumps etc., mobilizing and
demobilizing of equipment,
preparation of results in
standard forms and
compiling final report with
recommendations on the
tests etc. complete in all
respects approved and
accepted by the E-I-C.
Report should include
proper presentable graph of
same wave speed (m/sec),

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 26/40
10/14/23, 7:00 PM View Form
impendence reduction,
interpretation of results,
cross sectional or material
changes (if any), length of
pile, concrete quality etc.
Routine test samples shall
be chosen by E-I-C on
random basis. Methodology
for conducting PIT shall be
submitted to the E-I-C for
approval and shall be the
part of PIT report. All pile
integrity tests shall be
performed and analyzed
under the supervison of a
professional geotechnical
engineer registered in the
Bangladesh Professional
Engineers Registration
Board (BPERB), Institute of
Engineers Bangladesh
(IEB). PIT on each
additional pile after 10(ten)
piles tested.

Labour for breaking head of


hardened cast-in-situ bored
pile/ pre-cast piles to the
correct lines and levels from
the top of the piles to the
cut-off level as indicated in
the approved drawing and
exposing pile reinforcement
for embedment in pile cap
by any means and disposal
of the debris to an
unobjectionable place
outside the site premises
including scrapping and
removing concrete from
steel/ MS rods, straightening Three Twenty-
and bending of pile bars, Thousand Four
preparation and making of Five Thousand
platform where necessary, Hundred Nine
Section- Bridge
4.07.08 carrying, all sorts of cum 6.940 3591.464 and 24924.760 Hundred
4 : 19 Works
handling, stacking the same Ninety- and
properly after clearing, One point Twenty-
leveling and dressing the Four Six Four point
site and clearing the river Four Seven Six
bed, etc. all complete as per
direction of the E-I-C.
Measurement will be given
for the actual pile head
volume to be broken.The
debris from pile chipping
shall be disposed outside
the site premises at an
environmentally safe place
with minimum traffic
disruption and procuring
entity will not be responsilbe
for any irregularities by the
party regarding dumping of
the debris. [PWD 09.7)

Single layer brick flat soling


Forty
with 1st class or picked kiln Three
Thousand
burnt bricks in foundation, Hundred
Two
filling the interstices tightly and
Section- Bridge Hundred
4.06.02 with sand of minimum FM sqm 100.650 399.607 Ninety- 40220.445
4 : 20 Works and
0.50, watering, leveling, Nine point
Twenty
dressing, etc. all complete Six Zero
point Four
as per instruction of the E-I- Seven
Four Five
C.

Section- Bridge 4.06.03 PCC-10: Plain cement cum 7.546 10550.663 Ten 79615.303 Seventy-
4 : 21 Works concrete work in foundation Thousand Nine
with minimum compressive Five Thousand
strength of 10 MPa at 28 Hundred Six
days (sugessted mix and Fifty Hundred
proportion 1:3:6) on and

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 27/40
10/14/23, 7:00 PM View Form
standard cylinder as per point Six Fifteen
standard practice of Code Six Three point
AASHTO/ ASTM and Three
cement conforming to BDS Zero
EN 197-1 : 2003 CEM-II/A- Three
L/M/V/W 42.5N, sand of
minimum FM 1.8 and 20mm
down well graded 1st class/
picked brick chips (LAA
value not exceeding 40)
comforming to ASTM C 33
including breaking bricks
into chips, shuttering, mixing
by concrete mixer machine,
casting, laying compacting
and curing for the requisite
period etc. all complete as
per direction of the E-I-C.
Additional quantity of
cement to be added if
required to attain the
strength at the contractor's
own cost.

