Head Work and Spillway

Project :- Finna Oromia Waliso Cluster Finna Oromia Dam Projects


Client:- Irrigation and Pastoralist Development Bureau
Consultant:- Engineering Corporation of Oromia (ECO)
Contractor :- BH-Engineering
Clay
Revised/
Total Materials Todate Executed
S.No Project Name Agreement
Quantity (m3)
Quantity (m3) quantity

1 Finna Gonga Dam 158,442.00 40,553.26 4,962.95

10
ead Work and Spillway Works Construction Construction Material Req
Oromia Dam Projects
nt Bureau
mia (ECO)

Clay Shell
Quarry to Site Aver. Revised/ Todate
Todate Remaining in Todate Executed
Quantity (m3) Hauling Distance Agreement
Quantity (m3)
Remaining in
(km) quantity Quantity (m3)

35,590.31 10 106,469.86 35,770.30 70,699.56


on Material Required

FilterF1 Ripra
Quarry to Site Revised/ Todate Quarry to Site Revised/
Todate Executed
Aver. Hauling Agreement
Quantity (m3)
Remaining in Aver. Hauling Agreement
Distance (km) quantity Quantity (m3) Distance (km) quantity

7 2,696.58 40.63 2,655.95 154 8,722.30


Riprap/Stone
Quarry to
Todate Site Aver.
Todate Executed
Quantity (m3)
Remaining in Hauling
Quantity (m3) Distance
(km)
909.21 7,813.08 3
Project :- Finna Oromia Central Cluster Finna Oromia Dam Projects
Client:- Irrigation and Pastoralist Development Bureau
Consultant:- Engineering Corporation of Oromia (ECO)
Contractor :- BH-Engineering
1st Option of Estimating the Dump Truck Requirment for the Project
P1 Finna Goda Chale Dam Project

Machinery Capacity
Machine Capacity
Loader Bucket Capacity (m3) 3
Howo Dump Truck Capacity soil and sand (m3) 14
Howo Dump Truck Capacity Gravel (m3) 10
Howo Dump Truck Capacity Stone (m3) 8

Hauling
Aver. Truck speed (km/h)
Aver. Hauling Distance (km)
Daily working time (h)
Travel and waiting time (h)
Number of trips per day (8 hours working time )
Number of trips per construction period
Volume of soil or sand material hauled during constrction period per truck (m3)
Volume of gravel hauled during constrction period per truck (m3)
Volume of stone hauled during constrction period per truck (m3)

No. Material Quanitity from Original Contract Total Quantity


1 Impervious Core Material 40,553.26
2 Shell Material 106,469.86
3 Filter Material 2,696.58
4 Stone for Riprap 8,722.30
5 Rock Material -
Total 158,442.00

2nd Option of Estimating the Dump Truck Requirment for the Project
Calculating Dump Trucks Required
Impervious Core Material
Haul Capacity (m3) 14
Bucket Capacity (m3) 3
Hoe should be able to cycle ( sec) 20
Truck speed at gross v. weight 72000-73000 35
Return Speed (hr) 45
Aver. Hauling Distance (km) 2.5
1 Balance Number of Bucket 4.67
2 Loading Time (min) 1.56
3 Hauling Time (min) 4.29
4 Return Time (min) 3.33
5 Dump Time (min) 2.00
6 Truck Cycle Time (min) 11.17

7 Daily working time (h) 8


8 Number of trips per day (8 hours working time ) 42.95
9 Number of trips per construction period 2,494.23
Volume of soil or sand material hauled during constrction period per truck
10 (m3) 34,919.22
11 Number of Desired Dump Truck 1.5
12 Total

2 Calculating Loader Required


Impervious Core Material
Number of dump trucks loaded per truck cycle 7.18
Number of loaders needed 0.31
Total

3 Calculating Excavator Required


Impervious Core Material
Bucket Capacity (m3) 2.00
Volume of soil or sand material loaded per loaders (m3) 0.94
number of excavators needed 0.70
Total

4 Calculating Roller Required


Impervious Core Material
Speed of the roller (km/hr) 3
Width of the roller (m) 2
Average number of path 6
Length of the dam (m) 179
Width of the dam covered by clay per one dump truck (m) 5
Length of dam covered by clay per one dump truck (m) 6
Average width of the dam (m) 12
Volume of clay for single compacted thickness (m3) 1002.4
Time required to complete single path (hr) 0.29
Time required to complete compaction of the whole width of dam (hr) 10.32
Time required to dump the whole volume (hr) 366.41
Number of roller required 1
Total
rojects

Time Description Time


Working days per Month excluding Saturday 22
Working Hours per day including Saturday 8
Working Hours of Saturday per month (hour) 32
Completion period of dam body in (months) 2.23
Total Construction Period (hours) 464.5
Total Construction Period (days) 58.0666666666667
Total Construction Period (Months) 1.94

Clay/Shell Filter Material Rock Material


35 40 35
5 154 3
8 8 8
0.14 3.85 0.09
57.14 2.08 88.89
3,318.10 120.66 5,161.48
46,453.40 - -
- 1,206.60 -
- 41,291.84

Executed Material Remaining Material Number of Desired Dump Truck


4,962.95 35,590.31 1.00
35,770.30 70,699.56 2.00
40.63 2,655.95 2.00
909.21 7,813.08 6.00
- -
116,758.90 11.00

Shell Material Filter Material Stone Material


14 14 14
3 3 3
20 20 30
35 40 35
45 45 45
2.5 77 1.5
4.67 4.67 4.67
1.56 1.56 2.33
4.29 115.50 2.57
3.33 102.67 2.00
2.00 2.00 2.00
11.17 221.72 8.90

8 8 8
42.95 2.16 53.90
2,494.23 125.71 3,130.01

34,919.22 1,759.94 43,820.14


3 2.3 0.3
7.1
7.1

Shell Material Filter Material Stone Material


7.18 142.54 3.82
0.63 0.02 0.12
1.08

Shell Material Filter Material Stone Material


2.00 2.00 2.00
1.88 0.07 0.35
1.41 0.05 0.27
2.43
1.18
checked
464.53333333
4368

104,757.66

1.08

2.43
1.18
Project :- Finna Oromia Central Cluster Finna Oromia Dam Projects
Client:- Irrigation and Pastoralist Development Bureau
Consultant:- Engineering Corporation of Oromia (ECO)
Contractor :- BH-Engineering
Summary of Machineries Required
S.No. Project Name Dump Truck Loader
1 Finna Gonga Dam 11 1
2
3
4
5
6
7
8
9
10
Total Machenry Required 11 1
rojects

d
Excavator Roller
2 1

2 1