M/S. KAMAL ENTERPRISE

Section 6. Bill of Quantities

Bill of Quantities

Bill of Quantities

Item Unit Total


Unit Price Total Price
Item Code Description Measurement Price (In Price (In
Group Quantity (In words: (In words:
no. (if of Item Unit figures: figures:
BDT) BDT)
any) BDT) BDT)

Earthwork from
Railway land
(In shingle,
gravel,
boulders, hard
moorum mixed
with stone or Seventy-Three
Sub Three
similar requiring Thousand
Estt.``A'' Hundred
1 N/A use of picks) by cum 245.000 300.001 73500.245 Five Hundred
Works point Zero
head lead with point Two
portion Zero One
lead not Four Five
exceeding 30
meter & height
not exceeding
1.5 meter
including
dressing.

Dismantling
Brick works in
Mud or in Lime
mortar
including Jack
arch roofing or
Sub
in Cement Fifty point Two Thousand
Estt.``A''
2 N/A mortar cum 40.000 50.001 Zero Zero 2000.040 point Zero
Works
whatever it may One Four
portion
of any
proportion in/c.
cleaning and
stacking to a
lead of 30
meter.

Dismantling
Cement
Sub One One
concrete
Estt.``A'' Hundred Thousand Six
3 N/A including cum 16.000 100.001 1600.016
Works point Zero Hundred point
removing the
portion Zero One Zero One Six
same within 30
meter lead.

Dismantling
Reinforced
cement
Sub concrete work Sixteen Ninety-Six
Estt.``A'' from Slabs, Thousand Thousand
4 N/A cum 6.000 16000.001 96000.006
Works Beam, Column point Zero point Zero
portion etc and Zero One Zero Six
removing the
same within

1 of 11 8/2/2020 7:16 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...

100 ft.

One layer of
brick soling with
1st Class bricks
in foundation or
Sub in floor in/c One Two Thousand
Estt.``A'' preparation of Hundred Four Hundred
5 N/A sqm 24.000 100.001 2400.024
Works bed and filling point Zero point Zero
portion the Zero One Two Four
intersectices
with local sand
etc all
complete.

Brick works in
Cement mortar
in Super
Structure or
Ground floor
with first class One Lakh
Sub Nine
bricks In Seventeen
Estt.``A'' Thousand
6 N/A Proportion 1:4 cum 13.000 9000.001 117000.013 Thousand
Works point Zero
as per drawing point Zero
portion Zero One
design, One Three
standrad
specification of
contract and
derection of
PM.

Earthwork from
Railway land by
head lead with
lead not
exceeding 30
meter & height
not exceeding
1.5 meter
including
dressing. In
shingle, gravel,
Sub One Lakh
boulders, hard Six Hundred
Estt.``A'' Fifty-Six
7 N/A moorum mixed cum 260.000 600.001 point Zero 156000.260
Works Thousand
with stone or Zero One
portion point Two Six
similar requiring
use of picks
Extra on items
1(i) to (iv) if
saturated
inclusive of
bailing out of
water and Extra
on items 1(i) to
(iv) for works
on foundation.

Khoa
Consolidation
(2:1) in
foundation Three Lakh
Sub trenches or Five
Seventy
Estt.``A'' floor with 50 Thousand
8 N/A cum 74.000 5000.001 370000.074 Thousand
Works mm down well point Zero
point Zero
portion graded brick Zero One
Seven Four
chips and sand
F.M. 1.2 as per
drawing design,

2 of 11 8/2/2020 7:16 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...

standrad
specification of
contract and
derection of
PM.

Concrete in
cement mortar
with cement,
sand (F.M. 1.2)
and 20 mm
(3/4") down
Sub Fifteen Ninety
graded broken
Estt.``A'' Thousand Thousand
9 N/A brick chips in cum 6.000 15000.001 90000.006
Works point Zero point Zero
proportion 1:2:4
portion Zero One Zero Six
including
mixing, laying,
compacting to
level, curing
etc. all
complete.

Flush pointing
to brick wall
with cement
sand (F.M. 1.2)
mortar in
proportion (1:2) Two Hundred
Sub
with cement Five point and
Estt.``A''
10 N/A including raking sqm 55.000 5.001 Zero Zero 275.055 Seventy-Five
Works
out joints, and One point Zero
portion
necessary Five Five
scaffolding,
curing at least 7
days in/c all the
charge etc. all
complete.