Section- Bridge 4.09.05.01 RCC-30SCCM: Reinforced cum 80.102 18587.771 Eighteen 1488917.633 Fourteen
4 : 22 Works cement concrete work with Thousand Lakh
minimum cement content Five Eighty-
and maximum water cement Hundred Eight
ratio as specified by the and Thousand
laboratory through mix Eighty- Nine
design having minimum Seven Hundred
required average strength, point and
f'cr = 38.5 MPa and Seven Seventeen
satisfying a compressive Seven point Six
strength f'c = 30 MPa at 28 One Three
days on standard cylinders Three
as per standard practice of
Code AASHTO/ ASTM and
cement conforming to BDS
EN 197-1 : 2003 CEM I
52.5N / ASTM C150 Type I,
high range water reducing
admixture of complying type
A or F under ASTM C 494
(Doses of admixture to be
fixed by the mix design),
sand of minimum FM 2.5
and 20mm down well
graded crushed stone chips
broken from boulders
(Preferably stone chips from
Madhyapara, Dinajpur, LAA
value not exceeding 30)
conforming to ASTM C33
including breaking chips,
screening through proper
sieves, cleaning, placing
shutter in position, making
shutter water-tight properly,
placing reinforcement in
position, mixing in standard
mixture machine with hoper,
maintaining allowable slump
of 100mm to 150mm,
casting in forms, compacting
by mechanical vibrator
machine, curing for 28 days,
removing centering-
shuttering after approved
specified time period, other
incidental charges, etc. all
complete as per drawing,
specification & direction of
the E-I-C. The cost of
reinforcement and it's
fabrication, welding,
coupling, placing, binding
etc. is not included but the
cost of admixture is included
in this unit rate. The Mix

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 28/40
10/14/23, 7:00 PM View Form
Design shall have to be
approved by the concerned
District Quality Control
Laboratory or any other
reputed laboratory approved
by the competent authority
before execution of the
work. [Using Concrete
Mixture Machine and retail
rate of Cement] For
foundation of Pier &
Abutment of Bridges and
Box Culverts

Section- Bridge 4.09.05.02.01 RCC-30SCCM: Reinforced cum 70.876 19440.421 Nineteen 1377859.279 Thirteen
4 : 23 Works cement concrete work with Thousand Lakh
minimum cement content Four Seventy-
and maximum water cement Hundred Seven
ratio as specified by the and Forty Thousand
laboratory through mix point Four Eight
design having minimum Two One Hundred
required average strength, and Fifty-
f'cr = 38.5 MPa and Nine point
satisfying a compressive Two
strength f'c = 30 MPa at 28 Seven
days on standard cylinders Nine
as per standard practice of
Code AASHTO/ ASTM and
cement conforming to BDS
EN 197-1 : 2003 CEM I
52.5N / ASTM C150 Type I,
high range water reducing
admixture of complying type
A or F under ASTM C 494
(Doses of admixture to be
fixed by the mix design),
sand of minimum FM 2.5
and 20mm down well
graded crushed stone chips
broken from boulders
(Preferably stone chips from
Madhyapara, Dinajpur, LAA
value not exceeding 30)
conforming to ASTM C33
including breaking chips,
screening through proper
sieves, cleaning, placing
shutter in position, making
shutter water-tight properly,
placing reinforcement in
position, mixing in standard
mixture machine with hoper,
maintaining allowable slump
of 100mm to 150mm,
casting in forms, compacting
by mechanical vibrator
machine, curing for 28 days,
removing centering-
shuttering after approved
specified time period, other
incidental charges, etc. all
complete as per drawing,
specification & direction of
the E-I-C. The cost of
reinforcement and it's
fabrication, welding,
coupling, placing, binding
etc. is not included but the
cost of admixture is included
in this unit rate. The Mix
Design shall have to be
approved by the concerned
District Quality Control
Laboratory or any other
reputed laboratory approved
by the competent authority
before execution of the
work. [Using Concrete
Mixture Machine and retail
rate of Cement] For

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 29/40
10/14/23, 7:00 PM View Form
diaphragm walls, wing walls,
piers, columns, projected
pile cap above water level,
pier caps, abutments of
bridges and vertical
members of box culverts For
height up to 5m

