PROGRESS REVIEW OF
JAL JEEVAN MISSION
UTTAR PRADESH
BUNDELKHAND, VINDHYA REGION PROJECTS COMPONENT WISE PROGRESS

Intake Well
Water Treatment
Pipe Laying (KM) Overhead CWR FHTC
District Plant (WTP) Tank

Work Work Work Achi


Total Work Rest
No. of Completed to be Total Compl Rest to Pipe to be Pipe Pipe Total Total No. of Total No. of FHTC eve
be Com Comp
Intake (in Nos.) Comp No.
WTP
of eted
(in Complet Laid (KM) Laid Laid No.
OHT
of
plete CWR leted FHTC provided men
Well leted (KM) (in %) t (%)
by Nos.) ed by d (in (in
No.) No.)
Lalitpur
Jhansi
Mahoba
Chitrakoot

Banda
Jalaun
Hamirpur

Mirzapur 8 4 4 9 0 9 9592.3 9353. 97.51 270 152 49 38 356856 86404 24.21%


18 878 %
Sonabhadra

Grand Total
District: Mirzapur Physical Progress (%) 86.38%
No. of Packages No. of Schemes
8 9 Image 1 Image 2

No. of Villages Population Covered (2021)


Cov1590ered 2196652

No. of FHTC to be given Image 3 Image 4


Agency
NCC/MEGH/GVPR/GA INFRA/RAMKY
356856
BABA/MULTIURBAN

Intake Well Water Treatment Pipe Laying (KM) Overhead Tank CWR FHTC
Plant (WTP)

Total No. Work Rest to Work Rest to Total Total Work FHTC
Complete Total No. Complet
Pipe to Pipe Work
of Intake d (in be be be Pipe Laid No. Completed (in No. Complete Total No. FHTC provid
of WTP ed (in Laid Required provided ed
Well Complet Complete Laid (KM) (in %) OHT CWR d (in
Nos.) ed by Nos.) d by (KM) Nos.) Nos.) (%)

8 4 4 9 0 9 9592. 9353. 97.51% 270 152 49 38 356856 86404 24.21%


318 878
District: Mirzapur Name of Scheme: Ahugi Kala GOV WSS
Physical Progress (%) 90.00
Population % to be given
No. of FHTC
No.
No. of Villages
of Packages Agency
Cov53ered Base Yr. :-
35109 NCC
Design Yr. :-

Village Commissioning Plan


Intake WTP
Overhead
Well (___ Pipe Laying (KM) CWR FHTC
(____MLD) MLD) Tank Total No. of Villages

Till 15-03-2023

Total No. of FHTC


Total No. of OHT
Pipe Laid (in %)
Pipe Laid (KM)

FHTC provided

FHTC provided
Total No. CWR
Completed

Completed
Pipe to be
Laid (KM)

Work Work Till 31-03-2023

(%)
Completed Complete
(in %) d (in %)
Till 15-04-2023

Till 30-04-2023
90% Till 15-05-2023
Functional Will be 1401. 1352 96.48 25 20 9 5 35109 6554 18%
completed by 662 .387 %
31/03/2023
Till 31-05-2023
District: Mirzapur
Photographs of Ahugi Kala GOV WSS

WTP along with


INTAKE WELL
Cascade Aerator WTP

Intake Well WTP – Cascade Aerator WTP

FHTC
CWR OHT (in working
condition)

CWR OHT FHTC