You are on page 1of 15

Lot Detail

Lot No. : IPCP/KHUL/KOYRA/C/23-24/25.03


Lot 1. (a) Improvement of Surar Khal to Koyra Sadar Khal ( Surar Khal) from Ch. 00-2024.00m Under Upazila:
Koyra, Dist: Khulna. (b) Construction of reference Bed Block and TBM at Surar Khal to Koyra Sadar Khal (
Description : Surar Khal) Under Upazila: Koyra, Dist: Khulna.

Part-1

Unit Rate Basis

Table
Estimate by the Procuring Entity
Name :
Unit
Unit rates rates
Item Description of Items of or prices or Amount Amount I
Item Group Code (If Works Unit Quantity prices (in (in have
No. any) (specifications preferably (in figure) words) seen
built-in) figures) (in (BDT) (BDT)
(BDT) words)
(BDT)
1 Earth Works 2.04.1.1 EWEx(Rd/C/P): Earthwork cum 10146.990 236.000 Two Twent
2394689.640 --- Select ---
in Road in excavation of Hund y-
Embankment roadway/canal/pond etc of red Three
any dimension in all kinds of and Lakh
soil including cutting up to Thirt Ninety
required depth including y-Six -Four
bailing out water and Thous
throwing on the and
embankment, breaking Six
clods, ramming and leveling, Hundr
dressing in 225 mm layer ed
with maintaining the side and
slopes and level of both Eighty
pond and the embankment -Nine
as per design and accepted point
by the Engineer-in- Six
charge.[PWD 02.18] For Four
initial lead of 30 m and lift of
1.5 m
2 Additional 6.01.19a EWEx(M)Earthwork cum 23676.310 124.640 One Twent
2951015.278 --- Select ---
Item Excavation by Mechanical Hund y-Nine
hydraulic Excavator (Long red Lakh
Boon)/Dredger in and Fifty-
roadway/canals/beels/ponds Twen One
etc. with 0.90 cum bucket ty- Thous
capacity, including cutting Four and
and loading in tippers or point AND
disposing of all excavated Six Fiftee
materials at a safe distance Four n
designated by the E-I-C, point
trimming bottom and side Two
slopes, in accordance with Seven
requirements of lines, Eight
grades and cross sections,
leveling, dressing, etc. all
complete for an initial
excavation depth of 3m and
lead up to 20m, including
cost of hire charges of
Excavator/dredger and all
other machines, equipment,
fuels, lubricants and wages
of operational staff etc. all
complete as per direction of
the E-I-C.
3 Earth Works 2.05.1 Leveling and dressing the sqm 10120.000 14.110 Fourt 142793.200One --- Select ---
in Road embankment crown, road een Lakh
Embankment flanks, etc. in maintenance point Forty-
work by earth cutting and One Two
filling as necessary with One Thous
maintaining proper slope and
and camber including Seven
compaction etc. all complete Hundr
as per direction of the E-I- ed
C. and
4 Earth Works 2.02.1.1 EFW: Earth work in road cum 277.500 183.000 One Ninety
50782.500-Fifty --- Select ---
in Road embankment up to a lift of Hund Thous
Embankment 1.5 m in all kinds of soil red Three
and
including cutting and and point
Seven
throwing earth in layers not Eight Two
Hundr
exceeding 150 mm in y- ed
thickness, breaking clods up Thre and
to 40 mm size in each layer, e Eighty
ramming, leveling and -Two
dressing as per required point
side slope and alignment Five
with earth borrowed from
the road side govt. acquired
land for any leads and
maintaining the embankment
true to level and side slopes
as per profiles for one year
from the date of completion
including making dug,
bailing, profiling etc.
complete and accepted by
the Engineer-in-charge.