RCC-30SCCM: Reinforced
cement concrete work with
minimum cement content
and maximum water cement
ratio as specified by the
laboratory through mix
design having minimum
required average strength,
f'cr = 38.5 MPa and
satisfying a compressive
strength f'c = 30 MPa at 28
days on standard cylinders
as per standard practice of
Code AASHTO/ ASTM and
cement conforming to BDS
EN 197-1 : 2003 CEM I
52.5N / ASTM C150 Type I,
high range water reducing
admixture of complying type
A or F under ASTM C 494
(Doses of admixture to be
fixed by the mix design),
sand of minimum FM 2.5
and 20mm down well
graded crushed stone chips
broken from boulders
(Preferably stone chips from
Madhyapara, Dinajpur, LAA
value not exceeding 30)
conforming to ASTM C33 Twenty-
including breaking chips, Three
Twenty-
screening through proper Lakh
Four
sieves, cleaning, placing Sixty-Two
Thousand
shutter in position, making Thousand
Nine
shutter water-tight properly, Six
Section- Bridge Hundred
4.09.05.04.01 placing reinforcement in cum 94.600 24975.412 2362673.975 Hundred
4 : 24 Works and
position, mixing in standard and
Seventy-
mixture machine with hoper, Seventy-
Five point
maintaining allowable slump Three
Four One
of 100mm to 150mm, point Nine
Two
casting in forms, compacting Seven
by mechanical vibrator Five
machine, curing for 28 days,
removing centering-
shuttering after approved
specified time period, other
incidental charges, etc. all
complete as per drawing,
specification & direction of
the E-I-C. The cost of
reinforcement and it's
fabrication, welding,
coupling, placing, binding
etc. is not included but the
cost of admixture is included
in this unit rate. The Mix
Design shall have to be
approved by the concerned
District Quality Control
Laboratory or any other
reputed laboratory approved
by the competent authority
before execution of the
work. [Using Concrete
Mixture Machine and retail
rate of Cement] For T-girder
& slab type super-structure
including cross girders, side
walk, curb and wheel guard
of bridges For height up to
5m

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 30/40
10/14/23, 7:00 PM View Form

RCC-30SCCM: Reinforced
cement concrete work with
minimum cement content
and maximum water cement
ratio as specified by the
laboratory through mix
design having minimum
required average strength,
f'cr = 38.5 MPa and
satisfying a compressive
strength f'c = 30 MPa at 28
days on standard cylinders
as per standard practice of
Code AASHTO/ ASTM and
cement conforming to BDS
EN 197-1 : 2003 CEM I
52.5N / ASTM C150 Type I,
high range water reducing
admixture of complying type
A or F under ASTM C 494
(Doses of admixture to be
fixed by the mix design),
sand of minimum FM 2.5
and 20mm down well
graded crushed stone chips
broken from boulders
(Preferably stone chips from
Madhyapara, Dinajpur, LAA
value not exceeding 30)
Eighteen
conforming to ASTM C33 Sixty
Thousand
including breaking chips, Thousand
Five
screening through proper Two
Hundred
sieves, cleaning, placing Hundred
and
Section- Bridge shutter in position, making and
4.09.05.09 cum 3.240 18587.771 Eighty- 60224.378
4 : 25 Works shutter water-tight properly, Twenty-
Seven
placing reinforcement in Four point
point
position, mixing in standard Three
Seven
mixture machine with hoper, Seven
Seven
maintaining allowable slump Eight
One
of 100mm to 150mm,
casting in forms, compacting
by mechanical vibrator
machine, curing for 28 days,
removing centering-
shuttering after approved
specified time period, other
incidental charges, etc. all
complete as per drawing,
specification & direction of
the E-I-C. The cost of
reinforcement and it's
fabrication, welding,
coupling, placing, binding
etc. is not included but the
cost of admixture is included
in this unit rate. The Mix
Design shall have to be
approved by the concerned
District Quality Control
Laboratory or any other
reputed laboratory approved
by the competent authority
before execution of the
work. [Using Concrete
Mixture Machine and retail
rate of Cement] For Pre-cast
paving slab for bridge
footpath

Section- Bridge 4.09.05.08.02 RCC-30SCCM: Reinforced cum 5.490 17982.297 Seventeen 98722.811 Ninety-
4 : 26 Works cement concrete work with Thousand Eight
minimum cement content Nine Thousand
and maximum water cement Hundred Seven
ratio as specified by the and Hundred
laboratory through mix Eighty- and
design having minimum Two point Twenty-
required average strength, Two Nine Two point
f'cr = 38.5 MPa and Seven Eight One
satisfying a compressive One
strength f'c = 30 MPa at 28

