Bill of Quantities
Bill of Quantities
Unit Total
Item Unit Price Total Price
Price Price
Item Code Measurement
Group Description of Item Quantity
no. (if Unit In figures In Figures
In Words In Words
any) (BDT) (BDT)
(BDT) (BDT)
6 C/W N/A Palisading work by supplying bitumen drum sheet Ls 5.000 6000.001 Six 30000.005 Thirty
walling tied with 20 BWG G,I, wire fixing the same Thousand Thousand
https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4732570&userId=45947&nture=Works&tenId=877243&procMtd=… 1/12
3/30/24, 11:53 AM View Form
with already driven borrak bamboo posts with half point point
split borrak bamboo runners at 450mm c/c Zero Zero Zero Zero
horizontally with iron nails, G,I wire etc, all One Five
complete and accepted by the Engineer, (Rate is
excluding the cost of bamboo post),
One Lakh
Thirty-
Sand filling in foundation trenches and plinth with Eight
sand having F,M, 0,5 to 0,8 in 150mm layers Thousand
Five
including leveling, watering and compaction to Five
Hundred
achieve minimum dry density of 90% with optimum Hundred
8 C/W N/A Cum 277.090 500.001 point 138545.277
moisture content (Modified proctor test) by and
Zero Zero
ramming each layer up to finished level as per Forty-
One
design supplied by the design office only etc, all Five point
complete and accepted by the Engineer, Two
Seven
Seven
Five
Earth filling in foundation trenches and plinth in Thousand
150 mm layer with earth available within 90 m of One One
the building site to achive minimum dry density of Hundred Hundred
90percent with optimum moisture content and Fifty and
9 C/W N/A Cum 34.630 150.001 5194.535
(Modified proctor test) including carrying watering, point Ninety-
leveling, dressing and compacting to a specified Zero Zero Four
percentage each layer up to finished level etc, all One point Five
complete and accepted by the Engineer, Three
Five
Fourteen
Thousand
Supplying and laying of single layer polythene
Sixty Nine
sheet weighing one kilogram per 6,5 square meter
point Hundred
10 C/W N/A in floor or any where below cement concrete Sqm 249.850 60.001 14991.250
Zero Zero and
complete in all respect and accepted by the
One Ninety-
Engineer,
One point
Two Five
One Lakh
Forty-
One layer of brick flat soling in foundation or in Six Nine
floor with first class or picked jhama bricks Hundred Thousand
11 C/W N/A including preparation of bed and filling the Sqm 249.850 600.001 point 149910.250 Nine
interstices with local sand, leveling etc, complete Zero Zero Hundred
and accepted by the Engineer, One and Ten
point Two
Five
Twenty-
Mass concrete (1:3:6) in foundation or floor with
Nine
cement, sand (F,M, 1,2) and picked jhama chips
Thousand
including breaking chips, screening, mixing, laying, Seven
One
compacting to levels and curing for at least 7 days Thousand
Hundred
12 C/W N/A including the supply of water, electricity and other Cum 4.160 7000.001 point 29120.004
and
charges and costs of tools and plants etc, all Zero Zero
Twenty
complete and accepted by the Engineer, (Cement: One
point
CEM-II/A-M) Mass concrete in foundation (1:3:6)
Zero Zero
with cement, brick chips and sand of F,M, 1,2
Four
13 C/W N/A Reinforced cement concrete works with minimum Cum 17.950 12000.001 Twelve 215400.018 Two Lakh
cement content relates to mix ratio 1:1,5:3 having Thousand Fifteen
minimum f'cr = 30 MPa, satisfying a specified point Thousand
compressive strength f?c = 25 MPa at 28 days on Zero Zero Four
standard cylinders as per standard practice of One Hundred
Code ACI/BNBC/ASTM, Cement conforming to point
BDS EN-197-1 -CEM-I, 52,5N (52,5 MPa) / ASTM- Zero One
C 150 Type ? I, best quality Sylhet sand or coarse Eight
sand of equivalent F,M, 2,2 and 20 mm down well
graded stone chips conforming to ASTM C-33,
making and placing shutter in position and
