Project: Proposed Renovation of Food Court

Location: Lepanto Building, Paseo de Roxas, Makati City


Owner: Maria Lolita D. Cariaga

BILL OF MATERIALS

I - GENERAL REQUIREMENTS
QTY UNIT DESCRIPTION UNIT PRICE
1 lot Permits
1 lot Mobilization and Demobilization 30,000.00
1 lot Delivery of Offsite Fabricated Items 50,000.00
Total

II - SITE/DEMOLITION WORKS
QTY UNIT DESCRIPTION UNIT PRICE
1 lot Demolition 30,000.00
1 lot Clearing, Hauling and Disposal of Debris 40,000.00
1 lot Protection on Premises (Blue Sack) 10,000.00
Total

III - MASONRY/TILE WORKS


QTY UNIT DESCRIPTION UNIT PRICE
8 cu.m. Sand 1,500.00
80 bags Cement 245.00
104 pcs 4" CHB 18.00
0.5 cu.m. 3/4 crush Gravel 3,000.00
95 pcs 60x60 Floor Tiles 280.00
24 pcs 60x60 Wall Tiles 280.00
19 bags Tile Adhesive 350.00
Total

IV - CARPENTRY WORKS
A- Chairs and Tables
QTY UNIT DESCRIPTION UNIT PRICE
167 pcs 1 x 2 x 1.5mm tubular 570.00
8 pcs 3 x 3 x 2.0mm tubular 1,025.00
210 pcs 1 x 3 x 4 ecowood 120.00
210 pcs 1 x 3 x 2 ecowood 60.00
210 pcs 1 x 3 x 6 ecowood 180.00
24 PCS 2 x 4 x 10 ecowood 500.00
90 pcs 1 x 6 x 10 ecowood 400.00
4000 pcs black wood screw 1 1/2 0.75
326 pcs 3/8 x 2 1/2 lag screw with 1/2 expansion shell 80.00
1 pcs 4 x 8 MS plate 3mm (cut to 0.15 x 0.15) 7,000.00
44 pcs 3/4 Laminated Marine Plywood 3,500.00
220 m Edge Band 60.00
3 kg Hot Melt Adhesive 400.00

Total
B - Kiosk
QTY UNIT DESCRIPTION UNIT PRICE
18 pcs Kiosk 30,000.00
8 pcs Stainless Sink 60 x 60 12,000.00
Total

C- Stalls
QTY UNIT DESCRIPTION UNIT PRICE
186 pcs 2 x 2 x 1.5mm tubular 650.00
210 pcs 3/8 x 2 1/2 lag screw with 1/2 expansion shell 50.00
14 kg flux cored wire 400.00
98 pcs Aluminum Composite Panel 3mm 1,500.00
700 m Backer Rod Foam 15.00
140 tube Silicon Sealant 150.00
7 pcs Kitchen Sink Stainless 15,000.00
7 pcs Counter Stainless 14,000.00
7 lot Ceiling works 10,000.00
Total

V - STEEL WORKS
QTY UNIT DESCRIPTION UNIT PRICE
18 2 x 6 x 1.5mm Tubular 1,650.00
6 2 x 6 x 3mm Channel Bar 5,100.00
4 3/16 x 2 Angle Bar 980.00
30 3/8 x 2 1/2 lag screw with 1/2 expansion shell 50.00
5 Flux cored wire 400.00
4 Welding Rod 100.00
24 2 x 2 x 1.5mm tubular 650.00
6 1 x 2 x 1.5mm tubular 535.00
4 3/4 Marine Plywood 2,100.00
14 6mm Ficem Board 750.00
500 Black Screw 1 1/2 0.75
Total