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 31/40
10/14/23, 7:00 PM View Form
days on standard cylinders
as per standard practice of
Code AASHTO/ ASTM and
cement conforming to BDS
EN 197-1 : 2003 CEM I
52.5N / ASTM C150 Type I,
high range water reducing
admixture of complying type
A or F under ASTM C 494
(Doses of admixture to be
fixed by the mix design),
sand of minimum FM 2.5
and 20mm down well
graded crushed stone chips
broken from boulders
(Preferably stone chips from
Madhyapara, Dinajpur, LAA
value not exceeding 30)
conforming to ASTM C33
including breaking chips,
screening through proper
sieves, cleaning, placing
shutter in position, making
shutter water-tight properly,
placing reinforcement in
position, mixing in standard
mixture machine with hoper,
maintaining allowable slump
of 100mm to 150mm,
casting in forms, compacting
by mechanical vibrator
machine, curing for 28 days,
removing centering-
shuttering after approved
specified time period, other
incidental charges, etc. all
complete as per drawing,
specification & direction of
the E-I-C. The cost of
reinforcement and it's
fabrication, welding,
coupling, placing, binding
etc. is not included but the
cost of admixture is included
in this unit rate. The Mix
Design shall have to be
approved by the concerned
District Quality Control
Laboratory or any other
reputed laboratory approved
by the competent authority
before execution of the
work. [Using Concrete
Mixture Machine and retail
rate of Cement] For cast-in-
situ/ pre-cast railing and rail
post of bridges & box
culverts For cast-in-situ
railing and rail post

Twenty-
One Four
Providing nosing with MS
Hundred Thousand
angles of different sizes.
and Seven
including cost of all
Section- Bridge Twenty- Hundred
4.11.05 materials, welding, carrying, kg 190.846 129.872 24785.552
4 : 27 Works Nine point and
etc. all complete as per
Eight Eighty-
design, drawing and
Seven Five point
direction of the E-I-C.
Two Five Five
Two

Section- Road Works 3.06.2.2 TCHD@0.75: Providing tack sqm 139.064 79.921 Seventy- 11114.134 Eleven
4 : 28 coat @0.75kg/sqm with Nine point Thousand
60/70 penetration grade Nine Two One
straight run bitumen One Hundred
complying with the and
requirements of Fourteen
ASTM/AASHTO applied by point One
appropriate hand device at Three
a temperature between Four

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 32/40
10/14/23, 7:00 PM View Form
175°C and 185°C including
heating bitumen, surface
cleaning, etc. all complete
as per direction of the E-I-C.
[Retail]

40mmDC (BG-60/70):
Providing 40mm thick
(minimum) compacted pre-
mixed bituminous surfacing
- wearing course with 25mm
downgraded crushed stone
chips (LAA value < = 30%)
complying with the specified
grading requirement of the
relevant item of Road
Design standards, water
absorption not >2%,
flakiness index not >35%
mixed with 60/70
penetration grade straight
run bitumen satisfying the
requirements of
ASTM/AASHTO. The
bitumen and stone-chips
shall be separately heated
to a temperature 140°C ?
155°C and 150°C ? 170°C
respectively before mixing.
The mixing shall be done at
temperature between 140°C
? 160°C at a separate place
away from the fire. The
One Lakh
bitumen and stone-chips
Eight Twenty-
mixture shall be laid
Hundred Five
uniformly on the road
and Thousand
Section- surface in single appropriate
Road Works 3.06.5.2 sqm 139.064 899.115 Ninety- 125034.528 AND
4 : 29 layer to give specified
Nine point Thirty-
compacted thickness,
One One Four point
maintaining specified
Five Five Two
camber, grade and super-
Eight
elevation. The mixture
should be rolled at a
temperature not below 90°C
with appropriate Steel Drum
Roller (3-5 tons) &
pneumatic multiple tire roller
(8-10 tons) to full
compaction, including
supplying of all materials,
their carriage, labourers
tools and equipment etc. all
complete as per the
direction of the E-I-C. The
bitumen in the mix shall be
between @ 5.0% to 5.5% by
weight of total mix or as
determined by job mix
design. (In order to achieve
the specified grading a
blending of nominal
maximum size of 25mm,
19mm, 12mm, 6mm
crushed stone chips and
stone dust is suggested and
proportion will have to
determine by the laboratory
analysis).[Retail]

Section- Bridge 4.13.02.05 Providing & fixing rainwater m 15.400 199.803 One 3076.966 Three
4 : 30 Works down pipes including cost of Hundred Thousand
all materials, labours, and AND
equipment, transportation, Ninety- Seventy-
fixtures, accessories etc. at Nine point Six point
any level as per Eight Zero Nine Six
specification, drawings and Three Six
direction of the E-I-C.
RWDP75PVC: 75mm uPVC
Pipe of 2.9mm to 3.4mm

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 33/40
10/14/23, 7:00 PM View Form
wall thickness conforming to
BS 3505