Plaster with
Cement & Sand
(F.M. 1.2)
mini-mum 12
mm thick on
wall(In
Sub
proportion 1: 4) One point Fifty-Three
Estt.``A''
11 N/A including sqm 53.000 1.001 Zero Zero 53.053 point Zero
Works
washing the One Five Three
portion
sand, cleaning
the surface,
curing at least 7
days etc. all
complete
(Ground Floor).

Reinforced
Cement
Concrete with
Composite
Portland
Cement Nine Lakh
Sub Fourteen
(conforming to Sixty-Six
Estt.``A'' Thousand
12 N/A BDS cum 69.000 14000.001 966000.069 Thousand
Works point Zero
EN-197-1-CEM point Zero Six
portion Zero One
1 (32.5 to 52.5 Nine
N)/ , best
quality of 100%
Sylhet sand or
coarse sand of

3 of 11 8/2/2020 7:16 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...

equivalent (F.M.
2.2)] and 20
mm (3/4") down
graded broken
stone chips in
proportion 1 :
1.5 : 3 including
mixing, laying,
compacting by
vibrator
machine,
erecting &
removing
centering-
shuttering
(Steel), curing
etc. all
complete in
mate footing,
abutment, pier,
slab, wingwall ,
Drop walls,
Railings, etc. [
Excluding Cost
of
Reinforcement
and its
Fabrication]

Supplying,
Fabrication of
M.S rod (60
grade) in RCC Eight Lakh
Sub Seventy
works as per Forty
Estt.``A'' Thousand
13 N/A drawing design, M.ton 12.000 70000.001 840000.012 Thousand
Works point Zero
standrad point Zero
portion Zero One
specification of One Two
contract and
derection of
PM.

Making & fixing


Number
Plaques on
buildings,
bridges etc
including
Sub One
painting, Four Hundred
Estt.``A'' Hundred
14 N/A lettering etc as Nos. 4.000 100.001 400.004 point Zero
Works point Zero
per drawing Zero Four
portion Zero One
design,
standrad
specification of
contract and
derection of
PM.

Making weep
Sub holes in 50 t0 Seven
Fifty point
Estt.``A'' 75 mm dia in Thousand
15 N/A Meter 140.000 50.001 Zero Zero 7000.140
Works wall ( for point One
One
portion passage of Four
water )

Sub Supplying, Five One Lakh


Estt.``A'' filling Sand Hundred Fifteen
16 N/A (F.M.0.8 to 1.0) cum 230.000 500.001 115000.230 Thousand
Works point Zero
portion in foundation, Zero One point Two

4 of 11 8/2/2020 7:16 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...

plinth, road
bed,
embankment
including
Three
ramming in 150
mm layer with
watering etc. all
complete.

Supplying,
fitting & fixing
50 mm dia best
quality uPVC
Soil, waste,
Ventilation pipe
having wall
thickness 2.5 -
Sub Two Nine
3.0 mm and
Estt.``A'' Hundred Thousand Two
17 N/A other physical, Meter 46.000 200.001 9200.046
Works point Zero Hundred point
chemical,
portion Zero One Zero Four Six
thermal, fire
resistivity
properties in
position with
sock-ets, bend,
cowl, clamp
etc. all
complete.

Supplying and
laying of Single
Layer
Polythene
Sheet weighing
one Kilogram One
Sub
per 6.5 Sqm. in Twenty point Thousand Two
Estt.``A''
18 N/A floor or any sqm 64.000 20.001 Zero Zero 1280.064 Hundred and
Works
where below One Eighty point
portion
cement Zero Six Four
concrete etc.
with 150 mm
lap in joint etc.
complete in all
respect

Shoring upto 2
meter (7 ft)
One
depth as per
Sub Thousand Two Lakh
drawing design,
Estt.``A'' Five Twenty-Five
19 N/A standrad sqm 150.000 1500.001 225000.150
Works Hundred Thousand
specification of
portion point Zero point One Five
contract and
Zero One
derection of
PM.

Turfing
earthwork 150
Nine
mm thick
Thousand
Sub including
Five point Three
Estt.``A'' cutting,
20 N/A sqm 1876.000 5.001 Zero Zero 9381.876 Hundred and
Works carrying, fixing,
One Eighty-One
portion ramming,
point Eight
dressing etc. all
Seven Six
complete to any
lead and lift.