maintaining true to plumb, making shutter water-
tight properly, placing reinforcement in position;
mixing with standard mixer machine with hopper,
fed by standard measuring boxes or mixing in
batching plant, casting in forms, compacting by
vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time
approved; including cost of water, electricity,
testing charges of materials and concrete
https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4732570&userId=45947&nture=Works&tenId=877243&procMtd=… 2/12
3/30/24, 11:53 AM View Form
cylinders as required, cost of all materials and
other charges etc, all complete, approved and
accepted by the Engineer-in- harge, (Rate is
excluding the cost of reinforcement and its
fabrication, placing, binding etc, and the cost of
shuttering & centering) a) Individual and
Combined footings,
https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4732570&userId=45947&nture=Works&tenId=877243&procMtd=… 3/12
3/30/24, 11:53 AM View Form
One Lakh
Centering and shuttering, including strutting, Fifteen
propping etc, (The formwork must be rigid enough Thousand
both in and out of plane, to make the concrete Five Two
surface true to the designed shape and size by Hundred Hundred
19 C/W N/A using necessary MS sheets of minimum 16 BWG, Sqm 230.550 500.001 point 115275.231 and
angles of minimum size 40 mm x 40 mm x 5 mm, Zero Zero Seventy-
flat bars etc,) and removal of form after hardening One Five point
of the concrete for: Floor and roof slab up to Two
Ground Floor, Three
One
One Lakh
Minimum 6 mm thick cement sand (F,M, 1,2)
Forty-
plaster (1:4) with fresh cement to ceiling, R,C,C,
Seven
columns, beams, surface of stair case, sunshades,
Three Thousand
cornices, railings, drop wall, louvers, fins and
Hundred Seven
finishing the corners and edges including washing
23 C/W N/A Sqm 492.650 300.001 point 147795.493 Hundred
of sand, cleaning the surface, curing at least for 7
Zero Zero and
days, cost of water, electricity, scaffolding and
One Ninety-
other charges etc, all complete in all respect as
Five point
per drawing and accepted by the Engineer-in-
Four Nine
charge, (Cement: CEM-II/B-M) Ground floor,
Three
24 C/W N/A Minimum 12 mm thick cement sand (F,M, 1,2) Sqm 42.300 300.001 Three 12690.042 Twelve
plaster with neat cement finishing to dado with Hundred Thousand
cement (1:4) up to 150 mm including washing of point Six
sand, finishing the edges and corners and curing Zero Zero Hundred
at least for 7 days, cost of water, electricity, One and
scaffolding and other charges etc, all complete in Ninety
all respect as per drawing and accepted by the point
https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4732570&userId=45947&nture=Works&tenId=877243&procMtd=… 4/12
3/30/24, 11:53 AM View Form
Engineer-in-charge, (Cement: CEM-II/B-M), Zero Four
Ground floor, Two
One Lakh
Thirty-
Minimum 12 mm thick cement sand (F,M, 1,2)
Five
plaster (1:6) having with fresh cement to both
Three Thousand
inner and outer surface of wall, finishing the edges
Hundred Nine
and corners including washing of sand, cleaning
and Fifty Hundred
25 C/W N/A the surface, curing at least for 7 days, cost of Sqm 388.320 350.001 135912.388
point and
water, electricity, scaffolding and other charges
Zero Zero Twelve
etc, all complete in all respect as per drawing and
One point
accepted by the Engineer-in-charge, (Cement:
Three
CEM-II/B-M), Ground floor,
Eight
Eight
Sixty-One
Supplying, fitting and fixing in Aluminium door Three
Thousand
frames, windows, partitions and curtain wall Thousand
Seven
distortion free glass of approved quality and shade Five
Hundred
28 C/W N/A including cost of fitting fixing all necessary Sqm 17.640 3500.001 Hundred 61740.018
and Forty
accessories etc, complete in all respect as per point