[PWD 24.1] For initial lift of
1.5 m
5 Additional 2.06.1a Creating turf on the side sqm 10120.000 29.140 Twen Two
294896.800 --- Select ---
Item slopes and top of ty- Lakh
embankment with good Nine Ninety
quality turf not less than 225 point -Four
mm square chunk, watering One Thous
till the grass grown including Four and
all leads and lifts etc. Eight
complete and accepted by Hundr
the Engineer-in-charge. ed
[PWD 24.3] and
6 Additional 5.02.02a Bailing out of trapped water hour 200.000 458.000 Four Ninety
Ninety
91600.000-Six --- Select ---
Item caused by inundation or Hund -One
rain, by pump from red point
Thous
foundation trenches. [PWD and Eight
and
02.2] Fifty- Six
7 Earth Works 2.01.1 C&G (Clearing and sqm 1100.000 40.010 Eight
Forty Hundr
Forty-
44011.000ed --- Select ---
in Road Grubbing): The work point Four
Embankment consists of cutting, removing Zero Thous
and disposing of all One and
materials such as trees, AND
bushes, shrubs, stumps, Eleve
roots, grass, weeds, n
rubbish, and removal of
topsoil and other organic
material etc. all complete as
per direction of Engineer in
Charge.
8 General, 1.10.01 Videography: Providing and day 2.000 1693.300 One 3386.600 Three --- Select ---
Site carrying out video shoting of Thou Thous
Facilities and roads, bridges, buildings, sand and
Safety other programmes by Six Three
professional videographer
including hiring of vehicle,
equipment for video
shooting, titling, lightening,
mixing, lettering, editing
including cost of two DVDs
of approved makes and
quality etc. all complete as
per direction of E-I-C. The
edition of the video film and
the script for narration shall
be as approved by the
engineer. Within 50
kilometer from district head
quarter for full day
9 Additional 5.26.12a Earth work in excavation to each 400.000 164.000 One 65600.000Sixty- --- Select ---
Item make a pit of 600 x 600 x Hund Five
450 mm (depth) for red Thous
plantation, applying cow and and
dung mixing with loamy silty Sixty Six
soil and excavated earth, -Four Hundr
planting the plants, tightened ed
with 1800 mm long borrak
bamboo post with jute rope
and filled up the hole with
mixed soil including supply
of tools and plants all
complete and accepted by
the Engineer-in-charge.
[PWD 25.12]
10 General, 1.02 Project Profile Signboard: sqm 2.000 16755.530 Sixte 33511.060Thirty- --- Select ---
Site Providing and fixing of en Three
Facilities and typical project profile Thou Thous
Safety signboard as per direction sand and
of E-I-C, to be placed at a Seve Five
suitable place of the site n Hundr
including submission of Hund ed
proposals for the materials red and
& size of the signboards and Eleve
(recommended size: Fifty- n
1800mm x 1200 mm with 2 Five point
nos. 75mm dia. MS post, point Zero
outer & inner frames of Five Six
board shall be 50mm x Thre
50mm x 5mm & 25mm x e
25mm x 5 mm respectively )
and text layout to the
engineer for approval which
will be positioned as
directed by the engineer and
removing the same on
completeion of the works or
as instructed by the E-I-C.
Sheeting will be made of
encapsulated lens with
retro-reflective type and
messages/ borders will be
screen printed. The text
shall mention among others
the name of the project,
name of the implementing
agency, cost of the project,
completion time, name of
the contractor etc.
Grand 6072286.078
Total :
Tenderer's Quoted Price

