Bill of Quantities
Bill of Quantities
Unit Total
Unit Total
Price Price
Price Price
ItemNo Group ItemCode DescriptionofItem MeasurementUnit Quantity
In In
In Words In Words
figures Figures
(BDT) (BDT)
(BDT) (BDT)
1 of 2 7/12/20, 10:17 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...
ohm.Depth of bottom
of main electrode at
6858 mm. (22.5 ft)
from GL & length of
electrode 6096 mm.
(20 ft).
Construction of
Earthing inspection pit
inside measurement
600 mm x 600 mm
with 250 mm thick
brick in cement morter
(1:4) with 100mm thick
RCC top slab (1:2:4)
with 1%
Five Five
re-inforcement 450
Thousand Thousand
mm dia water sealed
Nine Nine
CI man-hole cover
Electrical Hundred Hundred
4 8.07.5 with locking each 1.000 5946.001 5946.001
Works and and
arrangement including
Forty-Six Forty-Six
necessary earth
point Zero point Zero
works, site filling and
Zero One Zero One
one brick flat soling 75
mm thick (1:3:6) base
concrete for making
inlet channel & 12mm
thick (1:2) cement
plaster with neat
finishing etc.all
complete up to a
depth of .75 meter.
One One
Hundred Hundred
Additional and and
5 N.S.I.04 Unforeseen Works LS 1.000 194.001 194.001
Item Ninety-Four Ninety-Four
point Zero point Zero
Zero One Zero One
Sixty-Eight
Thousand
Two
Grand Hundred
68226.024
Total: and
Twenty-Six
point Zero
Two Four
This Bill of Quantities is Electronically Signed by Ms. Abdul Hakim on behalf of M/s. Abdul Hakim