You are on page 1of 25

BATCH # 01 (Supply of RO Plant CIVIL WORK Material)

Unit Price Total Price


Sr Quantity Total
Description / Specification Unit (Inclusive of all (Inclusive of all
# Per site Quantity
applied taxes) applied taxes)

Cement.
1 Bag 2,200
-OPC 50 Kg having 28 Days strength up to 7500 -8000 Psi 275

Hill Sand
2 CFT 7,600
-Hill Sand free from Dust 950

Crush
3 CFT 8,800
-Crush 1/2” free from dust and lime angular Size 1,100

Bricks
4 Nos 112,000
-1st class Burnt Bricks (9"4.5"3") 14,000

Roof Bricks
5 -Roof Tiles (12"X6"X1'') rectangular in shape sharp corners smooth in Nos 5,360
670
size.

Shingle/Stone Blast
6 CFT 2,000
-Stone Blast size 2'' free from pebbles 250

Steel bar
7 KG 2,560
-Steel 1/2" Amerli /Mughal Steel or equivalent 320

Binding Wire for Shuttering


8 KG 64
-Binding Wire 8

Steel Girder (Room Size 20X12 Internal size) so it is required in short


9 Nos 40
Span of 12 feet (13.5 covering wall Thickness of 9'') 5
BATCH # 01 (Supply of RO Plant CIVIL WORK Material)
Unit Price Total Price
Sr Quantity Total
Description / Specification Unit (Inclusive of all (Inclusive of all
# Per site Quantity
applied taxes) applied taxes)
-Steel Girder 13.5 ft long 6''X2.5-3'' No. 4500 (weight min. 3 KG per feet)
with red coat oxide at the time of construction: after construction there
should be sky blue color

Steel T-Iron Room Size (20X12) So it is required in long span as of 20ft it


will covers 6 inch of wall.
10 -Steel T-Iron 22 ft long length per T-iron (size 2" x 1.25") (weight min. Nos 88
11
1000 Grams per feet) with red coat oxide at the time of construction:
after construction there should be sky blue color

Steel T-Iron for Water Point


11 -Steel T-Iron 6 ft long length per T-iron (size 2" x 1.25") (weight min. Nos 88
11
1000 Grams per feet) with red coat oxide

Iron Door

Iron Door: (6t x 6 ft) with frame, frame angle iron size 1.25"x1.25” gauge
2mm. Door Angle iron size 1."x1" gauge 2mm, Iron sheet gauge 20,
12 Bended/ Zigzag Iron sheet, Horns size 6 inch 3 horns each side (top, Nos 8
1
center, & bottom) , 2 Handles inside , 3 hinges of 4" size on each side. 2
Bolt Inside and 1 lock outside. Double opening, with red oxide and double
coated Spray paint Blue Color, or by direction of Engineer

Iron Window

-Iron Window: (4ft x 4 ft) with frame, frame angle iron size 1.25"x1.25”
gauge 2mm, Window Angle Iron size 1." x 1." Gauge 2mm, Iron sheet
13 gauge 20, 2 Cross Patti 1" thick,1.5 mm thick in each panel, Horns size 6 Nos 16
2
inch,3 horns each side (top, center, & bottom), 2 hinges of 4" size on
each side, 2 bolt inside, 2 Handles inside, Double opening, with red oxide
and double coated paint Blue Color or as per Direction of Engineer
BATCH # 01 (Supply of RO Plant CIVIL WORK Material)
Unit Price Total Price
Sr Quantity Total
Description / Specification Unit (Inclusive of all (Inclusive of all
# Per site Quantity
applied taxes) applied taxes)

Stainless steel Pipe 3" dia


14 -Best quality, to be installed as per site requirements including bending RFT 160
20
etc.