Table
Tenderer?s Quoted Price
Name :
Tenderer shall only quote the offer in percentage within the range of ±5% to the total estimated
cost of the proposed work prepared by the PE.
Total Estimated Offered Amount Offered Amount
Percentage (-5% to
Cost (in figures) (in words)
+5%)
(BDT) (BDT) (BDT)
6174861.000

Grand Total :

Part-2

Unit Rate Basis

Table
Estimate by the Procuring Entity
Name :
Unit
Description of Unit rates rates
Items of Works or prices or Amount Amount I
Item Group Item Code (If (specifications Unit Quantity prices (in (in have
No. any) preferably (in figure) words) seen
built-in) figures) (in (BDT) (BDT)
(BDT) words)
(BDT)
1 Additional 5.02.01.2a Earth work in cum 10.470 153.000 One 1601.910 One --- Select ---
Item excavation in all Hund Thous
kinds of soil for red and
foundation and Six
trenches Fifty- Hundr
including layout, Thre ed
providing center e and
lines, local One
bench mark point
lillars, levelling, Nine
ramming and One
preparing the
base, fixing
bambo spikes
and marking
layout with chalk
powder,
providing
necessary tools
and plants,
protecting and
maintaing the
trench dry etc.
stacking,
ceaning the
excavted earth
at a safe
distance out of
the area
enclosed by the
layout etc. all
cmoplete and
accepted by the
engineer-in-
charge.
Subjectto submit
method
statement of
carrying out
excavation work
to the engineer-
in-charge for
approval.
However,
engineer's
approval shall
not relieve the
contractor of his
responsibilities
and obligations
under the
contract. [PWD
02.1] Earthwork
in excavation in
foundation
trenches up to
1.5m depth and
maxmium 10m
lead (PWD
02.1.2]
2 Additional 3.07.1a PS: Supplying sqm 25.000 46.070 Forty 1151.750 One --- Select ---
Item and laying of -Six Thous
single layer point and
polythene sheet Zero One
weighing one Seve Hundr
kilogram per 6.5 n ed
square meter in and
floor or any Fifty-
where below One
cement concrete point
complete in all Seven
respect and Five
accepted by
Engineer-in-
charge. [PWD
03.7]
3 Additional 4.06.04a PCC-17: Plain cum 0.070 11101.300 Elev 777.091 Seven --- Select ---
Item cement concrete en Hundr
work in Thou ed
foundation with sand and
minimum One Seven
compressive Hund ty-
strength of 17 red Seven
MPa at 28 days and point
(sugessted mix One Zero
proportion 1:2:4 point Nine
& maximum w/c Thre One
ratio 0.45) on e
standard
cylinder as per
standard
practice of
Code AASHTO/
ASTM/ and
cement
conforming to
BDS EN 197-1 :
2003 CEM-II/A-
L/M/V/W
42.5N, sand of
minimum FM
1.8 and 20mm
down well
graded 1st
class/ picked
brick chips (LAA
value not
exceeding 40)
comforming to
ASTM C 33
including
breaking bricks
into chips,
shuttering,
mixing by
concrete mixer
machine,
casting, laying
compacting and
curing for the
requisite period
etc. all complete
as per direction
of the E-I-C.
Additional
quantity of
cement to be
added if
required to
attain the
strength at the
contractor's own
cost.
4 Additional 5.04.03a Brick works with cum 0.280 9657.000 Nine 2703.960 Two --- Select ---
Item first class bricks Thou Thous
with cement sand and
sand (F.M. 1.2) Six Seven
mortar (1:4) in Hund Hundr
exterior walls red ed
including filling and and
the interstices Fifty- Three
with mortar, Seve point
raking out joints, n Nine
cleaning and Six
socking the
bricks at least
for 24 hours
before use and
washing of
sand, necessary
scaffolding,
curing at least
for 7 days etc.
all complete
including cost of
water, electricity
and other
charges
(measurement
to given as 250
mm width for
one brick length
and 375 mm for
one brick and a
half brick length)
accepted by the
Engineer-in-
charge.
(Cement: CEM-
II/B-M) In
ground floor
(PWD 04.3)
5 Additional 4.07.21.01.01a RCC-30SCCM: m 40.000 409.020 Four 16360.800Sixtee --- Select ---
Item Reinforced Hund n
cement concrete red Thous
work for pre- and and
cast driven Nine Three
micro pile with point Hundr
minimum cement Zero ed
content and Two and
maximum water Sixty
cement ratio as point
specified by Eight
laboratory
having minimum
required
average
compressive
strength, f'cr =
38.5 MPa and
satisfying a