RCC-35SCBP: Reinforced
cement concrete work with
minimum cement content
and maximum water cement
ratio as specified by the
laboratory through mix
design having minimum
required average
compressive strength, f'cr =
45 MPa and satisfying a
specified compressive
strength, f'c = 35 MPa at 28
days on standard cylinder
as per standard practice of
Code AASHTO/ ASTM and
cement conforming to BDS
EN 197-1 : 2003 CEM I
52.5N / ASTM C150 Type I,
high range water reducing
admixture of complying type
F/ G under ASTM C494
(Doses of admixture to be
fixed by the mix design) for
smart dynamic concrete (i.e.
Low fines self compacting
concrete), sand of minimum
FM 2.80 and 20mm down
well graded crushed stone
chips broken from boulders
(LAA value not exceeding
25) conforming to ASTM C
33 including breaking chips,
Seventeen Ninety-
screening through proper
Thousand Three
sieves, cleaning, placing
Nine Thousand
shutter in position, making
Hundred Two
Section- Bridge shutter water-tight properly,
4.09.07.01 cum 5.184 17982.297 and 93220.228 Hundred
4 : 31 Works placing reinforcement in
Eighty- and
position, mixing in
Two point Twenty
mechanized batch mix plant,
Two Nine point Two
pumping using line pump or
Seven Two Eight
boom placer, maintaining
allowable slump of 100mm
to 150mm, casting in forms,
compacting by mechanical
vibrator machine, curing for
28 days, removing
centering-shuttering after
approved specified time
period, other incidental
charges, etc. all complete as
per drawing, specification &
direction of the E-I-C. The
cost of reinforcement and
it's fabrication, placing,
binding etc. is not included
but the cost of admixture is
included in this unit rate.
The Mix Design shall have
to be approved by Central
Quality Control Laboratory
(CQCL), LGED or any other
reputed laboratory approved
by the competent authority
before execution of the
work. [Using Batching Plant,
Transit Mixer, Concrete
Pump and bulk rate of
Cement] For foundation of
Pier & Abutment of Bridges
and Facing Elements of
Reinforced/ Mechanically
Stabilized Earth Structure

Section- Bridge 4.13.06 DG: Supplying, fitting and each 22.000 399.607 Three 8791.354 Eight
4 : 32 Works fixing in position galvanized Hundred Thousand
drainage grating for bridge and Seven
decks made up by 200mm x Ninety- Hundred

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 34/40
10/14/23, 7:00 PM View Form
150mm outer frame of Nine point and
25mm x 25mm x 6mm Six Zero Ninety-
ASTM A 36 complied MS Seven One point
Angles and 4 nos. 25mm x Three Five
6mm ASTM A36 complied Four
MS flat bars, grating fitted
with 4 nos. BDS ISO 6935-
2: 2016 (Grade 400)
complied 12mm dia. anchor
bar 100mm in length by
welding and other
necessary fittings including
all labour, tools, plant,
equipment, machinery,
leads & lifts, fuel, electric
charges etc. complete in all
respect as per drawing,
specifications and direction
of Engineer-in-Charge. After
fabrication, grating shall be
given a hot dipped
galvanized coating.

WH: Providing weep holes


in Brick masonry/ Plain/
Reinforced concrete
retaining wall, abutment,
wing/ return wall, with 50 -
100 mm dia uPVC pipe
extending through the full
width of structure with slope Twenty-
1V : 20H towards draining Two
Two
face including hand packing Thousand
Hundred
of 0.85 cum pervious backfill One
and
Section- Bridge material (40mm - 63mm Hundred
4.13.04.01 each 74.000 299.705 Ninety- 22178.170
4 : 33 Works sized 1st class/picked brick and
Nine point
bats) wrapped in Geo-fabric Seventy-
Seven
(Grade-III-DF-40-2.3mm Eight point
Zero Five
thick) in the back of each One
weep hole etc. all compete Seven
as per direction of the E-I-C.
[Cost of uPVC pipe, Geo-
bag, brick bats, mortar etc.
is included in this item and
shall not be paid separately.]
WH50: Using 50mm dia
uPVC pipe

BF: Back filling behind


abutments, wing walls and
retaining walls with selected
granular material (50:50
best quality picked brick
chips & sand of min. FM
1.00) of minimum 450 mm
width, in layers of 150 mm One
Sixty-Six
thickness free from dust, Thousand
Thousand
impurities etc. including Four
Six
compaction using plate Hundred
Section- Bridge Hundred
4.13.03 compactor, watering & cum 44.472 1498.525 and 66642.404
4 : 34 Works and Forty-
dressing, supply & cost of all Ninety-
Two point
materials, carrying and Eight point
Four Zero
labour, hire charge of plate Five Two
Four
compactor and other tools Five
etc. all complete as per
direction of the Engineer-In-
Charge. Payment to be
made for the compacted
volume only for a
compaction of 90% of the
maximum dry density.

