Bill of Quantities
Bill of Quantities
Unit Total
Price Unit Price Price Total Price
ItemNo Group ItemCode DescriptionofItem MeasurementUnit Quantity
In In Words In In Words
figures (BDT) Figures (BDT)
(BDT) (BDT)
1 of 16 7/12/20, 10:15 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...
Reinforced cement
concrete works with
minimum cement
content relates to mix
ratio (tentative 1:2:4)
and maximum water
cement ratio 0.40
having minimum
required average
strength, f'cr = 26 Mpa
and satisfying a
specified compressive
strength f'c = 20 Mpa
at 28 days on standard
cylinders as per
standard practice of
Code AASHTO/ ASTM
and Portland
Composite Cement
conforming to BDS EN
197-1 : 2003 CEM-II
42.5N, best quality
sand of minimum FM
2.2, 20mm down well
graded crushed stone
chips (Preferably stone
chips from
Madhyapara, Dinajpur)
(LAA value not
exceeding 35)
conforming to ASTM C
33 or Aggregate
Grading Appendix-3
LGED Schedule of
Rates or any other
International
recognized envelop Three Three
and Water reducing Hundred and Hundred and
chemical admixture of Fifty-Three Seventy-Five
complying type A point Zero point One
under ASTM C 494, Zero One Three Three
in/c cost of breaking
chips, screening
through proper sieves,
cleaning and washing
thoroughly, centering,
shuttering in position,
with plain 16 BWG
steel sheet fitted over
38mm thick wooden
plank panels suitably
braced and Standard
size Bamboo Props
making shuttering fully
leak proof, placing of
reinforcement cage in
position, mixing the
aggregates with
standard mixer
machine with hoper,
fed by standard
measuring boxes,
maintaining allowable
slump of 75mm to
100mm casting in steel
forms, compacting by
Mechanical vibrators
and tapered rods and
curing at least for 28
days, removing
centering-shuttering
after approved
specified time period,
i/c cost of additional
testing charges of
materials and cylinders
2 of 16 7/12/20, 10:15 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...
RCC:1:2:4, 20MPa,
Stone Chips (SC):
Reinforced cement
concrete works with
minimum cement
content relates to mix
ratio (tentative 1:2:4)
and maximum water
cement ratio 0.40
having minimum
required average
strength, f'cr = 26 Mpa
and satisfying a
specified compressive
strength f'c = 20 Mpa
at 28 days on standard
cylinders as per
standard practice of Twelve One
Code AASHTO/ ASTM Thousand Thousand
and Portland Nine Hundred Four Hundred
Building
4 5.05.02.04.2 Composite Cement cum 0.110 12968.001 and 1426.480 and
Works
conforming to BDS EN Sixty-Eight Twenty-Six
197-1 : 2003 CEM-II point Zero point Four
42.5N, best quality Zero One Eight
sand of minimum FM
2.2, 20mm down well
graded crushed stone
chips (Preferably stone
chips from
Madhyapara, Dinajpur)
(LAA value not
exceeding 35)
conforming to ASTM C
33 or Aggregate
Grading Appendix-3
LGED Schedule of
Rates or any other
International
recognized envelop
and Water reducing
3 of 16 7/12/20, 10:15 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...
chemical admixture of
complying type A
under ASTM C 494,
in/c cost of breaking
chips, screening
through proper sieves,
cleaning and washing
thoroughly, centering,
shuttering in position,
with plain 16 BWG
steel sheet fitted over
38mm thick wooden
plank panels suitably
braced and Standard
size Bamboo Props
making shuttering fully
leak proof, placing of
reinforcement cage in
position, mixing the
aggregates with
standard mixer
machine with hoper,
fed by standard
measuring boxes,
maintaining allowable
slump of 75mm to
100mm casting in steel
forms, compacting by
Mechanical vibrators
and tapered rods and
curing at least for 28
days, removing
centering-shuttering
after approved
specified time period,
i/c cost of additional
testing charges of
materials and cylinders
required. Excluding the
cost of reinforcement
and its fabrication,
welding, coupling,
placing, binding etc.
