You are on page 1of 22

MUKHYA MANTRI GRAM SADAK YOJANA - 2

(Maharashtra Rural Road Development Association)


Year 2022-23 (R&D)
Name of Road :- Upgradation & Maintenance of Adhalgaon-Tandali Dumala To Takali Lonar Road (KM 0/000-9/900) (TR-03, ODR-135)
R.D. From km. :- 0/000-8/620, 8/620-9/900
Length in km. :- 9.9
Block :- Shrigonda
District :-Ahmednagar
RATE ANALYSIS FOR ROAD WORKS
R.A. No.1

Loading & Unloading Charges Rate with


Haulage
Loading Total
Material Unit Wt. In Unloading ,Loading
Basic Charges By Total Total Haulage
Sr. Required Wt. Tonne Charges By Lead &
Particulars of item Rate Mechanical Loading Unloading Charges = Total Rate Final Rate Unit
No. in Cum. per (Col.5 x 6) Mechanical in Km. Unloading
of Item & Manual Charges Charges Col.(6 x
Cum 1000 & Manual Charges
Means per Col.(4 x 7) Col (4 x 9) 11 x 11)
Means Col.(=3+8+
cum 10+12)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 17 18
1 Clearing and grubbing road land including
uprooting wild vegetation, grass, bushes,
shrubs, saplings and trees of girth upto
300 mm, removal of stumps of such trees
cut earlier and disposal of unserviceable
materials and stacking of serviceable
material to be used or auctioned, upto a
lead of 1000 m including removal and
disposal of top organic soil not exceeding
150 mm in thickness as per Technical
Specification Clause 201

2.2 By Mechanical Means


i) (A) In Area of Non-thorny jungle
(SOR Item No.2.2 /II/ A / page no. 5) 29,447.91 29447.9 29,447.91 Hectare
ii) (B) In Area of thorny jungle
(SOR Item No.2.2 /II/ B / page no. 5) 36,254.12 36254.1 36,254.12 Hectare
Loading & Unloading Charges Rate with
Haulage
Loading Total
Material Unit Wt. In Unloading ,Loading
Basic Charges By Total Total Haulage
Sr. Required Wt. Tonne Charges By Lead &
Particulars of item Rate Charges = Total Rate Final Rate Unit
No. in Cum. per (Col.5 x 6) Mechanical Loading Mechanical
Unloading in Km. Unloading
of Item & Manual Charges Charges Col.(6 x
Cum 1000 & Manual Charges
Means per Col.(4 x 7) Col (4 x 9) 11 x 11)
Means Col.(=3+8+
cum 10+12)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 17 18
2 Excavation for roadwork in soil with
hydraulic excavator of 0.9 cum bucket
capacity including cutting and loading in
tippers, trimming bottom and side slopes,
in accordance with requirements of lines,
grades and cross-sections, and
transporting to the embankment location
with a lift upto 1.5 m and lead upto 1000
m as per Technical Specification Clause
302.3
(SOR Item No. 3.5 / iii / page no.14) 55.99 55.99 55.99 Cum.
3 Excavation for roadway in ordinary rock
with hydraulic excavator of 0.9 cum
bucket capacity including cutting and
loading in tippers, transporting to
embankment site with a lift upto 1.5 m
and lead upto 1000 m, trimming bottom
and side slopes in accordance with
requirements of lines, grades and cross-
sections as per Technical Specification
Clause 302.3.5
(SOR Item No. 3.8 / iii / page no.15) 85.75 85.75 85.75 Cum.
4 Construction of embankment with
approved materials deposited at site from
roadway cutting and excavation from
drain and foundation of other structures
graded and compacted to meet
requirement of Tables 300.1 and 300.2 as
per Technical Specification Clause 301.5

(SOR Item No. 3.3 / page no.14) 72.16 72.16 72.16 Cum.
Loading & Unloading Charges Rate with
Haulage
Loading Total
Material Unit Wt. In Unloading ,Loading
Basic Charges By Total Total Haulage
Sr. Required Wt. Tonne Charges By Lead &
Particulars of item Rate Charges = Total Rate Final Rate Unit
No. in Cum. per (Col.5 x 6) Mechanical Loading Mechanical
Unloading in Km. Unloading
of Item & Manual Charges Charges Col.(6 x
Cum 1000 & Manual Charges
Means per Col.(4 x 7) Col (4 x 9) 11 x 11)
Means Col.(=3+8+
cum 10+12)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 17 18
5 Construction of embankment with
approved material obtained from borrow
pits with a lift upto 1.5 m, transporting to
site, spreading, grading to required slope
and compacting to meet requirement of
Tables 300.1 and 300.2 as per Technical
Specification Clause 301.5

(SOR Item No. 3.4 page no.14)


material As per MORD spe.no. 401(A)/ ii
A) For lead above 250 m. 377.08 1 1600 1.6 377.08 377.08 Cum.
B) For lead upto 250 m. 384.00 1 1600 1.6 384.00 384.00 Cum.