Steel Taps
15 Nos 40
-Best quality water taps By Company of Super Asia, Abid or equivalent 5

PVC Pipe 3" dia


16 RFT 1,600
-Best quality (Pak Arab/Jeddah or equivalent) 200

PVC Elbow 3" dia


17 Nos 40
-Best quality (Pak Arab/Jeddah or equivalent) 5

PVC Tee 3" dia


18 Nos 40
-Best quality (Pak Arab/Jeddah or equivalent) 5

Iron Gate Grill Gate for Fencing 5X5 feet


19 Nos 8
-Iron Gate Grill Gate for Fencing 5X5 feet 1

Iron Angle

-Iron L-Angle for fixing barbed wire in angle (2''X2''X (2/8'' Thickness)) 1.5
20 feet in CC bed and 6 feet above G. level Total 7.5 feet and bend one feet Nos 560
70
upper portion towards inside, iron Angle Should be coated by sky blue
color or as directed by engineer

Mesh Fence including waste water pond and RO boundary wall (60X60
21 RFT 2,560
RO Boundary) (20X20 Waste water Pond) 320
BATCH # 01 (Supply of RO Plant CIVIL WORK Material)
Unit Price Total Price
Sr Quantity Total
Description / Specification Unit (Inclusive of all (Inclusive of all
# Per site Quantity
applied taxes) applied taxes)
-Mesh fence GI Mesh with height of 5 feet, bended mesh hole size of
70X70mm (3''X3'') it should be controlled by tensile force and no loosing
between posts/Angles, mesh wire dia 3.5 mm to 4.5 mm

Sign board

-Sign Boards with installation (outer G.I pipe 2" dia outside, written
portion G.I sheet 4’ height x 4.5 ' width x 2 mm gauge), written sheet
should be fixed with outer G.I pipe 2" dia pipe at three places in each
22 side with 2" width x 6" length and 4 mm gauge. Total Height of Sign Nos 8
1
Board will be 7 feet two feet below ground and 5 feet above Ground
Level. (Installed with 1:2:4 PCC 1.5' from ground level) painting text on
Both sides, outer GI pipe should be coated with Sky blue color or as per
direction of Engineer

Water Tanker
23 Nos 32
-Water for Construction Of RO Room And Waste water pond 4

Colour oil paint

24 -One coat of premier and two coat of Oil Paint color should be sky blue liters 480
or as per direction of Engineer, Oil Paint by Company of Master/Corona 60
or Equivalent

Grand Total Inclusive of all applicable taxes & Transportation

BIDDER’S COMMENTS/REMARKS:
1. _______
2.
3.
4.
BATCH # 02 (Supply of RO Plants Electrical & Mechanical Material)
Unit Price Total Price
Sr Quantity Total
Description / Specification Unit (Inclusive of all (Inclusive of all
# Per site Quantity
applied taxes) applied taxes)

Membrane 8"/40' (Filmtec / Torray)


-The Membrane should be able to reverse water quality 10000 TDS level

1 Membrane 8"/40' (Filmtec / Torray) Nos


The Membrane should be able to reverse water quality 10000 TDS level, 3 375
The Membrane should be design on each site with each Quantity of
Water,

Membrane Pressure Vessel 600 psi (Imported 3in1)


-Membrane should be able to reverse water quality 12000 TDS level
2 Nos
-Membrane Pressure Vessel 600 psi (Imported 3in1) 1 125
-Membrane should be able to reverse water quality 12000 TDS level

Raw Water Tank 5000 LTR with Stand

3 -( Food Grade) Raw Water Tank 5000 LTR with Stand (Stand Should be Nos 125
with Red Oxide after installation it should be paint by Sky Blue or as per 1
direction of Engineer

Product Tank 5000 Litters with Stand

4 -( Food Grade) Product Water Tank 5000 LTR with Stand (Stand Should Nos
be with Red Oxide after installation it should be paint by Sky Blue or as 1 125
per direction of Engineer

5 Plant Skid STAINLESS STEEL Nos


1 125
BATCH # 02 (Supply of RO Plants Electrical & Mechanical Material)
Unit Price Total Price
Sr Quantity Total
Description / Specification Unit (Inclusive of all (Inclusive of all
# Per site Quantity
applied taxes) applied taxes)
-Skid Should Be SS and Painted: it should be designed as per quantity of
Solar panels