5 of 11 8/2/2020 7:16 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...

Carriage of One Lakh


Sub Five
materials by Ninety-Seven
Estt.``A'' Hundred
21 N/A head lead with cum 394.000 500.001 197000.394 Thousand
Works point Zero
extra 17 leads point Three
portion Zero One
etc. Nine Four

Filling earth &


bats or
boulders
behind
Four
retaining walls Two Lakh
Sub Thousand
or behind the Seventy-Nine
Estt.``A'' Five
22 N/A abutments of cum 62.000 4500.001 279000.062 Thousand
Works Hundred
bridges point Zero Six
portion point Zero
available within Two
Zero One
a lead of 400
meter and lift
not exceeding
1.5 meter

Excavating
earth/ sand/
ashes from
Railway land,
supplying
gunny bags &
filling the
excavated
earth/ sand in
Two Lakh
gunny bags of
Sub Eighty-Nine
0.0354 Cum Fifty point
Estt.``A'' Thousand
23 N/A [1.25 cft] Bags 5780.000 50.001 Zero Zero 289005.780
Works AND Five
capacity One
portion point Seven
[assuming
Eight
0.0283 Cum (1
cft) of fill] with
stitching,
throwing in
water or
pitching in
layers by head
lead in/c all
lead & lifts.

Earthwork from
Railway land by
head lead with
lead not
exceeding 30
meter & height
not exceeding
1.5 meter
including
dressing In
Sub Clay stiff & soft Twenty-Eight
Thirty point
Estt.``A'' moorum Thousand Two
24 N/A cum 940.000 30.001 Zero Zero 28200.940
Works requiring use of Hundred point
One
portion picks Leads on Nine Four
earth 150 mm
thick actually
carried over 30
meter for every
15 meter or
part there of in
excess of the
1st 30 meter
free and Lift on
earth 150 mm

6 of 11 8/2/2020 7:16 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...

thick actually
lifted over 1.5
meter height for
every 1.5 meter
or part there of
in excess of the
1st 1.5 meter
free.

Cost of
conducting sub
soil
investigation
and site
surveying
including
preparation of
detail structural
Sub Seventy-Five Seventy-Five
design drawing
Estt.``A'' Thousand Thousand
25 N/A considering 25 Nos. 1.000 75000.001 75000.001
Works point Zero point Zero
M.T safe axle
portion Zero One Zero One
load all
complete and
review of the
drawing from
any recognized
institutions as
per direction of
Engineer -in
-charge or PE .

Dismantling of
fish plated
wooden
sleepered MG
Track including
loading the
released
Sub Eight
materials at Six Thousand
Estt.``B'' Thousand
26 N/A outside station Km 0.750 8000.001 6000.001 point Zero
P-Way point Zero
limit and Zero One
portion Zero One
unloading the
same at station
limit, stacking
excluding cost
of carrying i.e.
hire charge of
Ballast Train

Lifting track
(MG) 150 mm
by three lifts of
50 mm each
including
tightening
fastenings,
putting back
Sub Eighty Sixty
ballast, aligning
Estt.``B'' Thousand Thousand
27 N/A to correct Km 0.750 80000.001 60000.001
P-Way point Zero point Zero
alignment,
portion Zero One Zero One
leveling to
proper level,
packing, boxing
and tiding the
ballast to
proper section
etc. all
complete

7 of 11 8/2/2020 7:16 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...

Lowering track
(MG) 150 mm
in three stage,
each stage of
50 mm
including
tightening
fastenings,
Sub putting back Eighty Sixty
Estt.``B'' ballast, aligning Thousand Thousand
28 N/A Km 0.750 80000.001 60000.001
P-Way to correct point Zero point Zero
portion alignment, Zero One Zero One
leveling to
proper level,
packing, boxing
and tiding the
ballast to
proper section
etc. all
complete.

Linking /
Construction of
MG track
including
loading,
unloading of
materials,
preparation of
formation bed
to proper slope,
Sub fixing center Eighty Sixty
Estt.``B'' line, pairing of Thousand Thousand
29 N/A Km 0.750 80000.001 60000.001
P-Way rails, fastening point Zero point Zero
portion rails & sleeper, Zero One Zero One
aligning the
track, putting
back ballast
and initial
Packing to pass
train with
restricted
speed
[Excluding cost
of Materials]

Final Through
Packing of
wooden
sleepered track
including
Sub putting back Eighty Sixty
Estt.``B'' ballast, aligning Thousand Thousand
30 N/A Km 0.750 80000.001 60000.001
P-Way and leveling the point Zero point Zero
portion track, boxing Zero One Zero One
ballast and
tidying the
ballast to
proper section
(MG Track).

