UNIT COST

BRIDGE CONSTRUCTION TOTAL AMOUNT


UNIT QUANTITY Material Labor Equipment Others Unit Rate
CARAEL BRIDGE
101(1)b Removal of Existing Concrete Bridge l.s 1 39,580.35 101,026.41 262,569.22 403,175.98 403,175.98
102(4) Re-channeling / Dredging Excavation at River Bed cum 760 - - 360.00 360.00 273,600.00
103(2)a Structural Excavation above OWL cum 800 - 10.31 166.53 176.83 141,467.20
400(17)c Concrete Pile Cast-in Drilled Piles, 1.3m dia, fc=28 MPA lm 110 25,365.12 339.87 3,537.25 29,242.24 3,216,646.62
400(17)d Concrete Pile Cast-in Drilled Piles, 1.5m dia, fc=28 MPA lm 248 31,400.67 371.18 4,107.78 35,879.63 8,898,149.03
400(22)a Pile Integrity Test, Low Strain Integrity Testing ea 6 33,000.00 5,151.47 19,599.67 57,751.14 346,506.82
400(22)b Pile Dynamic Test, High Strain Dynamic Testing ea 3 55,000.00 5,151.47 19,599.67 79,751.14 239,253.41
401(a) Concrete Bridge Railing lm 300 1,827.08 1,681.78 83.78 3,592.64 1,077,791.04
404(a) Reinforcing Steel, Grade 40 kg 62,110 38.20 5.07 0.54 43.81 2,721,225.43
404(b) Reinforcing Steel, Grade 60 kg 41,740 38.93 5.07 0.54 44.54 1,859,057.86
405(d) Structural Concrete, Class A (fc' = 21 MPA) cum 671 4,871.38 134.26 107.61 5,113.25 3,430,992.23
406(1)a Pre-stressed Structural Concrete Members (Girder IV - 30m) ea 20 770,082.62 2,904.17 44,312.06 817,298.86 16,345,977.15
407(1) Lean Concrete, fc' = 10 Mpa cum 4 4,350.15 87.56 162.58 4,600.29 18,401.17
412 Elastomeric Bearing Pad (Dimension) ea 40 6,089.28 42.56 - 6,131.84 245,273.69
413(a) Preformed Sponge Rubber or Cork with sealant ; t = 12mm sqm 6 1,644.50 268.90 - 1,913.40 11,480.40
SPL 414 Metal Drain Pipe lm 12 11,971.40 209.12 179.95 12,360.47 148,325.63
TOTAL CONSTRUCTION COST Php 39,377,323.64