6 FRP Vessel 21/62 Nos


2 250

7 Multimedia (Gravels, Sand , Carbon , Anthracite etc.) Bags


7 875

8 Multimedia Feed Pump 2 hp (CNP/Equivalent) Nos


1 125

9 Multimedia valve three way Nos


1 125

10 Cartridge Filter housing 20" Jumbo Imported Nos


2 250

Cartridge Filter 20" jumbo 5 micron


11 Nos
1 125

Cartridge Filter 20"jumbo 1 micron


12 Nos
1 125

High Pressure pump 5 hp (CNP or equivalent)


13 Nos
1 125

14 Chemical dosing pump & Tank Nos


1 125

UV Light & Ozonator


15 Nos
-UV Light & Ozonator with frame, Fixing & Wiring 1 125
BATCH # 02 (Supply of RO Plants Electrical & Mechanical Material)
Unit Price Total Price
Sr Quantity Total
Description / Specification Unit (Inclusive of all (Inclusive of all
# Per site Quantity
applied taxes) applied taxes)

16 Flow Meter – ROTA Type Nos


2 250

Pressure Gauges

-pressure Gauge up to 400 psi or as per inlet pressure, by Company of


Wika /Siemens, or Equivalent
17 -Size: 2.5 in. Diameter Nos
6 750
-Fitting Size: 1/4 in. NPT
-Dial Type

18 Control Panel Box for fitting all VFDs, switch and Wiring Nos
1 125

Complete
19 -PVC Fittings 80 Sch for Low pressure / Stainless Steel for High Pressure
Fitting 1 125

20 CIP tank (200 Liters) PE Material Nos


1 125

21 Pressure Switch Nos


1 125

10" Boring

22 -machine Bore of size 10inch RFT


300 37,500
100 To 300 feet but varies at each site

23 6" casing RFT


300 37,500
BATCH # 02 (Supply of RO Plants Electrical & Mechanical Material)
Unit Price Total Price
Sr Quantity Total
Description / Specification Unit (Inclusive of all (Inclusive of all
# Per site Quantity
applied taxes) applied taxes)
-6-inch dia Casing of uPVC C class

Suction Pipe/Delivery Pipe


24 RFT
-Delivery PE pipe of size 1.5-inch dia 300 37,500

Bore Pump
25 Nos
-Bore Pump 5 HP Pump by Company 1 125

PV Module (330 W)

-PV Module (330 W) Polycrystalline with 330 maximum watt at peak Lump
26
hours: the Total panels will be calculated upon total load as 15 KW on sum 1 125
each site, while total RO Sites are 125.

27 VFD 7.5/10 KW Nos


1 125

28 VFD (2.2 KW) Nos


1 125

29 Nos
Universal Mounting Structure 28 3500

30 RFT
Cable Coil (16mm, 10 mm, 8mm) 700 87,500

31 Set
Nut bolts, Cable ties etc. 1 125
BATCH # 02 (Supply of RO Plants Electrical & Mechanical Material)
Unit Price Total Price
Sr Quantity Total
Description / Specification Unit (Inclusive of all (Inclusive of all
# Per site Quantity
applied taxes) applied taxes)

32 Nos
Breakers (25 A, 16 A) 6 125

Grand Total Inclusive of all applicable taxes & Transportation

BIDDER’S COMMENTS/REMARKS:
1.

2.

3.

4.

BATCH # 03 (Labor Work Services for RO Plants Civil work, Electrical & Mechanical)
Sr # Unit Price Total Price
Quantity Per Total
Description / Specification Unit (Inclusive of all (Inclusive of all
site Quantity
applied taxes) applied taxes)

Brick Masonry 1:4 (only Labor charges).


1 CFT 990 123,750
-Labor Cost Only Required (for Batch # 1)

-Color Work (only Labor charges).


