GEOPILE CONSTRUCTION INC.

LIWAYWAY ST. ,SALIAO ESPERANZA, SULTAN KUDARAT ACCOMPLISHMENT REPORT


PROJECT : Inambatan Bridge, Monkayo FOR THE PERIOD OF June 2020 to Presen
LOCATION : Monkayo, Davao de Oro
CLIENT : Jaime G. Lao Jr. Builders

ACCOMPLISHMENT
TASK AMOUNT
NO. TASK DESCRIPTION QTY UNIT RATE (Php) % WT PREVIOUS THIS PERIOD TO DATE
QTY % AMOUNT QTY % AMOUNT QTY % AMOUNT

1.0 Drilling, Launching of Rebars and Concrete Pouring


3 pcs 1.2m diameter x 30 m 90 lm 16,000.00 1,440,000.00 7.72% 90.00 100.00% 1,440,000.00 90.00 100.00% 1,440,000.00
3 pcs 1.2m diameter x 33 m 99 lm 16,000.00 1,584,000.00 8.50% 99.00 100.00% 1,584,000.00 99.00 100.00% 1,584,000.00
14 pcs 1.8m diameter x 40 m 560 lm 24,000.00 13,440,000.00 72.08% 80.00 14.29% 1,920,000.00 80.00 14.29% 1,920,000.00
2.0 CONCRETE POURING 1,638.79 kg 750.00 1,229,092.50 6.59% 477.37 29.13% 358,027.50 477.37 29.13% 358,027.50
3.0 Driving of Steel Casing
4.0 6 pcs 1.2m diameter x 10 m 60 lot 1,200.00 72,000.00 0.39% 60.00 100.00% 72,000.00 60.00 100.00% 72,000.00
6.0 14 pcs 1.8m diameter x 10 m 140.00 cu.m 2,000.00 280,000.00 1.50% 20.00 14.29% 40,000.00 20.00 14.29% 40,000.00
7.0 MOBILIZATION AND DEMOBILIZATION 1 ls 600,000.00 600,000.00 3.22% 0.50 50.00% 300,000.00 0.50 50.00% 300,000.00
18,645,092.50 100% 0.00% - 30.65% 5,714,027.50 30.65% 5,714,027.50

TOTAL AMT TO DATE PHP 5,714,027.50


TOTAL AMT PREVIOUS BILLING -
TOTAL AMT THIS BILLING 5,714,027.50

LESS : RECOUPMENT(DP) (6,435,719.08)


RETENTION (10%) (571,402.75)

DUE THIS BILLING PhP (1,293,094.33)

PREPARED BY: CHECKED BY: NOTED BY:

GENEVEB S. CATIPAY ENGR. ACE D. NOVO ENGR. JOSE MARI RAFAEL RODRIGUEZ
Geopile Construction Inc. Geopile Construction Inc. Geopile Construction Inc.
Administrative Staff Project Engineer Vice-President
HMENT REPORT
PERIOD OF June 2020 to Present
ACCOMP. REPT. Nō . 01

REMARKS
GEOPILE CONSTRUCTION INC.
LIWAYWAY ST. ,SALIAO ESPERANZA, SULTAN KUDARAT

PROJECT : Inambatan Bridge, Monkayo


LOCATION : Monkayo, Davao de Oro
CLIENT : Jaime G. Lao Jr. Builders

TASK TASK DESCRIPTION QTY UNIT RATE AMOUNT % WT


NO. (Php)

1.0 Driving of Steel Casing


2.0 6 pcs 1.2m diameter x 10 m 39.5 lot 1,200.00 47,400.00 85.56%
3.0 14 pcs 1.8m diameter x 10 m 4.00 cu.m 2,000.00 8,000.00 14.44%
55,400.00 100%

TOTAL AMT TO DATE PHP 55,400.00


TOTAL AMT PREVIOUS BILLING -
TOTAL AMT THIS BILLING 55,400.00

LESS : RECOUPMENT(DP) (21,000,000.00)


RETENTION (10%) (5,540.00)

DUE THIS BILLING PhP (20,950,140.00)

PREPARED BY: CHECKED BY:

GENEVEB S. CATIPAY ENGR. ACE D. NOVO


Geopile Construction Inc. Geopile Construction Inc.
Administrative Staff Project Engineer
ACCOMPLISHMENT REPORT
FOR THE PERIOD OF June 2020 to Present

ACCOMPLISHMENT
PREVIOUS THIS PERIOD TO DATE
QTY % AMOUNT QTY % AMOUNT QTY % AMOUNT

39.50 100.00% 47,400.00 39.50 100.00% 47,400.00


4.00 100.00% 8,000.00 4.00 100.00% 8,000.00
0.00% - 100.00% 55,400.00 100.00% 55,400.00

NOTED BY:

ENGR. JOSE MARI RAFAEL RODRIGUEZ


Geopile Construction Inc.
Vice-President
PLISHMENT REPORT
R THE PERIOD OF June 2020 to Present
ACCOMP. REPT. Nō . 01

0.45x0.45x8m female Test Pile 2


REMARKS 0.45x0.45x15m male Test Pile 2
0.45x0.45x16m 1