Professional Documents
Culture Documents
Repairing of existing Chainlink fencing on the boundary wall including missing members of the
No. section. With required frame work including all cutting, bending and placing on site as per
satisfaction of Engineer in charge etc. complete
Accessories
Missing Part 20% 1.40 300.00 420.00
(Sor 21-22, IT No. 127)
synthetic enamel paint 7.00 177.00 1239.00
Genrator Charges With Vehile and Driver
1.00 1500.00 1500.00
includind Diesel
4236.60
Add 15 % Contractor Profit 635.49
For 7 sqm 4872.09
For 1 Sq.Mt. 696.01
Say 696.00