PATIL CONSTRUCTION
Paud Road
RCC Strom water chember Size- 0.900m x 0.900m x 1.50m (Thickness- 0.200m)
1 ) Shuttering Quantity
Sr. No. Discription Unit No.s Length Depth Width Total Qty. Rate Total Amount
2 ) Concrete Quantity
Sr. No. Discription Unit No.s Length Ht./Depth Width Total Qty. Rate Total Amount
1 Cocrete work -M20 Cum 2 1.30 1.50 0.20 0.78 125 97.5
2 Cocrete work -M20 Cum 2 0.90 1.50 0.20 0.54 125 67.5
3 Cocrete PCC work Cum 1 1.50 1.50 0.10 0.23 125 28.125
3 ) Steel binding & Cutting (26.36Kg/Sqm) (Structure containing reinforcement below 12mm dia.)
Total Qty. Total Qty. in
Sr. No. Discription Unit No.s Length Ht./Depth Rate Total Amount
inSqm. Kg
1 Steel Binding work (Labour charges 2600Rs/Mtone) Sqm 4 1.30 1.50 7.80 205.61 3400 699.0672
RCC Strom water chember Size- 0.900m x 0.900m x 2.0m (Thickness- 0.200m)
1 ) Shuttering Quantity
Sr. No. Discription Unit No.s Length Depth Width Total Qty. Rate Total Amount
2 ) Concrete Quantity
Sr. No. Discription Unit No.s Length Ht./Depth Width Total Qty. Rate Total Amount
1 Cocrete work -M20 Cum 2 1.30 2.00 0.20 1.04 125 130
3 Cocrete PCC work Cum 1 1.50 2.00 0.10 0.30 125 37.5
3 ) Steel binding & Cutting (26.36Kg/Sqm) (Structure containing reinforcement below 12mm dia.)
Total Qty. Total Qty. in
Sr. No. Discription Unit No.s Length Ht./Depth Rate Total Amount
inSqm. Kg
1 Steel Binding work (Labour charges 2600Rs/Mtone) Sqm 4 1.30 2.00 10.40 274.14 3400 932.0896
RCC Strom water chember Size- 0.900m x 0.900m x 2.50m (Thickness- 0.200m)
1 ) Shuttering Quantity
Sr. No. Discription Unit No.s Length Depth Width Total Qty. Rate Total Amount
2 ) Concrete Quantity
Sr. No. Discription Unit No.s Length Ht./Depth Width Total Qty. Rate Total Amount
1 Cocrete work -M20 Cum 2 1.30 2.50 0.20 1.30 125 162.5
2 Cocrete work -M20 Cum 2 0.90 2.50 0.20 0.90 125 112.5
3 Cocrete PCC work (M10) Cum 1 1.50 2.50 0.10 0.38 125 46.875
3 ) Steel binding & Cutting (26.36Kg/Sqm) (Structure containing reinforcement below 12mm dia.)
Total Qty. Total Qty. in
Sr. No. Discription Unit No.s Length Ht./Depth Rate Total Amount
inSqm. Kg
1 Steel Binding work Sqm 4 1.30 2.50 13.00 342.68 3400 1165.112
RCC Strom water chember Size- 0.900m x 0.600m x 1.50m (Thickness- 0.200m)
1 ) Shuttering Quantity
Sr. No. Discription Unit No.s Length Depth Width Total Qty. Rate Total Amount Remark
1 Shuttering work -(Internal) Sqm 2 0.60 1.50 1.80 100 180 Shorter Span
2 Shuttering work -(Internal) Sqm 2 0.90 1.50 2.70 100 270 Longer Span
3 Shuttering work-(External) Sqm 2 1.00 1.50 3.00 100 300 Shorter Span
4 Shuttering work-(External) Sqm 2 1.30 1.50 3.90 100 390 Longer Span
2 ) Concrete Quantity
Sr. No. Discription Unit No.s Length Ht./Depth Width Total Qty. Rate Total Amount Remark
1 Cocrete work -M20 -(Longar Span) Cum 2 1.30 1.50 0.20 0.78 125 97.5 Longer Span
2 Cocrete work -M20-(Shorter Span) Cum 2 0.60 1.50 0.20 0.36 125 45 Shorter Span
3 Cocrete PCC work Cum 1 1.50 1.20 0.10 0.18 125 22.5
3 ) Steel binding & Cutting (26.36Kg/Sqm) (Structure containing reinforcement below 12mm dia.)
Sr. No. Discription Unit No.s Length Ht./Depth Total Qty. Total Qty. in Rate Total Amount Remark
inSqm. Kg
1 ) Shuttering Quantity
Sr. No. Discription Unit No.s Length Depth
2 ) Concrete Quantity
Total La
Prepared By Checked BY
L CONSTRUCTION
ud Road
1 ) Shuttering Quantity
Sr. No. Discription Unit No.s Length Depth
2 ) Concrete Quantity
Sr. No. Discription Unit No.s Length Ht./Depth
Total Labo
Total Labo
Prepared By Checked BY