One Lakh
Sub Wages for Thirteen
Ninety-Five
Estt.``B'' bridge Thousand
31 N/A Man-month 15.000 13000.001 195000.015 Thousand
P-Way chowkider 3 point Zero
point Zero
portion Nosx 05 Month. Zero One
One Five

8 of 11 8/2/2020 7:16 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...

Labor for
Loading within
station limit with
head lead not
exceeding 30
meter in case
Sub of earth, sand, Two One Lakh
Estt.``C'' ballast etc. & Thousand Twenty
32 N/A M.ton 60.000 2000.001 120000.060
BE/E/CTG`s 60 meter in point Zero Thousand
Portion case of other Zero One point Zero Six
materials
including
stacking where
necessary &
loading into
wagon.

Carriage by
materials trolley
upto distance of
5 Km. including
both way
loading,
un-loading and
Sub stacking of Two One Lakh
Estt.``C'' materials within Thousand Twenty
33 N/A M.ton 60.000 2000.001 120000.060
BE/E/CTG`s 60 meter lead point Zero Thousand
Portion and 1.5 meter Zero One point Zero Six
lift & carrying
the empty
trolley to the
nearest station
and keeping
the same to a
safe place.

Making crib for


temporary
Sub arrangement
Ten point
Estt.``C'' with C.C. Crib Two Thousand
34 N/A Nos. 200.000 10.001 Zero Zero 2000.200
BE/E/CTG`s including point Two
One
Portion loading,
unloading etc
all complete.

Dismantling
crib from
temporary
arrangement
making/
erected with
Sub Two
C.C. Crib Twelve
Estt.``C'' Hundred
35 N/A including Nos. 60.000 200.001 12000.060 Thousand
BE/E/CTG`s point Zero
loading, point Zero Six
Portion Zero One
unloading,
carrying and
stacking to a
safe distance
etc. all
complete.

Making Sleeper
bed block
Sub including all Five
Estt.``C'' iron works Hundred One Lakh
36 N/A cum 200.000 500.001 100000.200
BE/E/CTG`s excluding the point Zero point Two
Portion cost of sleeper Zero One
and dismantling

9 of 11 8/2/2020 7:16 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...

the same.

Erecting RS
Joist as
temporary Three Lakh
Sub Eighteen
service girder in Fifteen
Estt.``C'' Thousand
37 N/A Bridges on M.ton 17.500 18000.001 315000.018 Thousand
BE/E/CTG`s point Zero
block period point Zero
Portion Zero One
excluding the One Eight
works pre
block.

Supplying,
filling Sand
(F.M.0.8 to 1.0)
in foundation,
Sub plinth, road Seven Fifty-Six
Estt.``C'' bed, Hundred Thousand
38 N/A cum 80.000 700.001 56000.080
BE/E/CTG`s embankment point Zero point Zero
Portion including Zero One Eight
ramming in 150
mm layer with
watering etc. all
complete.

Providing
Compacted
Sub-base
Course with
well graded
metal of
crushed well
brunt 1st class
picked jhama
chips / khoa
and sand (F.M.
1.2) with mixing
proportion 2: 1
having
compacted
One One Lakh
thickness made
Sub Thousand Twenty-Seven
as per
Estt.``C'' Seven Thousand
39 N/A specification cum 75.000 1700.001 127500.075
BE/E/CTG`s Hundred Five Hundred
including
Portion point Zero point Zero
handling,
Zero One Seven Five
spreading
uniformly to
proper grade,
camber and
super elevation,
compacted by 8
to 10 ton
capacity power
driven road
roller and
watering
properly and
blinding with
sand in/c all
cost.

Fifty-Two Lakh
Forty-Three
Thousand
Grand Seven
5243799.333
Total: Hundred and
Ninety-Nine
point Three

10 of 11 8/2/2020 7:16 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...

Three Three

* Note: All applicable taxes, custom duties, VAT and other levies payable by the Contractor under the Contract shall be included
in the unit prices submitted by the Tenderer.