Sno Activity Unit Price Quantity Total Price
Code
Earth work excavation by manual means exceeding 1.5 mts in width
taking out the excavated soil and disposal as directed by Engineer-In-
1 ACT0100 396.8 10 3968 Edit
Charge( Ordinary soils) with initial lead of 10 mts and initial lift of 1.5
mts (as per RSSR)
2 ACT0300 Contingencies 1 346000 346000 Edit
TOTAL WORK COST: 350000
Sno Material Unit Price Quantity Total Price
1 Brick Masonry with CM ((1:6) 7606.2 10.79 82070.898 Edit
2 Contigencies 1 45000 45000 Edit
3 Dadooing to walls with white glazed tiles_16952 528.63 28.38 15002.5194 Edit
4 Filling with Gravel in trenches_16950 303.3 2.93 888.669 Edit
5 Filling with usefulavailable excavated earth_16949 35.2 2.6 91.52 Edit
6 Flooring CeramicTiles 7.3mm thickAll Floors_16951 842.7 9.79 8250.033 Edit
7 HYSD steel bar (Fe 415) 74675 0.55 41071.25 Edit
8 Painting to external walls plastic emulsion paint 198.99 43.49 8654.0751 Edit
9 Painting to internal walls plastic emulsion paint 128.3 82.03 10524.449 Edit
10 PCC (1:5:10) 4663.8 2.03 9467.514 Edit
11 Plastering with CM(1:5) Prop_16943 480.29 115.73 55583.9617 Edit
12 RCC M 20 Grade for Lintels 11489.1 0.15 1723.365 Edit
13 VRCC M 20 Nominal Mix in building(Beams)_16975 10466.05 0.95 9942.7475 Edit
14 VRCC M 20 Nominal Mix(Plinth beams)_16938 12281.65 1.42 17439.943 Edit
15 VRCC M20 for Footings 9579.9 0.81 7759.719 Edit
16 VRCC M20 Nominal Mix 20mm (Column Footings)_16973 11956.95 0.75 8967.7125 Edit
17 VRCC M20 Roof slab 100mm thick 1196.95 19.29 23089.1655 Edit