specified
compressive
strength, f'c =
30 MPa at 28
days on
standard
cylinders as per
standard
practice of code
AASHTO/
ASTM and
cement
conforming to
BDS EN 197-1 :
2003 CEM-I
52.5N/ ASTM
C150 Type-1,
water reducing
admixture of
complying type
A under ASTM
C 494 (Doses
of admixture to
be fixed by the
mix design),
sand of
minimum FM
2.5 and 20mm
down well
graded crushed
stone chips
broken from
boulders
(Preferably
stone chips from
Madhyapara,
Dinajpur, LAA
value not
exceeding 30)
conforming to
ASTM C 33,
mixing in
standard mixture
machine with
hoper and fed
by standard
measuring
boxes, including
all related works
like breaking
stone boulders
into chips,
screening
through proper
sieves, cleaning
and washing,
centering and
shuttering with
MS sheet, MS
angle, nuts and
bolts,
chamfering
edges,
preparation of
casting beds,
laying polythene,
placing
reinforcement
cages in
position, casting
in steel forms,
compacting by
vibrators and
tapered rods as
where
necessary ,
curing for 28
days, driving the
pile upto the
design depth as
per standard
practice or
specified
method,
providing all
equipment,
labour, materials
including
carrying etc. all
complete as per
design, drawing
and direction of
the E-I-C. The
cost of
reinforcement
and it's
fabrication,
binding, welding
and placing is
not included but
the cost of
admixture is
included in this
unit rate.
Additional
quantity of
cement to be
added if
required to
attain the
specified
strength to be
provided by the
contractor at his
own cost. The
Mix Design shall
have to be
approved by the
concerned
District Quality
Control
Laboratory or
any other
reputed
laboratory
approved by the
competent
authority before
execution of the
work. Note:
Using Concrete
Mixer X-section
of pre-cast pile:
150mm x
150mm Cost of
reinforced
cement concrete
6 Additional 4.07.21.01.02a RCC-30SCCM: m 40.000 226.260 Two 9050.400 Nine --- Select ---
Item Reinforced Hund Thous
cement concrete red and
work for pre- and AND
cast driven Twen Fifty
micro pile with ty- point
minimum cement Six Four
content and point
maximum water Two
cement ratio as Six
specified by
laboratory
having minimum
required
average
compressive
strength, f'cr =
38.5 MPa and
satisfying a
specified
compressive
strength, f'c =
30 MPa at 28
days on
standard
cylinders as per
standard
practice of code
AASHTO/
ASTM and
cement
conforming to
BDS EN 197-1 :
2003 CEM-I
52.5N/ ASTM
C150 Type-1,
water reducing
admixture of
complying type
A under ASTM
C 494 (Doses
of admixture to
be fixed by the
mix design),
sand of
minimum FM
2.5 and 20mm
down well
graded crushed
stone chips
broken from
boulders
(Preferably
stone chips from
Madhyapara,
Dinajpur, LAA
value not
exceeding 30)
conforming to
ASTM C 33,
mixing in
standard mixture
machine with
hoper and fed
by standard
measuring
boxes, including
all related works
like breaking
stone boulders
into chips,
screening
through proper
sieves, cleaning
and washing,
centering and
shuttering with
MS sheet, MS
angle, nuts and
bolts,
chamfering
edges,
preparation of
casting beds,
laying polythene,
placing
reinforcement
cages in
position, casting
in steel forms,
compacting by
vibrators and
tapered rods as
where
necessary ,
curing for 28
days, driving the
pile upto the
design depth as
per standard
practice or
specified
method,
providing all
equipment,
labour, materials
including
carrying etc. all
complete as per
design, drawing
and direction of
the E-I-C. The
cost of
reinforcement
and it's
fabrication,
binding, welding
and placing is
not included but
the cost of
admixture is
included in this
unit rate.
Additional
quantity of
cement to be
added if
required to
attain the
specified
strength to be
provided by the
contractor at his
own cost. The
Mix Design shall
have to be
approved by the
concerned
District Quality
Control
Laboratory or
any other
reputed
laboratory
approved by the
competent
authority before
execution of the
work. Note:
Using Concrete
Mixer X-section
of pre-cast pile:
150mm x
150mm Cost of
driving up to
8.00m
7 Additional 5.12.03a Minimum 12mm sqm 6.300 359.000 Thre 2261.700 Two --- Select ---