VI - PLUMBING WORKS
QTY UNIT DESCRIPTION UNIT PRICE
1 lot Plumbing Work 120,000.00
Total
VII - ELECTRICAL WORKS
QTY UNIT DESCRIPTION UNIT PRICE
1 lot Rehabilitation and installation of new lightings 200,000.00
Total
VIII - PAINTING WORKS
QTY UNIT DESCRIPTION UNIT PRICE
1 lot Painting Works 350,000.00
Total
IX - HVAC (Heating, Ventilation, Air Conditioning) Works
QTY UNIT DESCRIPTION UNIT PRICE
1 lot HVAC 150,000.00
Total

X - FIRE PROTECTION SYSTEM


QTY UNIT DESCRIPTION UNIT PRICE
1 lot Rehabilitation of Fire Detection and Alarm System 30,000.00
Total

I - GENERAL REQUIREMENTS
II - SITE/DEMOLITION WORKS
III - MASONRY/TILE WORKS
IV - CARPENTRY WORKS
A - Chairs and Tables
B - Kiosk
C- Stalls
V - STEEL WORKS
VI - PLUMBING WORKS
VII - ELECTRICAL WORKS
VIII - PAINTING WORKS
IX - HVAC (Heating, Ventilation, Air Conditioning) Works
X - FIRE PROTECTION SYSTEM

Total Material Cost


Labor Cost
OCM (10%)
CP (10%)
Partial Cost

Total Cost
PRICE

30,000.00
60,000.00
90,000.00

PRICE
30,000.00
50,000.00
6,000.00
86,000.00

PRICE
12,000.00
19,600.00
1,872.00
1,500.00
26,600.00
6,720.00
6,650.00
74,942.00

PRICE
95,190.00
8,200.00
25,200.00
12,600.00
37,800.00
12,000.00
36,000.00
3,000.00
26,080.00
7,000.00
154,000.00
13,200.00
1,200.00

431,470.00

PRICE
540,000.00
96,000.00
636,000.00

PRICE
120,900.00
10,500.00
5,600.00
147,000.00
10,500.00
21,000.00
105,000.00
98,000.00
70,000.00
588,500.00

PRICE
29,700.00
30,600.00
3,920.00
1,500.00
2,000.00
400.00
15,600.00
3,210.00
8,400.00
10,500.00
375.00
106,205.00

PRICE
120,000.00
120,000.00

PRICE
200,000.00
200,000.00

PRICE
350,000.00
350,000.00

PRICE
150,000.00
150,000.00

PRICE
30,000.00
30,000.00

90,000.00
86,000.00
74,942.00

431,470.00
636,000.00
588,500.00
106,205.00
120,000.00
200,000.00
350,000.00
150,000.00
30,000.00

1,201,117.00
840,781.90
204,189.89
224,608.88
2,470,697.67

3,410,697.67
Project: Proposed Renovation of Food Court
Location: Lepanto Building, Paseo de Roxas, Makati City
Owner: Maria Lolita D. Cariaga

BILL OF MATERIALS

I - GENERAL REQUIREMENTS
QTY UNIT DESCRIPTION UNIT PRICE
1 lot Permits
1 lot Mobilization and Demobilization 30,000.00
1 lot Delivery of Offsite Fabricated Items 50,000.00
Total

II - SITE/DEMOLITION WORKS
QTY UNIT DESCRIPTION UNIT PRICE
1 lot Demolition 30,000.00
1 lot Clearing, Hauling and Disposal of Debris 40,000.00
1 lot Protection on Premises (Blue Sack) 10,000.00
Total

III - MASONRY/TILE WORKS


QTY UNIT DESCRIPTION UNIT PRICE
8 cu.m. Sand 1,500.00
80 bags Cement 245.00
104 pcs 4" CHB 18.00
0.5 cu.m. 3/4 crush Gravel 3,000.00
95 pcs 60x60 Floor Tiles 280.00
24 pcs 60x60 Wall Tiles 280.00
19 bags Tile Adhesive 350.00
Total

IV - CARPENTRY WORKS
A- Chairs and Tables
QTY UNIT DESCRIPTION UNIT PRICE
Total
B - Kiosk
QTY UNIT DESCRIPTION UNIT PRICE
18 pcs Kiosk 30,000.00
8 pcs Stainless Sink 60 x 60 12,000.00
Total