additional quantity of
Plasticizer i.e. Water
reducing chemical
admixture of complying
type A under ASTM C
494 to reduce mixing
water required for
normal workability and
to maintain low water-
cement (W/C) ratio
(Doses of admixture to
be fixed by the mix
design from approved
laboratory instruction
by the Engineer)
Additional quantity of
cement to be added if
required to attain the
strength at the
contractor's own cost
etc. all complete as per
direction and approval
of the Engineer in
charge.Note : Using
Concrete Mixer. In Tie
Beam and Lintel : Add
for each additional
floor up to 5th Floor
4 of 16 7/12/20, 10:15 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...
minimum cement
content relates to mix
ratio (tentative 1:2:4)
and maximum water
cement ratio 0.40
having minimum
required average
strength, f'cr = 26 Mpa
and satisfying a
specified compressive
strength f'c = 20 Mpa
at 28 days on standard
cylinders as per
standard practice of
Code AASHTO/ ASTM
and Portland
Composite Cement
conforming to BDS EN
197-1 : 2003 CEM-II
42.5N, best quality
sand of minimum FM
2.2, 20mm down well
graded crushed stone
chips (Preferably stone
chips from
Madhyapara, Dinajpur)
(LAA value not
exceeding 35)
conforming to ASTM C
33 or Aggregate
Grading Appendix-3
LGED Schedule of
Rates or any other
International
recognized envelop
and Water reducing
chemical admixture of
complying type A Fifty-Nine Nineteen
under ASTM C 494, point Zero point Zero
in/c cost of breaking Zero One Four One
chips, screening
through proper sieves,
cleaning and washing
thoroughly, centering,
shuttering in position,
with plain 16 BWG
steel sheet fitted over
38mm thick wooden
plank panels suitably
braced and Standard
size Bamboo Props
making shuttering fully
leak proof, placing of
reinforcement cage in
position, mixing the
aggregates with
standard mixer
machine with hoper,
fed by standard
measuring boxes,
maintaining allowable
slump of 75mm to
100mm casting in steel
forms, compacting by
Mechanical vibrators
and tapered rods and
curing at least for 28
days, removing
centering-shuttering
after approved
specified time period,
i/c cost of additional
testing charges of
materials and cylinders
required. Excluding the
cost of reinforcement
5 of 16 7/12/20, 10:15 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...
RCC:1:2:4, 20MPa,
Stone Chips (SC):
Reinforced cement
concrete works with
minimum cement
content relates to mix
ratio (tentative 1:2:4)
and maximum water
cement ratio 0.40
having minimum
required average
strength, f'cr = 26 Mpa
and satisfying a
specified compressive
strength f'c = 20 Mpa
at 28 days on standard
cylinders as per
standard practice of Fifty-Seven
Thirteen
Code AASHTO/ ASTM Thousand
Thousand
and Portland Eight
Building Two Hundred
6 5.05.02.06.2 Composite Cement cum 4.358 13266.001 57813.232 Hundred and
Works and Sixty-Six
conforming to BDS EN Thirteen point
point Zero
197-1 : 2003 CEM-II Two Three
Zero One
42.5N, best quality Two
sand of minimum FM
2.2, 20mm down well
graded crushed stone
chips (Preferably stone
chips from
Madhyapara, Dinajpur)
(LAA value not
exceeding 35)
conforming to ASTM C
33 or Aggregate
Grading Appendix-3
LGED Schedule of
Rates or any other
International
recognized envelop
and Water reducing
6 of 16 7/12/20, 10:15 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...