Section- Bridge 4.11.08 SLEB: Supplying, fitting and cum 57600.000 2.997 Two point 172627.200 One Lakh
4 : 35 Works fixing steel-laminated Nine Nine Seventy-
Elastomeric/ Neoprene Seven Two
bearings in exact positions Thousand
as per drawing, Six
specifications and direction Hundred
of the E-I-C including cost of and
all materials, labour, Twenty-
carrying etc. The set shall

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 35/40
10/14/23, 7:00 PM View Form
be of 100% virgin Seven
Chloroprene Rubber (CR), point Two
grades of raw elastomer of
proven use in elastomeric
bearings, with low
crystallization rates and
adequate shelf life viz.
Neoprene WRT, Neoprene
W, Bayprene 110, Bayprene
210, Skyprene B-5,
Skyprene B-30, Denka S-
40V and Denka M-40, shall
be used. No reclaimed
rubber or Vulcanized wastes
or natural rubber shall be
used. Use of synthetic
rubber-like materials such
as Ethyl Propylene
Dimonomer (EPDM),
Isobutane Isoprene
Copolymer (IIR) and Chloro-
Isoprene Copolymer (CIIR)
shall not be permitted.
Laboratory test to be
performed from BUET,
Dhaka for Elastomer
hardness limits determined
in accordance with ASTM D
2240 shall be 60 ± 5 duro,
minimum tensile strength
determined in accordance
with ASTM D 412 shall be
17 MPa, ultimate elongation
determined in accordance
with ASTM D 412 shall be
minimum 400%,
compression set value after
22 hours at 100 degree
centigrade determined in
accordance with ASTM D
395 Method B shall be
maximum 35%, Elastomeric
content determined in
accordance with ASTM D
297 shall not be less than
60%, Ash content
determined in accordance
with ASTM D 297 shall not
exceed 5%, Shear modulus
of elastomeric bearing
determined in accordance
with ASTM D 4014 shall
neither be less than 0.8
MPa nor greater than 1.2
MPa, the adhesion strength
of elastomer to steel plates
(Peel Strength) determined
in accordance with ASTM D
429 Method B shall not be
less than 7kN/m. One set of
Elastomeric Bearing must
be taken as extra for
laboratory test.

Section- Bridge 4.11.09 TF_Neo_Pad:Test fee for each 1.000 29970.495 Twenty- 29970.495 Twenty-
4 : 36 Works steel-laminated Elastomeric/ Nine Nine
Neoprene bearings Thousand Thousand
confirming to 100% virgin Nine Nine
Chloroprene Rubber (CR), Hundred Hundred
grades of raw elastomer of and and
proven use in elastomeric Seventy Seventy
bearings, with low point Four point Four
crystallization rates and Nine Five Nine Five
adequate shelf life viz.
Neoprene WRT, Neoprene
W, Bayprene 110, Bayprene
210, Skyprene B-5,
Skyprene B30, Denka S-
40V and Denka M-40, shall
be used. No reclaimed

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 36/40
10/14/23, 7:00 PM View Form
rubber or Vulcanized wastes
or natural rubber shall be
used. Use of synthetic
rubber-like materials such
as Ethyl Propylene
Dimonomer (EPDM),
Isobutane Isoprene
Copolymer (IIR) and Chloro-
Isoprene Copolymer (CIIR)
shall not be permitted.
Laboratory test to be
performed from BUET,
Dhaka for Elastomer
hardness limits determined
in accordance with ASTM D
2240 shall be 60 ± 5 duro,
minimum tensile strength
determined in accordance
with ASTM D 412 shall be
17 MPa, ultimate elongation
determined in accordance
with ASTM D 412 shall be
minimum 400%,
compression set value after
22 hours at 100 degree
centigrade determined in
accordance with ASTM D
395 Method B shall be
maximum 35%, Elastomeric
content determined in
accordance with ASTM D
297 shall not be less than
60%, Ash content
determined in accordance
with ASTM D 297 shall not
exceed 5%, Shear modulus
of elastomeric bearing
determined in accordance
with ASTM D 4014 shall
neither be less than 0.8
MPa nor greater than 1.2
MPa, the adhesion strength
of elastomer to steel plates
(Peel Strength) determined
in accordance with ASTM D
429 Method B shall not be
less than 7kN/m. One set of
Elastomeric Bearing must
be taken as extra for
laboratory test but excluding
cost of Bearing Pad

