Rs 102.09
BUDGET HEAD :
SUBMITTED BY
PHED DIVISION - BARI
1
ERNMENT OF RAJASTHAN
TH ENGINEERING DEPARTMENT
PROPOSAL
OF
Y CONSTITUENCY : BASERI
DISTRICT : DHOLPUR
ESTIMATED COST
SUBMITTED BY
ED DIVISION - BARI
2
Annexture 'Á'
CHECK LIST FOR SUBMISSION OF NEW PROPOSALS OF RURAL WATER SUPPLY SCHEMES
Name of Scheme Conversion of Handpump Scheme Kuiya to Piped WSS under jal
jeevan mission
Name of District Name of Name of MLA
Block BASERI constituency BASERI
Name of Village(s) & Habitations Population
As per 2011 2021 (as per district 2036 Design Population
KUIYA(075394) census growth rate 28% ) (15 Y + Execution period)
1013 1229 1450
Name of Line Agency (PHED/PRI/Local
Body/other, if any) PHED
Brief of Existing water supply scheme (Type
of Scheme) HANDPUMP SCHEME
Necessity of Current Proposals Present average service level <10 lpcd. Handpump Scheme.
Details of Production Present Demand Present Production (KLD) Design Demand Balance Demand
(KLD) (KLD) (KLD)
68 100 100
Service Level Present (LPCD) Design (LPCD) 55
Brief of components of Existing Scheme Source (type CWR (KL) Pump House Transmission Main OHSR
and No)
Length (in
Material Size(mm) Mtrs)
NIL NIL NIL
-
Pumping Machinary Distribution Pipe line
Material Size Length (in
Mtrs) -
- - -
Brief of Design parameters adopted Wheather As per latest PHED guidelines issued by TC
Enclosed or Not
Selection of Pipe material as per pipe Enclose/Not enclosed) Enclosed
policy
Brief of Proposed components Source (type CWR (KL) Pump House Transmission Main GLR
and No) Material Size Length (in
Mtrs)
HDPE PE-
90 MM 700
80,PN-10
P/M Distribution Pipe line
ESR No KW Material Size Length (in
Mtrs)
75 mm 1900.00
140 mm 350.00
Drawings (wheather Layout Plan L-section HGL (Various type of Village Map Related part SLD of Pumping
enclosed or Not Valves marked or not) (NAJARIA of GT Sheet Station
Naksha)
Drawings (wheather
enclosed or Not
Enclosed NA NA Enclosed NA NA
(Note: location of Existing and proposeed sources, Feeder Mains, pump house, GLR/CWR/ESR, Distribution pipe line and other details shall be
marked on village map)
Bugdet Availability
Chargable Head (detailed) Under JJM/4215 STATE PLAN ( R )
General Abstract of Cost Wheather Estimated Cost (Rs in
Enclosed or Not
Enclosed Lacs) 102.09
Inspection Report of SE/EE/AE Wheather
Enclosed or Not Enclosed
6
7
6
Data entryof existing FHTCs in rural area under
JJM on website ejalshakti.gov.in;work includes
visiting the village for collecting basic data
consumers like i.e.adhar no/tation card/voter id
Each 206 30 6180.00
/BPL card /Driving licence/password/PAN card
/any data card/mobile no.etc.and entering the
details on the above website. The cost also
includes computer and operater.
TOTAL 9300349.40
Add 5% Contigency 465017.47
7 Provision for DPR Prepration under scheme. 1 20000.00
TOTAL(PART-A) 9785366.87
PART - B - (Provision for functional household tap connections.)
1 Provision for functional household tap
Each 206 2057.00 423742.00
connections.(FHTC) under scheme.
Total (Part - B) 423742.00
Grand Total (Part - A + Part - B) 10209108.87
Total Scheme cost in Lacs 102.09
7
Conversion of Handpump Scheme Kuiya to Piped WSS under jal
jeevan mission
DESIGN OF POPULATION
Design population for the present year 2021 for the village has been projected as 1.2131 times of
2011 census. The rate of water supply has been kept as 55 LPCD being a rural village and growth
rate presumed @ 21.31% per decade.
As per norms prescribed by the department the scheme has been designed @ 55 LPCD
Existing Production = 0
DEMAND DEFICIT
Hence the scheme has been designed for demand deficit of 100
1 Proposed-TW1 10 8 80
Total 80
80
It has been proposed to construct Tubewell as new source for this village.
