Professional Documents
Culture Documents
Vendor Name:- Vendor Code :- Die Applicable for Part : o RH o LH o Both RH & LH o Single Part Die Asset Code :
Vendor & Part Information
Stamper Name & Code No. of Parts Per Stroke : Die Start of Production (SOP) Month/ Year :
Child Part Name :- Die Maker :
:-
Die 3D Machining Data Availability (Y/N) : No. of Strokes Completed :
Child Part No:- Part Grade & Thick: 1. Die Assessment By 2. Die Assessment/Verification by MSIL: 3. Die Verification After Correction:
Operation No.: Operation Name.: Models Applicable :
Vendor:
Sr. No. Check Points Standard Condition Verification Criteria Vendor Observations MSIL Observations MSIL Observations
Die Preventive Maintenance Should be available and updated till Last 1 year details to be
1
Plan & Check sheet date checked
Die Repair Request & History Should be available and updated till Last 1 year details to be
2
Card date checked
After
(II) Die Condition Check Available in Current Current
Correction
Die Condition Condition Remarks Remarks
Condition
A Die Information (Y/N ) (√ / X / NA ) (√ / X / NA )
(√ / X / NA )
Basic Die Identification
1 Part , Operation No. & Name Details Visual
Information on Die
B Safety
F Structural Elements
Page 1 of 2
After
Available in Current Current
Correction
Sr. No. Check Points Standard Condition Verification Criteria Die Condition Condition Remarks Remarks
Condition
(Y/N) (√ / X / NA ) (√ / X / NA )
(√ / X / NA )
G Draw Tool Specific Vendor Observations MSIL Observations MSIL Observations
No Scratches/Peel-Off, Smoothness
10 Coating Check Chrome / PVD Visual
of male radius
Scratches/uniformity/Peel-
11 Coating Check Chrome / PVD Visual
Off/Smoothness of male radius
Vendor Declaration Sign off Initial Die Assess Condition Sign Off Final Die Assess condition/Status Sign Off
Tool Room / Maintenance Head Quality Head MSIL Team Vendor Team MSIL Team Vendor Team
Judgment ( For MSIL Use Only & Applicable only in case of Retooling/Refurbishment request raised to MSIL-SC by Vendor ) SRRS Request ID :
Page 2 of 2