1:1:0.5 0.5 76.27 13.60 62.66 50.00 8.92 41.08 25.00 4.46 20.54
1:1:0.5 1 152.53 13.60 138.93 100.00 8.92 91.08 50.00 4.46 45.54
1:1:0.5 1.5 228.80 13.60 215.19 150.00 8.92 141.08 75.00 4.46 70.54
Preparation Injection Total Injection Cement Total Injection Sand Carry out grouting time
Waste
Lugeon (Lu) = Volume Preparation Preparation Preparation Injection Preparation Tes air Grouting
Volume Volume Waste (kg) Waste (kg)
(lt) (kg) (kg) (kg) (kg) (h:m) (h:m) (h:m)
(lt) (lt)
Today 76.27 13.60 62.66 50.00 8.92 41.08 25.00 4.4588193201 20.54 Contoh Kedalaman 0-10,6 m
Yesterday
Total
1:1:0.9 0.5 81.03 0.51 80.52 50.00 0.31 49.69 50.00 0.31 49.69
1:1:0.9 1 162.06 0.51 161.55 100.00 0.31 99.69 100.00 0.31 99.69
1:1:0.9 1.5 243.09 0.51 242.58 150.00 0.31 149.69 150.00 0.31 149.69
.
.
Preparation Injection Total Injection Cement Total Injection Sand Carry out grouting time
Waste
Lugeon (Lu) = Volume Preparation Preparation Preparation Injection Preparation Tes air Grouting
Volume Volume Waste (kg) Waste (kg)
(lt) (kg) (kg) (kg) (kg) (h:m) (h:m) (h:m)
(lt) (lt)
Today 81.03 0.51 80.52 50.00 0.31 49.69 50.00 0.31 49.69 Contoh Kedalaman 0-10,6 m
Yesterday
Total