NAME OF WORK:- CONSTRUCTION WORK OF 200 mm DIA TUBE WELL WITH PUMP
MACHINARY FOR PIPED WATER SUPPLY SCHEME OF VILLAGE KUIYA
ESTIMATE
16 Sq mm 4 Core
13 CE (Tech) Plate Earthing as per IS:3043 with GI earth plate of
BSR size 600*600*3.0 mm by embodying 3 to 4 m
2021 below ground level with 20 mm GI "B" class
Item 2.21 watering pipe including all accessories like nuts &
bolts, reducer, nipple, wire meshed funnel and C.C.
cinished chamber cover with hinged type with Each 1.00 3150.00 3150.00
locking arrangement CI frame of size 300x300 mm
complete with alternate layers of salt &
charcol/coke, testing of earth resistance as
required.
200 mm dia.
15 CE (Tech) Providing & Lowering in tubewell ISl marked GI
BSR Pipe "B" class as per IS: 1239 or amended up to
2021 date threaded and double flanged (welded) on both
Item ends and two number 25 x 3 mm flat welded on
2.24.4 both ends between pipe & flange, rubber washer & R.Mtr. 3.00 825.00 2475.00
nut bolts etc. complete in all respect.
80 mm
16 CE (Tech) Providing & Lowering in tubewell lSI marked HDPE
BSR pipe as per IS 4984: 1995 or amended upto date in
2021 PE 80 grade and class PN 10 of following dia.
Item including HOPE/GI fittings and PVC rope
2.25.4 confirming to IS 5175:1992 or amended upto date, Each 90.00 261.00 23490.00
along with clamping of submersible cable etc.
complete in all respect.
75 mm OD ( 63 mm ID)
17 CE (Tech) Providing, installing, testing and commissioning of
BSR double flanged bulk flow meter with removable
2021 mechanism, of class B conforming to ISO 4064/1
Item or amended upto date of approved make including
2.26.3 cost of all material and labour as per specifications
with GI Box (sheet 16 SWG) suitable with locking
arrangement of following dia. Each 1.00 14951.00 14951.00
2.26.3
Each 1.00 14951.00 14951.00
80 mm dia.
Size 40 mm dia
Total Rs. 614928.40
TOTAL 1776761.00
Rates are based on PHED BSR-2021 & PWD BSR Circle Dholpur
pur
Amount
1277100.00
476784.00
7877.00
15000.00
1776761.00
1776761.00
TANT ENGINEER
SUB DIV. BASERI
Conversion of Handpump Scheme Kuiya to Piped WSS under jal
jeevan mission
Proposed OHSR in Village Kuiya To cover each household by tap connection under scheme
in whole village . A complete distribution network will be provided in the all villages under
scheme. Design of distribution network will be taken as following.
Name of work:- Providing, Laying & Jointing of Pipe Line under Piped Water Supply Scheme Kuiya.
Rates are based on PHED BSR-2021
S.NO. BSR Particulars Unit Qty. Rate Amount
Providing, lowering, laying and jointing in trenches, standard
lengths HDPE ISI marked Pipes as per IS-4984: 1995
(amended upto date) with necessary jointing material like
mechanical connectors, i.e. thread/ insert joint/ quick release
coupler joint/ compression fitting joint or flanged joint and
specials jointing pipe by electro fusion welding method,
including all taxes , transportation and freight charges,
inspection charges, loading/ unloading charges, stacking of
pipes, including cost of labour and material, specials (Tee, bend
PHED
1 BSR etc.), satisfactory hydraulic testing, disinfection etc. complete as
2021 per technical specifications and direction of Engineer-in-charge
of following class and diameter. (excluding earth work) .
Note : Providing and fixing of all requisite specials as per
drawing, design and layout are inclusive in RM measurement of
the item and shall not be paid separately.
Supply may be in coil or straight length in 6 M/12 M.
TOTAL 3645429.00
#REF!
Say's 100KL
Name of work:- Construction of RCC Reservoirs under Piped Water Supply Scheme Kuiya.
