Factors o
considered in calculation if truck production,
Number of Bucket Loads
Calculate the number of excavator bucket loads required to load the truck.
cHaulTime
To increase, the efficiency of hauling the following factors should be considered,
)High sate sped
() One-way trallie al1gnment and
qii) Appropriate gear.
Hauling time is given by.
Haul distance(ft)
Hauling time (min) Haul speed (mph)
NW fpm/mph
chart helps in estimating the haul travel speeds
which are based on the total weight
The truck manufacture 's performance area to dumping area.
and grade resistance from loading
of the truck with the load. rolling
d) Return Time
chart is used in determining the retum time. It depends on weight of empty truck,
The truck manufacture's performance
area to loading
area.
resistance from dumping
rolling and grade
Retum dis tan ce (f)
Retum time (min)= Haul speed (mph)
8 fpm 'mph
) Dump Time
tactors.
the following
Dump time is based
on
UNTU-KAKIN
3.14 MANAGEMENT
AND
(0 Truck Cycle Tlme CONSTRUCTION TECHNOLOGY
called as
truck cycle tim
The summation of load time return
timer (r) is
and
(), (d)
Truck cycle time (T)-{,+hauling
timed
time (h), dump ump
( When the integer number of trucks is lower than the balancs mber oftrucks, 12/15
the trucks i.e..
Seitability of Rollers
It is suitable for the soil type such as sands, gravels silts and clayey soils.
These type of rollers provide static compression to the soil. They are used in road construction, ctc.
Sultability of Rollers
of highways
These are suitable for compacting granular base courses, crushed rocks and sands for construction
(e)Grid Rollers
This is a towed unit, which weights about 55 kN to 110 kN.
Suitability of Rollers
Interfering Ploat
are the different bypes of floats Involved | 4.
float which c a u s e s
reduction in lloat
of total
t is that part
I nC P M ?
of successot activitics.
Nov.-16, Set-1, 02[a)
Inf,- TF,-F
Floas
s
represent the flexibility in scheduling. The Note
F Hoatsis useful for the management in representing IFS FFS TF The
scheduling.
e d resources and fexibility of the schedule and flexibility in
floats, slack represents is used
de t0which the resourees will be utilized on different Lake and floats is that slack
erteni
difierence between
slack
basic
whereas float is applied for activities. and
ctivities.
for events
critical activities cannot be scheduled later than their
ofline-of-balance
uses
The
time, without delaying the project turation. So
Q53. What are the speciflc
project planning?
lustrate
r l i e s tschedulet
t s advantages
In
hot exhibit. anyflexibility in scheduling. But flexibility a n s w e r with
suitable example.
your
dey scheduling the non-critical activities of the project
eristsi
Answer
For critical activities zero
Uses of Line-of-Balance
Method
activities non-zero. concepts
For noncritical . I n construction industry the general and
are applied on planning
pes ofPloets of line-of-balance
scheduling methods.
. Total Float
mass housing,
tunnels and
amount of time by which completion of an n high-rise buildings,
Jt is the method is used for
the execution
can be delayed beyond the earliest expected highways. This
sctivity
completion time without affecting the overall project of repetitive unit projects.weakness and focusing8
of
In deciding the
duration time. areas
3. which require
planner on products,line-of-balance
the attention of
TF, -(4-E)- immediate action is carried óut by
Where, method.
project
of activity (G,) the progress of
-Total float a
TF, To developa report on
status of
L,-Latest time ofeventj current status and final
which shows the
oroduction with respect to
objectives.
Earliest time of event i
E, -
it enables the
F, 1-5)-, 3. In the middle of the contract,
can they
managers to see if they coptinue
working,
Where, not.
contract.schedule or
the
FE,-Free float ofactivity (Gi.N meet
the work
E-Earliest time of eventj 4. In the modern construction period,
continuity of Labor ganggs and production rate with
i
Earliest time of event by this method.
E, -
E-Earliest time ofeventj day the second house and on 65 day the third house and so on.
i
Thus the tenth house is completed on 100 day. This process is
L,-Latesttime ofevent called as Rate of construction.
-Time of activity (./).
estimate