2 Sft 2,000 250,000
Labor Cost Only Required (for Batch # 1)

RCC 1:2:4 including Steel binding & form work (only Labor charges).
3 CFT 490 61,250
-Labor Cost Only Required (for Batch # 1)
BATCH # 03 (Labor Work Services for RO Plants Civil work, Electrical & Mechanical)
Sr # Unit Price Total Price
Quantity Per Total
Description / Specification Unit (Inclusive of all (Inclusive of all
site Quantity
applied taxes) applied taxes)

Roof Tile work including fixing the steel Girder & also T-iron (only labor
4 charges). Sft 335 41,875
-Labor Cost Only Required (for Batch # 1)

Plaster 1:4 (only Labor charges).


5 Sft 1,750 218,750
-Labor Cost Only Required (for Batch # 1)

Excavation (only Labor charges).


6 CFT 2,380 297,500
-Labor Cost Only Required (for Batch # 1)

Stone blast or Shingle 2" to 3" (only Labor charges).


7 CFT 230 28,750
-Labor Cost Only Required (for Batch # 1)

PCC 1:4:8 (only Labor charges).


8 CFT 260 32,500
-Labor Cost Only Required (for Batch # 1)

Installation and commissioning


9 Nos 1 125
-Installation and commissioning (for Batch # 2)

Grand Total Inclusive of all applicable taxes & Transportation

BIDDER’S COMMENTS/REMARKS:

1.
2.
3.
4.
BATCH # 04 (Supply of RO Plant Consumable Item for operation and maintenance)
Unit Price Total Price
Sr Quantity Total
Description / Specification Unit (Inclusive of all (Inclusive of all
# Per site Quantity
applied taxes) applied taxes)

1 Anti Scalent KG 240 30,000

2 Cartridge Filter No 24 3,000

3 Biocide KG 240 30,000

Grand Total Inclusive of all applicable taxes & Transportation

BIDDER’S COMMENTS/REMARKS:

1.
2.
3.
4. _________________________________________________________
1. Designs applicable (ANNEX-A)
Technical instructions to bidders (ANNEX-B):

BOQ for Ro Room And water Point

Measurement
S.No Description Unit Nos
Length Width Height Total Remarks

Excavation work for RO And water


Point

RO Room

Long Wall CFT 2 21.5 2 2 172

Short Wall CFT 2 13.5 2 2 108

Water Point

Short Wall CFT 2 5 1.5 2 30

Long Wall Front CFT 1 6 1.5 2 18

Columns of water point CFT 2 1.5 1.5 2 9

Barbed Wire/Fencing Wall Around


RO Plant of 60'X60'

Excavation for Brick Column for Door


for Boundary wall 13.5''X13.5'' in CFT 2 1.125 1.125 3 7.6
Foundation

Excavation of CC bed for angle to


tight Barbered Wire total Angled
posts at 5'c/c total perimeter is 240'
where 4 columns are at each corner CFT 70 1.5 1.5 2 315.0
and 10 columns/posts are at each
side two column for Door (including Column are fixed in distance
fencing wire) of 5 feet
Excavation of RO waste water pond CFT 1 25 25 2 1250.0

Excavation of pipe line for waste


CFT 1 150 2 2 600.0
water from RO to Pond

CFT Total Quantity for Excavation: 2509.6

2520.0

Stone blast or Shingle 2" to 3"

1 Ro Room

2 Long Wall CFT 2 24 2 0.25 24

3 Short Wall CFT 2 16 2 0.25 16

4 Water Point

5 Short Wall CFT 2 5 1.5 0.25 3.75

6 Long Wall Front CFT 1 6 1.5 0.25 2.25

7 Columns of water point CFT 2 1.5 1.5 0.25 1.125

Excavation for Brick Column for Door


8 CFT 2 1.125 1.125 0.25 0.6
13.5''X13.5'' in Foundation

Excavation of CC bed for angle to


tight Barbered Wire total Angled
posts at 5'c/c total perimeter is 240'
9 CFT 70 1.5 1.5 0.25 39.4
where 4 columns are at each corner
and 10 columns/posts are at each Column are fixed in distance
side including waste water Pond of 5 feet