point
drawing and accepted by the Engineer-in-charge, Zero Zero
Zero One
Silver colour Window 1, i) Ground Floor, One
Eight
https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4732570&userId=45947&nture=Works&tenId=877243&procMtd=… 5/12
3/30/24, 11:53 AM View Form
35 C/W N/A Supplying, fitting and fixing of 100 mm inside Rm 45.780 800.001 Eight 36624.046 Thirty-Six
diameter & wall thickness 2,7 mm - 3,4 mm best Hundred Thousand
quality uPVC rain water down pipe fitting, fixed in point Six
https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4732570&userId=45947&nture=Works&tenId=877243&procMtd=… 6/12
3/30/24, 11:53 AM View Form
position with head and shoes, bends, min,20 mm Zero Zero Hundred
width F,I, Bar clamp and nails, and including all One and
accessories such as round grating/domed roof Twenty-
grating, bands, sockets approved and accepted by Four
the Engineer- in- charge, i) Ground Floor, Roof point
Zero Four
Six
Twenty-
Two
Eight Thousand
Hundred Nine
36 C/W N/A Drain Work Cum 28.700 800.001 point 22960.029 Hundred
Zero Zero and Sixty
One point
Zero Two
Nine
Eight Eight
Hundred Hundred
37 C/W N/A Dismantling work L/S 1.000 800.001 point 800.001 point
Zero Zero Zero Zero
One One
Eight Eight
Hundred Hundred
38 C/W N/A Building Name Plate L/S 1.000 800.001 point 800.001 point
Zero Zero Zero Zero
One One
Eight Eight
Hundred Hundred
39 C/W N/A Site Cleaning L/S 1.000 800.001 point 800.001 point
Zero Zero Zero Zero
One One
Eight Eight
Hundred Hundred
40 C/W N/A Unseen Work L/S 1.000 800.001 point 800.001 point
Zero Zero Zero Zero
One One
Thirty Thirty
Thousand Thousand
43 C/W N/A Temporary Labour Shed L/S 1.000 30000.001 point 30000.001 point
Zero Zero Zero Zero
One One
44 C/W N/A Earth work in excavation in all kinds of soil for Sqm 120.330 250.001 Two 30082.620 Thirty
foundation trenches including, layout, providing Hundred Thousand
center lines, local bench-mark pillars, leveling, and Fifty AND
ramming and preparing the base, fixing bamboo point Eighty-
spikes and marking layout with chalk powder, Zero Zero Two point
providing necessary tools and plants, protecting One Six Two
and maintaining the trench dry etc,, stacking,
cleaning the excavated earth at a safe distance
out of the area enclosed by the layout etc, all
complete and accepted by the Engineer, subject to
submit method statement of carrying out
excavation work to the Engineer for approval,
However, Engineer?s approval shall not relieve
https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4732570&userId=45947&nture=Works&tenId=877243&procMtd=… 7/12
3/30/24, 11:53 AM View Form
the contractor of his responsibilities and
obligations under the contract, Layout and marking
for earthwork in excavation in foundation accepted
by the Engineer-in-charge, [Plinth area of the
structure shall be considered for measurement]
Seven
Sand filling in foundation trenches and plinth with
Thousand
sand having F,M, 0,5 to 0,8 in 150mm layers
Five Five
including leveling, watering and compaction to
Hundred Hundred
achieve minimum dry density of 90 with optimum
47 C/W N/A Cum 15.040 500.001 point 7520.015 and
moisture content (Modified proctor test) by
Zero Zero Twenty
ramming each layer up to finished level as per
One point
design supplied by the design office only etc, all
Zero One
complete and accepted by the Engineer,
Five
Seven
Thousand
Supplying and laying of single layer polythene
Sixty Two
sheet weighing one kilogram per 6,5 square meter
point Hundred
49 C/W N/A in floor or any where below cement concrete Sqm 120.330 60.001 7219.920
Zero Zero and
complete in all respect and accepted by the
One Nineteen
Engineer,
point
Nine Two
52 C/W N/A Providing expansion joints across the R,C,C, road Sqm 13.990 1200.001 One 16788.014 Sixteen
