You are on page 1of 11

Annexure-1

Feeder Level Loss and Loss Reduction Measure

Reconductoring Works

LT Bare Replace
Length of
Feeder Loss Loss es to AB/ m ent of
S. No Division feeder
Name (in %) (in MUs) covered LT Bare
(in kms)
convers with new
ion (in Bare
ckm) (ckm)

1
2
3
4
5
Loss Reduction Measures - <Insert District Name>
Agriculture Feeder
Reconductoring Works Segregation HVDS DTs

Replacem ent/ HT Line LT Line DTs HT Line LT Line DTs New DTs Replace
augmenta tion in (ckm) in (ckm) (no s.) in (ckm) in (ckm) (no s.) (no s.) m ent of
of HT (ckm) damaged
DTs with
same
capacity
(nos.)
DTs
DTs

Augment
a tion of
overload
e d DTs
with
higher
(nos.)
capacity
DTs
Annexure-1
West Tripura - Feeder-wise proposed

Reconductoring Works

LT Bare Replacem ent Replacem


to AB/ of LT Bare ent/
Length of AT & C
Feeder Loss es covered with new Bare augmenta
s.no Division feeder Loss
Name (in MUs) convers (ckm) /New LT tion of HT
(in kms) (in %) ion (in Line (AB (ckm)
ckm) Cable) (Feeder (Feeder
Bifurcation) Bifurcatio
n)

1 ED- I
(Banamalipur) BSNL 4.8 0 0.46 2

2 ED- CC (Capital
Complex) Kalikapur 6.7 0 0.64 3

3 ED-II (Bordowali)
Fultoli 16.7 0 1.6 6

4 ED- JRN (Jirania) Factory 26.9 900 2.58 15


5 ED- MNP
(Mohanpur)
( Franchisee
Division)
eeder-wise proposed work
Agriculture Feeder
Segregation HVDS DTs

HT Line LT Line DTs HT Line LT Line DTs New DTs Replace Augment
in (ckm) in (ckm) (no s.) in (ckm) in (ckm) (no s.) (no s.) m ent of a tion of Armored
damaged overload Service
DTs with e d DTs cable
same with from Pole
capacity higher to Meter
DTs (nos) capacity
DTs (nos)

0 0 0 0 0 0 1 N/A N/A N/A

0 0 0 12 3 10 1 N/A N/A N/A

0 0 0 25 8 22 3 N/A N/A N/A

0 0 0 85 25 83 10 N/A N/A N/A


Servic
cable
from
Meter to
Conumer
Distributi
on Board

N/A

N/A

N/A

N/A
Annexure-1
District- North Tripura - Feeder-wise proposed work under Loss Reduction

Length of
AT & C Losses (in
s.no Division Feeder Name feeder
Loss (in %) MUs)
(in kms)

ED-
1 DMR(Dharmanagar) Padmapur Feeder
ED-
2 DMR(Dharmanagar) Chandrapur Feeder
ED-
3 DMR(Dharmanagar) Rajbari Feeder
ED-
4 DMR(Dharmanagar) Nayapara Feeder
ED-
5 DMR(Dharmanagar) Spare Feeder
ED-
6 DMR(Dharmanagar) Station Feeder
ED-
7 DMR(Dharmanagar) Dharmanagar-I Feeder
ED-
8 DMR(Dharmanagar) Chandrapur Feeder
ED-
9 DMR(Dharmanagar) Shanicherra Feeder
ED- 75.1
10 DMR(Dharmanagar) Sarala Feeder 10 0.181
ED- 63.1
11 DMR(Dharmanagar) Ragna Feeder 8 0.059
ED- 21
12 DMR(Dharmanagar) Kameswar Feeder 7.06 0.08
ED-
13 DMR(Dharmanagar) Border Feeder 37 0.04 0.01
ED-
14 DMR(Dharmanagar) Spare Feeder 0 0
ED-
15 DMR(Dharmanagar) RAGNA
ED-
16 DMR(Dharmanagar) SARALA
ED-
17 DMR(Dharmanagar)
BORDER
ED-
18 DMR(Dharmanagar)
KAMESWER
ED-
19 DMR(Dharmanagar)
22 0.03
Kadamtala Feeder 35
ED-
20 DMR(Dharmanagar)
39 0.04
Churaibari Feeder 62
ED-
21 DMR(Dharmanagar)
37 0.06
Ranibari Feeder 90
ED-
22 DMR(Dharmanagar)
42 0.07
Premtala Feeder 55
ED-
23 DMR(Dharmanagar)
18 0.01
Borgul Feeder 22
ED-
24 DMR(Dharmanagar)
13 0.001
Border Feeder 25
ED-
25 DMR(Dharmanagar)
Station Feeder
ED-
26 DMR(Dharmanagar)
Temple UG

ED-
27 DMR(Dharmanagar)
Maharani

28 ED-UDP(Udaipur) Fotamati
29 ED-UDP(Udaipur) Halflong Feeder 35 45 0.04
30 ED-UDP(Udaipur) Anandabazar Feeder 44 45 0.04
31 ED-UDP(Udaipur) Arjuna Feeder 29 38.8 0.02
32 ED-UDP(Udaipur) DM Quarter Feeder 12 15.1 0.01
33 ED-UDP(Udaipur) Station Feeder 0 0 0
34 ED-UDP(Udaipur) Dharmanagar-II Feeder 58 50 0.06
35 ED-UDP(Udaipur) Maheshpur Feeder 18 35 0.019
** Please add feeder if required.

Total scope of work


work under Loss Reduction Part Of RDSS Scheme

Reconductoring
Feeder Bifurcation Work HVDS
Works

LT Bare to AB/ HT Line LT Line DTs HT Line LT Line DTs


covered convers ion in (ckm) in (ckm) (no s.) in (ckm) in (ckm) (no s.)
(in ckm)

12 102.3 123 96 0 0 0 bishnupur,sarala gp


12 85.8 103.5 78 0 0 0 wchandrapur, bhagyapur, ragna,
1.5 13.3 49.7 26 0 0 0
0 37 0 10 0 0 0
0 0 0 0 0 0 0

62
131

148 14 35 28

112

27

30 1 1 3
30 4 1 3 3 2 3
20 5 3 4
5

45 10 4 5
10 2 1 1

555 15 3.16 11 65 27 55
pur, bhagyapur, ragna,yakubnagar

You might also like