10 Excavation of RO waste water pond CFT 1 25 25 0.25 156.3


11

CFT Total Quantity for Stone blast: 243.3828125

235

PCC Lean Ratio 1:4:8 for Ro Room


and Water Point

1 Ro Room

2 Long Wall CFT 2 24 2 0.25 24

3 Short Wall CFT 2 16 2 0.25 16

4 Floor in Room CFT 1 20 12 0.25 60

5 Water Point

6 Short Wall CFT 2 4 3 0.25 6

7 Long Wall Front CFT 1 6 1.5 0.25 2.25

8 Columns of water point CFT 2 2 2 0.25 2

9 Floor Water points CFT 1 6 5 0.25 7.5

10 Columns of water point CFT 2 1.5 1.5 0.25 1.125

CC bed for angle to tight Barbered


Wire total Angled posts at 5'c/c total
perimeter is 240' where 4 columns
CFT 70 1.5 1.5 0.25 39.4
are at each corner and 10
columns/posts are at each side, Column are fixed in distance
11 Fence Including Waste Water Pond of 5 feet
12 RO waste water pond CFT 1 22 22 0.25 121.0

CFT Total Quantity for PCC 1:4:8 279.25

270

PCC 1:2:4

Ro Room

Floor CFT 1 20 12 0.25 60

Water Point

Floor CFT 1 6 5 0.25 7.5

Mesh Fencing Wall Around RO


Plant of 60'X60'

CC bed for angle to tight


Barbered Wire total Angled posts 50 1.5 1.5 2 225
at 5'c/c total perimeter is 240'

RO waste water pond sides and


1 25 25 0.25 156.25
slopes 1:3

Quantity for 1:2:4 448.75

Say 450

Brick Masonry work Ratio 1:4 for Ro


Room and Water Point

RO Room
1st Step in Foundation

Long Wall CFT 2 23 1.5 0.5 34.5

Short Wall CFT 2 15 1.5 0.5 22.5

Long Wall CFT 2 23 1.125 1 51.75

Short Wall CFT 2 15 1.125 1 33.75

2nd Step in Plinth

Long Wall CFT 2 22.375 1.125 1.5 75.52

Short Wall CFT 2 14.25 1.125 1.5 48.09

3rd Step (Superstructure)

Long Wall CFT 2 21.5 0.75 12 387

Short Wall CFT 2 13.5 0.75 12 243

Steps of Ro Room

1st CFT 1 6 1 1 6

2nd CFT 1 6 1 1.5 9

3rd CFT 1 6 1 2 12

Water Point

1st Step in Foundation

Short Wall CFT 2 5 1.125 1.5 16.875

Front Wall CFT 1 6 1.125 1.5 10.125

2st Step (Superstructure)

Short Wall CFT 2 5 0.75 1.5 11.3

Front Wall CFT 2 6 0.75 1.5 13.5


1st Step CFT 1 6 1 1 6.0

2nd Step CFT 1 6 1 1.5 9.0

3rd Step CFT 1 6 1 2 12.0

Total 1001.86

1000.00

Deduction for Doors & Window

Door (Double Ply) for 01 No. Rooms


CFT 1 6 0.75 7 31.50
6' x 7'