chemical admixture of
complying type A
under ASTM C 494,
in/c cost of breaking
chips, screening
through proper sieves,
cleaning and washing
thoroughly, centering,
shuttering in position,
with plain 16 BWG
steel sheet fitted over
38mm thick wooden
plank panels suitably
braced and Standard
size Bamboo Props
making shuttering fully
leak proof, placing of
reinforcement cage in
position, mixing the
aggregates with
standard mixer
machine with hoper,
fed by standard
measuring boxes,
maintaining allowable
slump of 75mm to
100mm casting in steel
forms, compacting by
Mechanical vibrators
and tapered rods and
curing at least for 28
days, removing
centering-shuttering
after approved
specified time period,
i/c cost of additional
testing charges of
materials and cylinders
required. Excluding the
cost of reinforcement
and its fabrication,
welding, coupling,
placing, binding etc.
additional quantity of
Plasticizer i.e. Water
reducing chemical
admixture of complying
type A under ASTM C
494 to reduce mixing
water required for
normal workability and
to maintain low water-
cement (W/C) ratio
(Doses of admixture to
be fixed by the mix
design from approved
laboratory instruction
by the Engineer)
Additional quantity of
cement to be added if
required to attain the
strength at the
contractor's own cost
etc. all complete as per
direction and approval
of the Engineer in
charge.Note : Using
Concrete Mixer. In roof
slab of all types,
cantilever slab and
drop panels (excluding
floor slab of ground
floor at plinth level).
Add for each additional
floor up to 5th Floor
7 of 16 7/12/20, 10:15 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...
RCC:1:2:4, 20MPa,
Stone Chips (SC):
Reinforced cement
concrete works with
minimum cement
content relates to mix
ratio (tentative 1:2:4)
and maximum water
cement ratio 0.40
having minimum
required average
strength, f'cr = 26 Mpa
and satisfying a
specified compressive
strength f'c = 20 Mpa
at 28 days on standard
cylinders as per
standard practice of
Code AASHTO/ ASTM
and Portland
Composite Cement
conforming to BDS EN
197-1 : 2003 CEM-II
42.5N, best quality
sand of minimum FM
2.2, 20mm down well
graded crushed stone
chips (Preferably stone
chips from
Madhyapara, Dinajpur)
(LAA value not
exceeding 35)
conforming to ASTM C
33 or Aggregate
Grading Appendix-3
LGED Schedule of One
Eighteen
Rates or any other Thousand
Thousand
International Five Hundred
Building Two Hundred
7 5.05.02.07.2 recognized envelop cum 0.084 18209.001 1529.556 and
Works and Nine
and Water reducing Twenty-Nine
point Zero
chemical admixture of point Five
Zero One
complying type A Five Six
under ASTM C 494,
in/c cost of breaking
chips, screening
through proper sieves,
cleaning and washing
thoroughly, centering,
shuttering in position,
with plain 16 BWG
steel sheet fitted over
38mm thick wooden
plank panels suitably
braced and Standard
size Bamboo Props
making shuttering fully
leak proof, placing of
reinforcement cage in
position, mixing the
aggregates with
standard mixer
machine with hoper,
fed by standard
measuring boxes,
maintaining allowable
slump of 75mm to
100mm casting in steel
forms, compacting by
Mechanical vibrators
and tapered rods and
curing at least for 28
days, removing
centering-shuttering
after approved
specified time period,
i/c cost of additional
8 of 16 7/12/20, 10:15 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...
testing charges of
materials and cylinders
required. Excluding the
cost of reinforcement
and its fabrication,
welding, coupling,
placing, binding etc.