C- Stalls
QTY UNIT DESCRIPTION UNIT PRICE
186 pcs 2 x 2 x 1.5mm tubular 705.00
210 pcs 3/8 x 2 1/2 lag screw with 1/2 expansion shell 80.00
14 kg flux cored wire 400.00
98 pcs Aluminum Composite Panel 3mm 1,550.00
700 m Backer Rod Foam 15.00
140 tube Silicon Sealant 150.00
7 pcs Kitchen Sink 20,000.00
7 pcs Counter 18,000.00
7 lot Ceiling 10,000.00
Total

V - STEEL WORKS
QTY UNIT DESCRIPTION UNIT PRICE
18 2 x 6 x 1.5mm Tubular 1,800.00
6 2 x 6 x 3mm Channel Bar 5,100.00
4 3/16 x 2 Angle Bar 980.00
30 3/8 x 2 1/2 lag screw with 1/2 expansion shell 80.00
5 Flux cored wire 400.00
4 Welding Rod 100.00
24 2 x 2 x 1.5mm tubular 705.00
6 1 x 2 x 1.5mm tubular 570.00
4 3/4 Marine Plywood 2,100.00
14 6mm Ficem Board 750.00
500 Black Screw 1 1/2 0.75
Total

VI - PLUMBING WORKS
QTY UNIT DESCRIPTION UNIT PRICE
1 lot Plumbing Work 120,000.00
Total
VII - ELECTRICAL WORKS
QTY UNIT DESCRIPTION UNIT PRICE
1 lot Rehabilitation and installation of new lightings 200,000.00

Total
VIII - PAINTING WORKS
QTY UNIT DESCRIPTION UNIT PRICE
1 lot Painting Works 350,000.00
Total
IX - HVAC (Heating, Ventilation, Air Conditioning) Works
QTY UNIT DESCRIPTION UNIT PRICE
1 lot HVAC 150,000.00
Total

X - FIRE PROTECTION SYSTEM


QTY UNIT DESCRIPTION UNIT PRICE
1 lot Rehabilitation of Fire Detection and Alarm System 30,000.00
Total

I - GENERAL REQUIREMENTS
II - SITE/DEMOLITION WORKS
III - MASONRY/TILE WORKS
IV - CARPENTRY WORKS
A - Chairs and Tables
B - Kiosk
C- Stalls
V - STEEL WORKS
VI - PLUMBING WORKS
VII - ELECTRICAL WORKS
VIII - PAINTING WORKS
IX - HVAC (Heating, Ventilation, Air Conditioning) Works
X - FIRE PROTECTION SYSTEM

Total Material Cost


Labor Cost
OCM (10%)
CP (10%)
Partial Cost

Total Cost
PRICE

30,000.00
50,000.00
80,000.00

PRICE
30,000.00
40,000.00
10,000.00
80,000.00

PRICE
12,000.00
19,600.00
1,872.00
1,500.00
26,600.00
6,720.00
6,650.00
74,942.00

PRICE
-

PRICE
540,000.00
96,000.00
636,000.00

PRICE
131,130.00
16,800.00
5,600.00
151,900.00
10,500.00
21,000.00
140,000.00
126,000.00
70,000.00
672,930.00

PRICE
32,400.00
30,600.00
3,920.00
2,400.00
2,000.00
400.00
16,920.00
3,420.00
8,400.00
10,500.00
375.00
111,335.00

PRICE
120,000.00
120,000.00

PRICE
200,000.00

200,000.00
PRICE
350,000.00
350,000.00

PRICE
150,000.00
150,000.00

PRICE
30,000.00
30,000.00

80,000.00
80,000.00
74,942.00

-
636,000.00
672,930.00
111,335.00
120,000.00
200,000.00
350,000.00
150,000.00
30,000.00

1,495,207.00
859,744.02
235,495.10
259,044.61
2,849,490.74

3,779,490.74