Haryana at a Glance
Number of Consumers 72.13 Lakh
Circle 21
Division 60
Total Connected Load 32638.96 MW
Peak Demand 11001 MW
Total LT Line 127274.77
LT Line (Bare Conductor) 90737.12
LT AB/UG Cable 36537.65
11 KV Lines ( Overhead ) 144930.6
33 KV Lines ( Overhead ) 7945.24
11 KV and 33 KV U/G Cables -
Feeders >10 km Length -
HT: LT Ratio 1.16
No. of Power S/s 819
Haryana- District Map Capacity of Power Trf. 14368.4
Number of DTs 622510
Population 2.54 Crore
Capacity of DTRs 27825.57
Area 44,212 sq km
District 22 1
UHBVN- Overview as on 31.03.2022
UHBVN at a Glance
Number of Consumers 3373184
Per Capita Consumption 4.06 kwh
Circle 10 Nos.
Division 30 Nos.
Total Connected Load 13695.16 MW
Peak Demand 5725 MW
Haryana (UHBVN)
District Map Total LT Line 55665 CKm
LT Line (Bare Conductor) 45945 CKm
LT AB /UG Cable 9720 CKm
11 KV Lines ( Overhead ) 60988 CKm
11 KV Lines ( UG+AB cable ) 1115 Ckm
33 KV Lines ( Overhead ) 3487.77 CKm
Feeders >10 km Length Less than 50% feeders
Population 1.11 Crore HT: LT Ratio 1.09
No. of Power 33/11S/s 392 Nos.
Area 20,278 Sq KM
Capacity of Power Trf. 7916.7 MVA
District 10 Number of DTs 305650 Nos. 2
Summary of the RDSS projects Costs
Name of Scheme
Reform-based & Result-linked Revamped
Distribution Sector Scheme (RDSS)
* Excluding PMA Charges (PMA Charges sanctioned for Comp A is Rs. 4.78 Cr. And for Comp B is 13.75 Cr, extra.
* * Proposed work cost only as Modernization work (SCADA+UG Cable etc.) will be Sanctioned in next Phase/FY
REVAMPED DISTRIBUTION SECTORS SCHEMES (RDSS)
•Funding Sources (GBS, STATE DEBT, GRANTS,FI LOANS ETC.)
As per the scheme Guidelines, Funding Pattern under the scheme is given below:
Description Gross budgetary support (GBS) % Max
Prepaid Smart metering solution at consumer ,DT, 15%/22.5% as the case may be (limited upto Rs 900 to Rs
and feeder level including integration of existing 1350 respectively per meter for consumer metering)
infrastructure
Other costs including encumbrance free standardized 100%
billing modules for all states ,data management ,data
analytics and support to implementation etc.
Distribution Infrastructure works including SCADA, 60% for Non-Special Category or 90% for Special Status
DMS, AB cables, feeder segregation etc Category
Training & Capacity Building and other Enabling & 100%
supporting Activities(Part-B)
DISCOM Contribution 40%
FI/Loan Component
Smart Metering & AMR Meter (A)
Total Total
Total Qty.
Sr No Item Description Unit Amount In Total Qty.(DHBVN) Amount In
(UHBVN)
Cr) Cr.
** Proposed work only as Modernization work will be Sanctioned in next Phase/FY *Work has been Sanctioned under LRP Component
Infrastructure Creation for Implementation of SCADA A Town
10