Lot Detail

Lot No. : OMB-LTM-02


Lot Strengthening of shoulder of bank protection work of Teesta Right Embankment from km.30.600 to km.
31.00 =400.00 m at Chila Khal in Upazila: Gangachara Dist. Rangpur under Rangpur O&M Division,
Description : BWDB, Rangpur during the year 2023-2024.

Priced Bill of Quantities (BOQ)

Unit Rate Basis

Table
Estimate by the Procuring Entity
Name :

Unit Unit
rates
rates or
Item or Amount Amount I
prices
Item Group Code Description of Items of Works Unit Quantity prices (in (in have
No. (If (specifications preferably built-in) (in figure) words) seen
any) (in (BDT) (BDT)
figures)
words)
(BDT)
(BDT)
1 BWDB 16- Erection of bamboo profile with full Each 5.00 378.109 Thre 1890.545 One --- Select ---
100 bamboo posts and pegs not less than e Thous
60mm in diameter and coir strings Hund and
etc. complete as per directionof red Eight
Engineer in charge. and Hundr
2 BWDB 16- Earth work by Carried Earth (by cum 825.148 517.049 Seve
Five ed
Four
nty- 426641.948
and --- Select ---
210- truck/boat or any other means) Hund Lakh
10 supplied at contractor's own cost Eight
red Ninety
Twent
(including royalty) in resectioning of point
and point
y-Six
embankment/ canal bank/ river One
Seve Five
Thous
slopes/ road/ compound etc. Zero
nteen Four
and
manually compacted by 7.0 kg iron Nine
point Five
Six
rammer to avoid any air pocket with Zero Hundr
clayey soil (minimum 30% clay, 0- Four ed
40% silt, 0-30% sand) beyond the Nine and
initial lead of 300m and all lifts Forty-
including throwing the spoils to profile One
in layers not exceeding 150mm point
thickness with clod breaking to a Nine
maximum size of 100mm, removing Four
roots & stumps of trees of girth upto Eight
200mm from the ground, benching
the side slopes, stripping/ ploughing
the base of embankment and
borrowpit areas, dug bailing, bail out
of water, rough dressing including
150mm cambering at the centre of
the crest (where necessary) etc.
complete as per direction of Engineer
in charge. 300 m to 1.00 km.
3 BWDB 40- Labour charge for salvaging of cum 93.696 974.079 Nine 91267.306Ninety --- Select ---
560 cement concrete/sand cement/brick Hund -One
blocks of different sizes including red Thous
carriage within the site of any and and
protective work with all leads and lifts Seve Two
and stacking in measurable stacks as nty- Hundr
per direction of Engineer in charge. Four ed
4 BWDB 40- Labour charge for protective works in cum 93.969 point
1470.529 One and
One
Zero 138184.140
Sixty- --- Select ---
270- laying CC blocks of different sizes Thou Lakh
10 including preparation of base, atering Seve
sand Seven
Thirty-
and ramming of base etc. complete nFour point
Eight
as per direction of Engineer in Nine
Hund Three
Thous
Zero
charge. Within 200 m.
5 BWDB 48- Fine dressing and close turfing of the sqm 1494.15 36.811 Thirt 55001.156Fifty- --- Select ---
100 slopes and the crest of embankment y-Six Five
with 75mm thick, good quality durba point Thous
or charkanta sods of size 200mm x Eight and
200mm, with all leads and lifts, One AND
including ramming, watering until the One One
turf grows properly, maintaining point
etc.complete (measurement will be One
given on well grown grass only). as Five
per direction of Engineer in charge. Six
Grand 712985.095
Total :

Tenderer's Quoted Price

Table
Tenderer?s Quoted Price
Name :
Tenderer shall only quote the offer in percentage within the range of ±5% to the total estimated cost of the
proposed work prepared by the PE.

Total Estimated Cost Offered Amount Offered Amount


(BDT) Percentage (-5% to +5%) (in figures) (in words)
(BDT) (BDT)
712583.640

Grand Total :