You are on page 1of 2

CURTAIN PLUGGING REPORT

PROYEK BENDUNGAN PAMUKKULU PAKET-1


KABUPATEN TAKALAR- SULAWESI SELATAN

Location : Sandaran Kanan Date : 2021


Blok : Depth : m
Hole No. : Stage : Sheet :
Grouting Injection Cement Injection Sand Injection
Grouting Time
Pressure Preparation Injection Preparation Preparation
Mix C:W Batch Waste Injection Waste Injection Waste Remark
(kg/cm²) Volume Volume Volume Volume
Duration Volume (lt) Volume (kg) Volume (kg) Volume (kg) Volume (kg)
Start (h:m) Finish (h:m) (lt) (lt) (kg) (kg)
(min)

1:1:0.5 0.5 76.27 13.60 62.66 50.00 8.92 41.08 25.00 4.46 20.54

1:1:0.5 1 152.53 13.60 138.93 100.00 8.92 91.08 50.00 4.46 45.54

1:1:0.5 1.5 228.80 13.60 215.19 150.00 8.92 141.08 75.00 4.46 70.54

Preparation Injection Total Injection Cement Total Injection Sand Carry out grouting time
Waste
Lugeon (Lu) = Volume Preparation Preparation Preparation Injection Preparation Tes air Grouting
Volume Volume Waste (kg) Waste (kg)
(lt) (kg) (kg) (kg) (kg) (h:m) (h:m) (h:m)
(lt) (lt)
Today 76.27 13.60 62.66 50.00 8.92 41.08 25.00 4.4588193201 20.54 Contoh Kedalaman 0-10,6 m
Yesterday
Total

Menyetujui, Konsultan Supervisi Kontraktor


Direksi Pekerjaan PT. Indra Karya-Virama Karya-Bina Karya, KSO PT.WIKA-DMT,KSO

...................................... ...................................... ......................................


CURTAIN PLUGGING REPORT
PROYEK BENDUNGAN PAMUKKULU PAKET-1
KABUPATEN TAKALAR- SULAWESI SELATAN

Location : Sandaran Kanan Date : 2021


Blok : Depth : m
Hole No. : Stage : Sheet :
Grouting Injection Cement Injection Sand Injection
Grouting Time
Pressure Preparation Injection Preparation Preparation
Mix C:W Batch Waste Injection Waste Injection Waste Remark
(kg/cm²) Volume Volume Volume Volume
Duration Volume (lt) Volume (kg) Volume (kg) Volume (kg) Volume (kg)
Start (h:m) Finish (h:m) (lt) (lt) (kg) (kg)
(min)

1:1:0.9 0.5 81.03 0.51 80.52 50.00 0.31 49.69 50.00 0.31 49.69

1:1:0.9 1 162.06 0.51 161.55 100.00 0.31 99.69 100.00 0.31 99.69

1:1:0.9 1.5 243.09 0.51 242.58 150.00 0.31 149.69 150.00 0.31 149.69

.
.

Preparation Injection Total Injection Cement Total Injection Sand Carry out grouting time
Waste
Lugeon (Lu) = Volume Preparation Preparation Preparation Injection Preparation Tes air Grouting
Volume Volume Waste (kg) Waste (kg)
(lt) (kg) (kg) (kg) (kg) (h:m) (h:m) (h:m)
(lt) (lt)
Today 81.03 0.51 80.52 50.00 0.31 49.69 50.00 0.31 49.69 Contoh Kedalaman 0-10,6 m
Yesterday
Total

Menyetujui, Konsultan Supervisi Kontraktor


Direksi Pekerjaan PT. Indra Karya-Virama Karya-Bina Karya, KSO PT.WIKA-DMT,KSO

...................................... ...................................... ......................................