Item thick cement e Thous
sand (F.M. 1.2) Hund and
plaster with neat red Two
cement finishing and Hundr
to plinth wall Fifty- ed
with cement Nine and
(1:4) upto Sixty-
150mm below One
ground level point
including Seven
washing of
sand, finishing
the edges and
corners abd
curing at least
for 7 days, cost
of water,
electricity,
scaffolding and
other charges
etc. all complete
in all respect as
per drawing and
accepted by the
Engineer-in-
charge.
(Cement: CEM-
11/B-M) ground
flor. [PWD 15.2]
8 Additional 6.03.08a Painting of sqm 0.900 111.970 One 100.773 One --- Select ---
Item gauge on the Hund Hundr
body of red ed
structure with and point
synthetic enamel Elev Seven
paint etc. all en Seven
complete as per point Three
specification & Nine
direction of E-I- Seve
C. n
9 Additional 6.04.01.01a RCC-20SCCM: cum 2.000 14735.830 Fourt 29471.660Twent --- Select ---
Item Reinforced een y-Nine
cement concrete Thou Thous
work with sand and
minimum cement Seve Four
content relates n Hundr
to nominal mix Hund ed
ratio 1:2:4 and red and
maximum water and Seven
cement ratio 0.4 Thirt ty-
having minimum y- One
required Five point
average point Six
strength, f'cr = Eight Six
28.5 Mpa and Thre
satisfying a e
compressive
strength f'c = 20
Mpa at 28 days
on standard
cylinders as per
standard
practice of
Code AASHTO/
ASTM and
cement
conforming to
BDS EN 197-1 :
2003 CEM-II/A-
L/M/V/W
42.5N, high
range water
reducing
admixture of
complying type
A or F under
ASTM C 494
(Doses of
admixture to be
fixed by the mix
design), sand of
minimum FM
2.2 and 20mm
down well
graded crushed
stone chips
broken from
boulders
(Preferably
stone chips from
Madhyapara,
Dinajpur, LAA
value not
exceeding 30)
conforming to
ASTM C33
including
screening chips
through proper
sieves, cleaning,
placing shutter
in position,
making shutter
water-tight
properly, placing
reinforcement in
position, mixing
in standard
mixture machine
with hoper, fed
by standard
measuring
boxes,
maintaining
allowable slump
of 75mm to
100mm, casting
in forms,
compacting by
mechanical
vibrator
machine, curing
for 28 days,
removing
centering-
shuttering after
approved
specified time
period, other
incidental
charges, etc. all
complete as per
drawing,
specification &
direction of the
E-I-C. The cost
of reinforcement
and it's
fabrication,
welding,
coupling,
placing, binding
etc. is not
included but the
cost of
admixture is
included in this
unit rate.
Additional
quantity of
cement to be
added if
required to
attain the
strength at the
contractor's own
cost. Note:
Using Concrete
Mixer For
bottom and
approach slab
of box culvert,
regulator/ pipe
sluice/ Rubber
Dam/ WRS of
any height
(Retail).
10 Additional 5.06.01.02aa Supplying, kg 325.790 120.000 One 39094.800Thirty- --- Select ---
Item fabrication and Hund Nine
fixing to detail red Thous
as per design : and and
ribbed or Twen AND
deformed bar ty Ninety
reinforcement -Four
(excluding point
laboratory test Eight
fees) for
Reinforced
concrete,
produced and
marked in
accordance with
BDS ISO 6935-
2:2016 (or
standard
subsequently
released from
BSTI) including
straightening
and cleaning
rust, if any,
bending and
binding in
position with
supply of G.I.
wires,conducting
necessary
laboratory tests
etc. (excluding
splices or laps)
complete in all
respect and
accepted by the
Engineer-in-
charge
(Measurement
shall be
recorded only
on standard
mass per unit
length of bars,
while dia of bars
exceeds its
standard) .
(PWD 08.1)
Grade 400
(B400DWR /
B420DWR:
complying BDS
ISO 6935-
2:2016 / ASTM
A615) ribbed or
deformed bar
produced and
marked
according to
Bangladesh
standard, with
minimum yield
strength, fy
(ReH)= 400
MPa but fy not
exceeding 480
MPa and
whatever is the
actual yield
strength within
allowable limit
as per BNBC/
ACI 318, the
ratio of ultimate
tensile strength
fu to yield
strength fy, shall
be at least 1.25
and minimum
elongation after
fracture and
minimum total
elongation at
maximum force
is 17% and 8%
respectively : up
to ground floor. .
(PWD 08.1.2)
Grand 102574.844
Total :

You might also like