Windows 4' x 4' CFT 2 4 0.75 4 24

Total 55.50

Total Deduction Quantity: 946.36

1000.00

RCC 1:2:4

Plinth Beam CFT 1 64 1 1 64

Plinth Of Water Point CFT 1 12 1 1 12

Lintel Beam Door CFT 1 6 6 6 216

Lintel Beam Window CFT 2 4 4 6 192

CFT Total Quantity of RCC 1:2:4 484.00

490.00

Steel Work

Ro Room and Water Point


Plinth Beam of RO RFT 4 63.5 254

Plinth Beam of Water Point RFT 4 11.5 46

Rings for Plinth Beam @ 6" C/C RFT 128 3.5 448

Rings for Short walls @ 6" C/C RFT 24 3.5 84

Lentil Beam Door RFT 4 6.5 26

Lentil Beam Window RFT 4 3.5 14

Rings for long walls @ 6" C/C RFT 24 3.5 84

Rings for Short walls @ 6" C/C RFT 8 3.5 28

RFT Total Quantity of Steel: 984

990

Roof Work for Ro And Water Point

Roof Work SFT 1 20.5 12.5 256.25

Water Point SFT 1 12.5 6 75

SFT Total Quantity of Roof tiles Work 331.25

335

Plaster Work Ratio: 1:4

Ro Internal Room SFT 2 12 12 288

Ro Internal Room SFT 2 20 12 480

Ro Outside Room SFT 2 23.5 12 564

Ro Internal Room 2 12.5 12 300

Water Point Walls SFT 2 4 12 96


Water Columns SFT 2 1.5 12 36

Animal Trough Short Wall SFT 2 4 2 16

Animal Trough Long Wall 2 8 2 32

Total Quantity 1812

Deduction for Doors & Windows

Doors for Rooms SFT 1 6 6 36

Windows SFT 2 4 4 32

SFT Total Deduction Quantity: 68

SFT Total Quantity for Plaster 1:4 1744

say 1750

Colour Work

Roof SFT 1 12 20 240

Water Point SFT 1 4 6 24

Ro Internal Room SFT 2 12 12 288

Ro Internal Room SFT 2 20 12 480

Ro Outside Room SFT 2 23.5 12 564

Ro Internal Room 2 12.5 12 300

Water Point Walls SFT 2 4 12 96

Water Columns SFT 2 1.5 12 36

Total Quantity 2028

Deduction for Doors & Windows

Doors for Rooms SFT 1 6 7 42

Windows SFT 2 4 4 32
SFT Total Deduction Quantity: 74 Gallon

SFT Total Quantity for Plaster 1:4 1954 15.03076923

Summary Cost for Ro Room And water Point

Stone Binding Roof


S.No Description Unit Quantity Excavation Cement Sand Crush Bricks Steel Colour
2"/3" Wire Tiles

1 Excavation CFT 2520 2520

Stone blast
2 or Shingle 2" CFT 235
to 3" 235

3 PCC 1:4:8 CFT 270 25.92 129.6 259.2

4 PCC 1:2:4 CFT 450 79.2 198 396

Brick
5 CFT 1000
Masonry 1:4 46 240 13500

6 RCC 1:2:4 CFT 490 86.24 215.6 431.2

Steel 1/2"
7 KG 990
Dia (Deform) 300 4

Roof Tile
8 SFT 335
work 13.4 67 670

9 Plaster 1:4 SFT 1750 14.9352 74.676

Colour Work
10 SFT 1960
Oil Paint 1960

Total Material Quantity: 2520.000 265.695 924.876 1086.400 13500.000 235.000 299.970 4.500 670.000 1960.000

add
5.000 7.300 20.120 13.600 500.000 20.000 20.030 3.500 40.000
contingency

Say Suppose 2525.000 275.0 950.0 1100.0 14000.0 250.0 320.0 8.0 670.0 2000.0
1. Delivery Timeframe:

Guaranteed delivery
Batch ACTED delivery
Batch Description Delivery Destination completion time by
# completion deadline
the Supplier

Supply of RO Plant CIVIL WORK


1
Material

Supply of RO Plants Electrical &


2
Mechanical Material
All items (All cost & duties Paid)
Labor Work Services for RO Plants 8 Months
Civil work, Electrical & Mechanical

3 (Designs ANNEX-A)
(BOQ ANNEX – B)

Consumable Item for operation and


4 1 Month
maintenance

2. BIDDER’S TERMS AND CONDITIONS:


4.1. Valid of the offer: _______________________ (recommended: 06 months or more)

4.2. Terms of delivery:_______________________

4.3. Terms of payment: _______________________

4.4. Does Bidder appear on Active Tax Payers List? Yes / No

4.5. Name of Bidder’s Authorized Representative: ________________________

4.6. Authorized signature and stamp: _______________________

2.5. Date: ________________________