Labour details for Staircase Tapp

Sr.no Activity Mason


1 Tandoor cutting work 1
2 Riser cutting + shifting work 0.5
3 Tandoor fixing work 2
3.5

mason 3.5
m/c 1
M/semi 2

total Area of measurment ( both Tappa & Riser) 115


R.ft

company Labour Rate per RFT ( both tappa & riser) 75

as per company rate amount


But contractor gives to sub contractor in ( both tappa 275
+ riser ) as 1 nos

as per sub contractor billing amount 8250


Labour details for Staircase Tappa + Riser work
M/semi M/c Out turn Remark
1
including cutting, thickness, polish
0.5 Total 115 R.f.t work done ( both tappa and chamfer
1 + Riser)
1.5 1

950 3325
500 500
650 1300
total 5125

labour cost consume per R.ft


44.57

8625
Staircase Tappa + Riser Tandoor 25mm Therotical Qty
Sr.no components Nos length width
1 Tappa 30 3.83 0.91
2 Riser 30 3.83 0.55

Staircase Tappa + Riser Tandoor 25mm westage work out qty


Sr.no components Nos length width
1 Tappa 30 4 1
2 Riser 30 4 1

Material Cost
sr.no Material Qty Unit Rate
1 Tandoor 240.000 sq.ft 55
2 westage 24.000 sq.ft 55
3 Transport

Measurment Area 230 RFT


cost of material in RFT 66.174
otical Qty
Qty (Sq.ft)
2.196
1.327
3.523

work out qty


Qty (Sq.ft)
120.000
120.000
240.000

Amount
13200
1320
700
15220