Pre Pour Placement Theoretical Actual Cum Actual Cum Total Actual Vol S/N Inspectio Inspection Ref. Pour Location Area Cube Reference Volume Volume Volume Slump Batch In Out Theoritical % Wastage Ordered (m3) n Date (m3) Ordered Ordered (m3) Volume (m3) (m3) 1