additional quantity of
Plasticizer i.e. Water
reducing chemical
admixture of complying
type A under ASTM C
494 to reduce mixing
water required for
normal workability and
to maintain low water-
cement (W/C) ratio
(Doses of admixture to
be fixed by the mix
design from approved
laboratory instruction
by the Engineer)
Additional quantity of
cement to be added if
required to attain the
strength at the
contractor's own cost
etc. all complete as per
direction and approval
of the Engineer in
charge.Note : Using
Concrete Mixer. In
sunshade, cornice,
railing, drop wall,
louver and fins
(Average 62mm to
87mm thick) Add for
each additional floor
up to 5th Floor
Supplying and
fabrication of Ribbed
or deformed bar
reinforcement for all
types of RCC work
including straightening,
removing ruts,
cleaning, cutting,
hooking, bending,
lapping and/or welding
wherever required as
directed, placing in
position, tieing with 22
BWG black annealed
binding wire (PVC
coated in case of One Lakh
FBEC rebar) double Eighty-One
fold, cost of binding Seventy-Eight Thousand Six
Building
8 5.06.01.02 wire and anchoring to kg 2329.342 78.001 point Zero 181691.005 Hundred and
Works
the adjoining members Zero One Ninety-One
wherever necessary, point Zero
supplying and placing Zero Five
with proper cover
blocks (1:1), supports,
chairs, spacers,
splices or laps etc.
including cost of all
materials, cost of
labour, cost of
equipment &
machinery, loading
and unloading,
transportation, all other
incidental charges and
work at all leads and
lifts etc. to complete
9 of 16 7/12/20, 10:15 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...
10 of 16 7/12/20, 10:15 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...
11 of 16 7/12/20, 10:15 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...
12 of 16 7/12/20, 10:15 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...
On exterior surface
applying as per
manufacturer
instruction specific
coat of weather coat of
approved quality and
colour delivered from
authorized local agent
of the manufacturer in
a sealed container.
Applying one vertical Forty
and one horizontal Two Hundred Thousand
Building coat for each coat and and Fifteen Seven
16 5.16.09.01 sqm 189.558 215.001 40755.160
Works successive coat is to point Zero Hundred and
be applied after drying Zero One Fifty-Five
up of previous coat by point One Six
brush/roller/spray in/c
cleaning, washing,
rubbing, as necessary
and sand papering the
surface and necessary
scaffolding, etc. all
complete for all floors
i/c cost of all materials
as per direction of the
E-I-C. 3 coat
13 of 16 7/12/20, 10:15 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...
Painting to dado,
skirting, out side plinth
wall from 6'' below GL
to plinth level with two
coats of synthetic
enamel paint of prior
approved colour and
brand over a coat of
priming. Applying one
vertical and one
horizontal coat for Six Hundred
One Hundred
each coat and and
Building and Ninety
19 5.16.10.04 successive coat is to sqm 3.660 190.001 695.404 Ninety-Five
Works point Zero
be applied after drying point Four
Zero One
up of previous coat by Zero Four
brush/ roller/ spray in/c
cleaning, washing,
rubbing, as necessary
and sand papering the
surface and necessary
scaffolding, etc. all
complete for all floors
i/c cost of all materials
as per direction of the
E-I-C.
14 of 16 7/12/20, 10:15 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...
50mmx50mmx6mm
size
15 of 16 7/12/20, 10:15 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...
44mm thick on an
average roof top
cement concrete
screed in proportion
(1:1.5:3) with Portland
Composite cement
(CEM II/AM, 42.5N)
and best quality sand
(minimum FM 2.5) and
12mm down well
graded crushed stone
chips broken from One Lakh
boulder ( LAA value Twenty-Seven
Six Hundred
not exceeding 33), Thousand
and
Building including Cement Four Hundred
23 5.12.18 sqm 195.173 653.001 Fifty-Three 127448.164
Works grouting, mixing and
point Zero
concrete, laying with Forty-Eight
Zero One
neat cement finishing point One Six
on the following day of Four
roof slab casting, cost
of all materials, labour
and transportation to
the site, finishing the
edges and corners,
curing for the requisite
period etc. all
complete as per
drawing, specification
and direction of the
E-I-C
Seven Lakh
Twenty
Thousand
Grand Total: 720093.606 AND
Ninety-Three
point Six Zero
Six
This Bill of Quantities is Electronically Signed by Ms. Abdul Hakim on behalf of M/s. Abdul Hakim