Rates are based on PHED BSR-2021
S.No. BSR Ref. Particulars Unit Qty. Rate Amount
1 BSR Construction of RCC INTZE type Head Service Reservoir of following capacity
PHED and staging consisting of excavation in all types of strata, RCC work, cement
2021 plaster with water proofing compound to the inner face of the container including
Chapter 3 refilling disposing off the surplus stuff, plinth protection , all labour and material
Item charges including providing and fixing of accessories such as ladder , manhole
No.3.2 frame and covers, water level indicator (float type), ventilator with SS screen,
lightening arrestor, float valve, puddle collar, G.I. pipe railing around walk way
and top dome, providing RCC staircase from 4.5 mtr height of ground level to
top level, chambers for all valves, providing and applying three coats of cement
paint to the external surfaces of container, column, bracing, carbonation paint
on external surface of top dome, food grade epoxy paint on internal surface and
giving satisfactory hydraulic test and water tightness test as per I.S. code, etc.
complete in all respect as per design data, criteria, obligatory requirements and
detailed specifications, scope of work and GA drawing. The job includes
conducting SBC test, design and proof check of reservoirs (if required),painting
the name of the scheme and other details on the reservoir, providing alluminium
portable ladder suitable to reach at height of 4.5 Mtr(start of RCC reservoir) and
any other work related to structure as per the directions of Engineer-in- Charge,
Technical Specification and Scope of Work .
3.2.1 The rate indicated below are excluding the cost of pipes, specials and valve
required for inlet, outlet, washout, overflow piping arrangement, but inclusive of
DI puddle collar for inlet, outlet, overflow and washout pipe of appropriate sizes Litre
to be embedded in concrete.
Below mentioned rates are for raft foundations with soil bearing capacity (SBC)
of 10 MT/sqm and applicable for SBC more than or equal to 10MT/sqm and less
than 18MT/sqm. These rates shall be increased or decreased for variation in
SBC as below:
3.2.1.3 Below mentioned rates are for raft foundations with soil bearing capacity (SBC)
more than 5 MT/SQM and upto 8 MT/SQM tonnes per square metre add 7.5%. Litre 0.00
Rates for RCC OHSR, seimic zone II and staging 18 Meter.
1.1 3.2.4.1 100 KL capacity Litre 100000 25.18 2518000.00
BSR Providing and fixing double flanged ISI marked DI Class K-9 pipes as per IS:8329-2000
PHED (amended up to date), as vertical pipes for RCC Reservoirs including specials required such
as duck foot bend, bend, tee etc. providing and fixing clamps at every 3 mtr, jointing
2021 materials such as nuts, bolt, rubber packing, hydraulic testing etc. complete in all respect up
2 Chapter 3 to and from valve chamber as per direction of EIC, Technical Specification and Scope of work.
Item
No.3.7
2.1 3.7.2 150 mm dia (Raising,Distribution & Over Flow Pipe Line,Bypass) Mtr. 91 2801 254891.00
2.2 3.7.1 100 mm dia (Drain Out Pipe Line) Mtr. 23 1947 44781.00
S.No. BSR Ref. Particulars Unit Qty. Rate Amount
Providing, lowering, aligning, fixing in position in pipe line at work site, DI D/F Resilient seated (soft
seated) Sluice Valves (Gate Valves) , Vacuum tight(bubble tight), straight and pocket less body
passage of approved make of following class & dia complete confirfing to BS-EN-1171/ AWWA C-509
and of following specifications: Body & bonnet of Ductile cast iron of grade GGG40/GGG50 as per
DIN 1693 or GR SG-400/12 as per IS 1865 or equivalent grade as per IS :3896-part2-1985 and
subsequent revisions, Wedge of same material as body & shall vulcanised rubber lined with EPDM
(food grade quality) and seals of NBR Face to face dimensions as per BS 5163-89/ IS 14846/2000
(amended up to date) /Din 3202 F4, Stem/ spindle of SS (AISI 316 or equivalent) Electrostatic epoxy
PHED powder(EP-P)/ Fusion bond epoxy ( Non-Toxic- suitable for drinking water) coated with minimum
BSR 2021 thickness of 250 microns inside and outside, Drilled as per IS 1538. Nut-Bolt confirming to IS:1363
4 Chapter 6 and IS: 1367 (Galvanised steel) Insersion rubber of black EPDM 6mm thick. Suitable support
Item no. structure as per directions of EIC, Sluice valves including all jointing & jointing material, labour,
testing and commissioning along with pipe line as per Technical Specifications and as per direction of
6.8 Engineer-in-charge.
Note: Rates are exclusive of tail piece/ dismantling joints and earth work.
TOTAL 2907051.00
SAY 2907051.00
Name of work:- Power connection for new proposed tubewells/pump house under Piped Water
Supply Scheme Kuiya .
Name of work:- Power connection for new proposed tubewells/pump house under
Piped water supply scheme .
TOTAL 350000.00
TOTAL 2057.00
Junction JN -A
L= 3300m
Hdpe pe-
80 pn-10 ,
90 mm dia