Section- Bridge 4.11.06.02 Supplying, fitting, fixing & m 15.400 29970.495 Twenty- 461545.623 Four Lakh
4 : 37 Works installation of expansion Nine Sixty-One
joints as indicated on the Thousand Thousand
drawing and conforming to Nine Five
the following specifications Hundred Hundred
and as directed by the E-I- and and Forty-
C. Strip Seal Expansion Seventy Five point
Joint: Providing and laying point Four Six Two
of Strip Seal type bridge Nine Five Three
deck expansion joint
catering to maximum
horizontal movement up to
80 mm including cost of all
materials (edge beams,
Strip seal, anchorage,
angle, bar, plate etc.),
fixtures, welding, preparing
surface for receiving joints,
installation in proper
position, labour charges,
testing of all materials in
approved laboratory,
handling, tools, equipment,
all leads and lifts etc. all
complete as per approved
drawing, specification and
direction of the E-I-C. The
Installation shall be done by

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 37/40
10/14/23, 7:00 PM View Form
the manufacturer/ supplier
or their authorised
representative ensuring
compliance to the
manufacturer's instruction
for installation. [The
concreting for joining the
expansion joint assembly
with the deck has not been
included in this analysis as
the same is catered in the
quantities of RCC Deck.]

Supplying, fitting and fixing


Eight One
18mm thick marble Name
Thousand Thousand
plate including cost of
Four Five
materials, labour, form work,
General, Site Hundred Hundred
Section- engraving neatly the
Facilities and 1.16 sqm 0.180 8491.801 and 1528.524 and
4 : 38 approved Sample given by
Safety Ninety- Twenty-
the engineer etc. complete
One point Eight point
as per drawings and
Eight Zero Five Two
direction of the Engineer-in-
One Four
charge.

RMP: Providing and


applying road marking paint
(lines, dashes, arrows, etc.)
on road hump, pedestrian
crossing, lane line, warning
line, barrier line, edge line,
zig-zag line, give-way
marking, etc. on road/plain
surface by brush/roller in
two coats with ready mixed
road marking paint, Forty-
including cleaning the Eight
Three
surface of all dirt, oils, Thousand
Hundred
grease, dust and other Nine
Section- and One
Road Works 3.12.07.1 contaminants, demarcation sqm 162.436 301.572 48986.149 Hundred
4 : 39 point Five
at site and traffic control and
Seven
involved. The finished Eighty-Six
Two
surface to be level, uniform point One
and free from streaks and Four Nine
holes, etc. all complete in all
respect as direction of the
Engineer-in-charge. Rate is
inclusive of cost of all
materials, labour machinery,
lighting, guarding,
maintenance of diversion
and all incidental charges in
this connection. Two coats
for new surface

Section- Road Works 3.12.08.01 RMP(By-TPC): Providing sqm 6.000 899.115 Eight 5394.690 Five
4 : 40 and applying road markings Hundred Thousand
of center line and stop line and Three
etc. with 5mm to 7mm thick Ninety- Hundred
hot applied thermoplastic Nine point and
compound including One One Ninety-
reflectorising glass beads @ Five Four point
250mgs per sqm area by Six Nine
special applicator machine
on road/plain surface,
including cleaning the
surface of all dirt, oils,
grease, dust and other
contaminants, demarcation
at site and traffic control
involved, the finished
surface to be level, uniform
and free from streaks and
holes, etc. all complete in all
respect as direction of the
Engineer-in-charge. Rate is
inclusive of cost of all
materials, labour machinery,
lighting, guarding,
maintenance of diversion

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 38/40
10/14/23, 7:00 PM View Form
and all incidental charges in
this connection.

