Project : 2 storey Renovation

Location : George Town , Laurel , Batangas


Date : June 17 , 2019

ITEM DESCRIPTION QTY Unit price


Welding work hand drill
2 X 2 Tubular 45 pcs 730
Gutter 6 pcs 850
Air Ventillation (1 x 1) 15 pcs 150
PVC Ceiling (7 x 10 ) 10 pcs 480
PVC Molding 1 lot 2250
Hardie Senepa 8 pcs 420
Welding rod 1 lot 1500
Grinding Stone 1 lot 700
Cutting Disc 1 lot 1000
Dirty Kitchen Cabinet
Plywood ( Marine ) 2 pcs 1650
Concealed hinges 8 pcs 150
wood ( 2 x 4 x 8 ) 4 pcs 400
Utility Door
Plywood ( Marine ) 2 pcs 650
Door lock 1 pc 700
Scaffolding ( Kawayan ) 1 lot 5000
Trucking 1 lot 5000
Painting Works 1 lot
Tiling Works 1 lot

TOTAL PRICE :
LABOR COST :
TOTAL AMOUNT

32,850
5,100
2,250
4,800
2,250
3,360
1,500
700
1,000

3,300
1,200
1,600

3,300
700
5,000
5,000

73,910
58,500