PRODUCTION 

RATE SCHEDULE Crew & Tools Details
Finishing Works Skilled Laborer & Tools

Working  Nos. per  Total  Man Day  Average 


Description of work Unit Qty Unit Price Amount Steel Man Mason Painter Laborer Power Tools Total Nos. Weeks M1 M2 M3 M4 M5 M6 M7 M5 M6 M7 M8 M9 M10 M11 M12
Foreman Hr. Hours x 10 Hrs. MP

Head room  Block work 200mm Sqm 850                   189.75          161,287.50 0.075 0.15 2 0.4 2 0.25 2 0.125 2 12 10625 885 89 14.757 6.000

Pump House Block work  200mm Sqm 126                   189.75            23,908.50


  0.075 0.15 0.4 0.25 0.125 12 1575 131 13 2.188 6.000

Car Park Block work  200mm Sqm 750                   189.75          142,312.50 0.075 0.15 0.4 0.25 0.125 12 9375 781 78 13.021 6.000

21575 1798 180

Working  m². per  Total  Man Day 


Steel Man Mason Painter Laborer Power Tools Total Nos.
Foreman Hr. Hours x 10 Hrs.

NOB balance  Stair Plaster (15mm to 20mm) Sqm 420                     94.25             39,585.00 0.1 0 0.55 0.25 0.1

Plaster (internal), walls final coat Sqm 420 1.6 263 26 4.375 6.000

Plaster (internal), walls rush coat Sqm 420 1.4 300 30 5.000 6.000

Plaster (internal), walls mesh Sqm 420 1.8 233 23 3.889 6.000

Plaster (internal), walls hacking Sqm 420 1 420 42 7.000 6.000

Plaster (internal), walls guide point Sqm 420 1.2 350 35 5.833 6.000

Plaster (internal), walls corner beads Sqm 420 10 42 4 0.700 6.000

1608 161

Pump House internal Plaster (15mm to 20mm) Sqm 516                     94.25             48,633.00 0.1 0 0.55 0.25 0.1

Plaster (internal), walls final coat Sqm 516 1.6 323 32

Plaster (internal), walls rush coat Sqm 516 1.4 369 37

Plaster (internal), walls mesh Sqm 516 1.8 287 29

Plaster (internal), walls hacking Sqm 516 1 516 52

Plaster (internal), walls guide point Sqm 516 1.2 430 43

Plaster (internal), walls corner beads Sqm 516 10 52 5

1975 198

NOB basement Plster (15mm to 20mm) Sqm 175                     94.25             16,493.75 0.1 0 0.55 0.25 0.1

Plaster (internal), walls final coat Sqm 175 1.6 109 11

Plaster (internal), walls rush coat Sqm 175 1.4 125 13

Plaster (internal), walls mesh Sqm 175 1.8 97 10

Plaster (internal), walls hacking Sqm 175 1 175 18

Plaster (internal), walls guide point Sqm 175 1.2 146 15

Plaster (internal), walls corner beads Sqm 175 10 18 2

670 67

O&M basement internal plaster (15mm to 20mm) Sqm 325                     94.25             30,631.25 0.1 0 0.55 0.25 0.1

Plaster (internal), walls final coat Sqm 325 1.6 203 20

Plaster (internal), walls rush coat Sqm 325 1.4 232 23

Plaster (internal), walls mesh Sqm 325 1.8 181 18

Plaster (internal), walls hacking Sqm 325 1 325 33

Plaster (internal), walls guide point Sqm 325 1.2 271 27

Plaster (internal), walls corner beads Sqm 325 10 33 3

1244 124

Control Building External Plaster (20mm) Sqm 390                     94.25             36,757.50 0.1 0 0.55 0.25 0.1

Plaster (external), walls with grooves Sqm 390 10 39 4

Plaster (external), walls without grooves Sqm 390 2 195 20

Plaster (external), walls rush coat Sqm 390 15 26 3

Plaster (external), walls mesh Sqm 390 10 39 4

Plaster (external), walls hacking Sqm 390 10 39 4

Plaster (external), walls guide points Sqm 390 10 39 4

Plaster (external), walls corner beads Sqm 390 10 39 4

416 42

Working  m². per  Total  Man Day 


Steel Man Mason Painter Laborer Power Tools Total Nos.
Foreman Hr. Hours x 10 Hrs.

Building Externlal painting as per specification (2coats) Sqm 2640                     51.00          134,640.00 0.15 0 0.55 0.2 0.1

Surface Preparation Sqm 2640 3 880 88

First Coat Sqm 2640 7.5 352 35

2nd and Final Coat Sqm 2640 7.5 352 35

Buildings internal approval Sqm 1265                     51.00             64,515.00 0.15 0 0.55 0.2 0.1

Surface Preparation Sqm 1265 1.5 843 84

First Coat Sqm 1265 3.5 361 36

2nd and Final Coat Sqm 1265 3.5 361 36

Gallery wall Surface finishing  on concrete wall  Sqm 16000                     40.00          640,000.00

Surface Preparation Sqm 16000 1.5 10667 1067

First Coat Sqm 16000 3.5 4571 457

2nd and Final Coat Sqm 16000 3.5 4571 457

Total Amount        1,338,764.00