Providing 3 sets as-built


drawings subject to
Engineer's approval
produced in AutoCAD
software in 584.5 mm x
413.5 mm (A-2 size)
standard drawing paper,
and operating and
maintenance manual of the
equipment and plant
incorporated in the works, if
any, in original by the date
stated in the particular
conditions of contract
(PCC). If the contractor
does not supply the as-built
drawings and operating &
maintenance manuals by Fourteen Fourteen
the date stated in the Thousand Thousand
particular conditions of Nine Nine
General, Site contract (PCC), or they do Hundred Hundred
Section-
Facilities and 1.09 not receive the Engineer-in- per tender 1.000 14985.137 and 14985.137 and
4 : 41
Safety charge's approval, the Eighty- Eighty-
Engineer-in-charge shall Five point Five point
withhold the amount stated One Three One Three
in the PCC from the Seven Seven
payments due to the
contractor.
The as-built drawings must
show the permanent works
as actually constructed and
reflect the revision of
drawings supplied to the
contractor during the
Contract as well as revisions
of drawings supplied to the
contractor during the
contract.
(One set of as-built
drawings shall be
considered for
measurement and payment)
[PWD 01.2.1]

RRSheeting: Supplying and


fixing retro-reflectorised
reflective sheeting on
cautionary, mandatory and
informatory traffic signs with
honey comb retro-
reflectorised (encapsulated One
lens type) reflective sheet of Thousand Nine
approved brand of different Nine Thousand
colour, including cleaning Hundred Three
Section- and washing the surface and Hundred
Road Works 3.12.10 sqm 4.680 1998.033 9350.794
4 : 42 and necessary scaffolding, Ninety- and Fifty
etc. including carriage of Eight point point
sheet to the site and fixing, Zero Seven
etc. all complete in all Three Nine Four
respect as per approved Three
drawing, specification and
direction of the Engineer-in-
charge. Rate is inclusive of
cost of all materials, labour
and all incidental charges in
this connection.

Section- Bridge 4.17.01.02.14 Supplying and laying m 30.000 14985.247 Fourteen 449557.410 Four Lakh
4 : 43 Works machine made pre-cast Thousand Forty-Nine
RCC pipes with collars of Nine Thousand
different diameter, length & Hundred Five
thickness including and Hundred
screening, grading and Eighty- and Fifty-
washing aggregates with Five point Seven
clear water, mixing, laying in Two Four point Four
steel forms, placing re-bars Seven One
in position, consolidating,
curing for at least 14 days

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 39/40
10/14/23, 7:00 PM View Form
including the cost of
formwork, lifting, loading
and unloading from factory/
yard, laying in position etc
including tools, plants,
testing etc. all complete as
per direction of the E-I-C.
The collars shall be of
200mm wide made by RCC
and having the same
strength as the pipes to be
jointed. The spirals shall end
in a complete ring/ turn at
both the ends of pipes and
collars. The cost of
reinforcement and it's
fabrication, welding,
coupling, placing, binding
etc. is included in this unit
rate. For Heavy Traffic:
Cross drains/ culverts/ outlet
and any other works
carrying heavy traffic having
suggested mix 1:1.25:2.5
with cement conforming to
BDS EN 197-1 : 2003 CEM I
52.5N/ ASTM C150 Type I,
20mm down well graded
stone chips broken from
boulder (LAA not exceeding
30), sand of minimum FM
2.5 and water reducing
admixture conforming to
ASTM C 494 Type -A or F
@ 1.75 liter per cubic meter
of concrete to attain a
minimum 28 days cylinder
strength of 30 MPa.
2000mm internal dia, wall
thickness not less than
170mm, Re-bar for pipe:-
circumferential: 22 turns -
10mmF for inner cage & 22
turns - 10mmF for outer
cage and longitudinal: 14
nos. - 10mmF for inner cage
& 14 nos. - 10mmF for outer
cage , Re-bar for Collar:-
circumferential: 3 turns -
8mmF for inner cage & 3
turns - 8mmF for outer cage
and longitudinal: 12 nos. -
8mmF for inner cage & 12
nos. - 8mmF for outer cage

Two Crore
Forty-
Grand
24750000.000 Seven
Total:
Lakh Fifty
Thousand

This Bill of Quantities is Electronically Signed by Mr. Abdul Madbor on behalf of M/S Mizan Enterprise-M/S Hazi Shariatullah Traders (JV)

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4676500&userId=400999&nture=Works&tenId=863275&procMtd=OTM 40/40