pavement with 20 mm gap between the adjacent Thousand Thousand
panels, Supplying dowel bars of size 12 mm dia Two Seven
and 600 mm long M,S rod placed 750 mm c/c, 300 Hundred Hundred
mm of the bar being fixed within one slab keeping point and
https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4732570&userId=45947&nture=Works&tenId=877243&procMtd=… 8/12
3/30/24, 11:53 AM View Form
remaining portion the bar free within the adjacent Zero Zero Eighty-
slab being inserted in 20 mm dia and 300 mm long One Eight
P,V,C, pipe embedded in the slab, inside of pipe point
fully greased, filling the gap between the slabs Zero One
(with admixture) of hot bitumen and coarse sand Four
(F,M, 2,2) in proportion of 2:1, finishing the top with
bitumen, spreading coarse sand over the joint, all
complete as per plan, drawing and accepted by
the Engineer-in-charge,
55 E/W N/A CONCEALED CONDUIT POINT WIRING ( BYA) Point 29.000 1100.001 One 31900.029 Thirty-
(WITHOUT SWITCH) Concealed conduit wiring for Thousand One
following point looping at the switch board with One Thousand
earth terminal with IC - 2x1,5 sqmm PVC insuated Hundred Nine
cable ( BYA ) & IC - 2x1,5 sqmm PVC insulated point Hundred
FCC ( BYA ) Green Yellow bi - colour including Zero Zero point
circuit wiring ( From SDB to Switchboard ) with IC - One Zero Two
2x2,5 sqmm PVC insulated cable ( BYA ) & IC - Nine
225 sqmm PVC insulated ECC ( BYA ) ( Green
Yellow bi - colour ) through PVC conduit tone
conduit from switch board to common point on
ceiling is considered to draw 3 pair of cable ) of
reputed manufacturer of minimum 25 mm dia &
1,7 mm wall copper, thickness complete with 18
SWG GP sheet / PVC switch board pull box with
3mm thick ebonite sheet cover , fixing materials
etc ( without switch ) as required including
mending the damages good , All electrical
contacts shall be of brass connected through
connector or soldering ( no twisting shall be
allowed ) and cables shall be manufactured and
tested according to IEC BS VDE standard along
with relevant BDS standard as per detailed
specification mentioned in Annexure - 1 , The work
shall be carried out as per direction & approval of
the Engineer In Charge, Cable manufacturer (s)
must have valid type test certificate (within last
seves years) from internationally accredited
https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4732570&userId=45947&nture=Works&tenId=877243&procMtd=… 9/12
3/30/24, 11:53 AM View Form
laboratory (like CPRI, KEMA des accepted /
approved by the Engineer In Charge, Light /
exhaust or wall bracket fan point, Fan point
Five Two
GANG TYPE FAN REGULATOR Assembled and Hundred Thousand
59 E/W N/A made in Each 4.000 500.001 point 2000.004 point
BANGLADESH/CHINA/INDIA/TURKEY/VIETNAM Zero Zero Zero Zero
One Four
61 E/W N/A Supplying, fitting and fixing of the 250 V, A,C, Each 4.000 4000.001 Four 16000.004 Sixteen
capacitor type ceiling fan, with regulator and other Thousand Thousand
https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4732570&userId=45947&nture=Works&tenId=877243&procMtd=… 10/12
3/30/24, 11:53 AM View Form
accessories etc, (1400 mm sweep capacitor type : point point
Millet/G,E,C,/Singer or equivalent,) & all complete Zero Zero Zero Zero
as per direction of the Engineer in charge: One Four
Twenty-
Twelve
Four
Thousand
Thousand
67 E/W N/A Lightning Arrester Set 2.000 12000.001 point 24000.002
point
Zero Zero
Zero Zero
One
Two
https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=4732570&userId=45947&nture=Works&tenId=877243&procMtd=… 11/12
3/30/24, 11:53 AM View Form
Seventy-
Two Lakh
Forty-
Five
Thousand
Grand
7245442.118 Four
Total:
Hundred
and
Forty-Two
point One
One Eight
This Bill of Quantities is Electronically Signed by Mr. Md. Alam on behalf of M/S. Prianka Enterprise