6 Scarifying the existing bituminous road 12.67 12.67 12.67 Sqm.


surface to a depth of 150 mm and disposal
of scarified material with a lift upto 3 m
and lead upto 1000 m as per Technical
Specification Clause 301.4.
(SOR Item No. 3.2 / page no.13)

7 Construction of granular sub-base by


providing well graded material, spreading
in uniform layers with motor grader on
prepared surface, mixing by mix in place
method with rotavator at OMC, and
compacting with smooth wheel roller to
achieve the desired density, complete as
per Technical Specification Clause 401.( A )
By Mix in Place Method

(SOR Item No. 4.1 / A / ii / page no.19) 1,612.56


By Mix in Place Method
Aggregates
Well graded granular sub-base material as per Table 400.1 1.20000 1750 2.10000 54.54 65.45 12.60 15.12 10.00 125.58
Loading & Unloading Charges Rate with
Haulage
Loading Total
Material Unit Wt. In Unloading ,Loading
Basic Charges By Total Total Haulage
Sr. Required Wt. Tonne Charges By Lead &
Particulars of item Rate Charges = Total Rate Final Rate Unit
No. in Cum. per (Col.5 x 6) Mechanical Loading Mechanical
Unloading in Km. Unloading
of Item & Manual Charges Charges Col.(6 x
Cum 1000 & Manual Charges
Means per Col.(4 x 7) Col (4 x 9) 11 x 11)
Means Col.(=3+8+
cum 10+12)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 17 18
Total 65.45 15.12 Total 125.58 1818.71 1818.71 1,818.71 Cum.

8 Providing, laying, spreading and


compacting stone aggregates of specific
sizes to water bound macadam
specification including spreading in
uniform thickness, hand packing, rolling
with three wheel 80-100 kN static roller in
stages to proper grade and camber,
applying and brooming, crushable
screening to fill-up the interstices of
coarse aggregate, watering and
compacting to the required density
Grading 2 as per Technical Specification
Clause 405. By Mechanical Means
(SOR Item No. 4.8 / 2 / B / page no.23) 1,660.52
Crushable Screening
Grade II material As per MORD
specification no. 405(2)
Grading 2 63 mm to 45 mm @ 0.91 cum 1.21000 1750 2.11750 54.54 65.99 12.60 15.25 10.00 126.63
per 10 sqm for compacted thickness of 75
Binding Material
Crushable type such as Moorum or gravel for 14.98
0.30000 1670 0.50100 28.91 8.67 12.60 3.78 5.00
Grading 2 @ 0.22 cum per 10 sqm
Total 74.66 19.03 Total 141.6 1895.82 1895.82 1,895.82 Cum.

9 Wet Mix Macadam


Loading & Unloading Charges Rate with
Haulage
Loading Total
Material Unit Wt. In Unloading ,Loading
Basic Charges By Total Total Haulage
Sr. Required Wt. Tonne Charges By Lead &
Particulars of item Rate Charges = Total Rate Final Rate Unit
No. in Cum. per (Col.5 x 6) Mechanical Loading Mechanical
Unloading in Km. Unloading
of Item & Manual Charges Charges Col.(6 x
Cum 1000 & Manual Charges
Means per Col.(4 x 7) Col (4 x 9) 11 x 11)
Means Col.(=3+8+
cum 10+12)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 17 18
Providing, laying, spreading and 1,745.50
compacting graded stone aggregate to
wet mix macadam specification including
premixing the material with water at
OMC in mechanical mixer (Pug Mill),
carriage of mixed material by tipper to
site, laying in uniform layers in sub-
base/base course on a well prepared sub-
base and compacting with smooth wheel
roller of 80 to 100kN weight to achieve the
desired density including lighting,
barricading and maintenance of diversion,
etc as per Tables 400.11 & 400.12 and
Technical Specification Clause 406.

(SOR Item No. 4.9 Page no.24)


Grade II material As per MORD specification no. 405
Coarse Aggregate -45 to 22.4 mm @ 30 percent 0.40 1750 0.70000 54.54 21.82 12.60 5.04 10.00 41.86
Aggregates22.4 to 2.36 mm @ 40 percent 0.53 1750 0.92750 54.54 28.91 12.60 6.68 10.00 55.46
Fine Aggregates/Crushed sand 2.36 mm to 75
0.40 1750 0.70000 54.54 21.82 12.60 5.04 10.00 41.86
micron @ 30 percent
Total 72.55 16.76 Total 139.18 1973.99 1973.99 1,973.99 Cum.

9 Construction of subgrade and earthen


shoulders with approved material
obtained from borrow pits with all lifts
and leads, transporting to site, spreading,
grading to required slope and compacted
to meet requirement of Table 300.2 with
lead upto 1000 m as per Technical
Specification Clause 303.1.

(SOR item NO.3.14 / page no.16) 367.62


Loading & Unloading Charges Rate with
Haulage
Loading Total
Material Unit Wt. In Unloading ,Loading
Basic Charges By Total Total Haulage
Sr. Required Wt. Tonne Charges By Lead &
Particulars of item Rate Charges = Total Rate Final Rate Unit
No. in Cum. per (Col.5 x 6) Mechanical Loading Mechanical
Unloading in Km. Unloading
of Item & Manual Charges Charges Col.(6 x
Cum 1000 & Manual Charges
Means per Col.(4 x 7) Col (4 x 9) 11 x 11)
Means Col.(=3+8+
cum 10+12)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 17 18
I) Using Earth taken from private land
1.00000 1600 1.60000 367.62 367.62 367.62 Cum.

10 Providing and constructing 50 mm. thick


Modified Penetration Macadam (MPM)
road surface including all mataerials,
preparing the existing road surface,
spreading 40mm. stone metal layers 100%
crusher broken metal with conical crusher
plant heating and spraying the bitumen of
specified grade @ 1.75 kg/sqm, spreading
12mm.size chips compacting with static
(A) roller
50 mmhaving
thick weight 8 to 10 MT. to achive
(I) Bitumen (S-65)
PWD SSR (22-23) I. No. 3.37b Pg. No. 32 218.00
Material As per MORD specification no.
Bitumen @ 1.75 Kg./ Sqm. 1.75000 1 0.00175 257.00 4.50
40 mm.Size Crushed Metal @ 0.06 Cum. 0.06000
Lead Charges =345.15 For 10 km
Per Sqm.
100% Crush metal = 0.06000 1750 0.10500 54.54 3.27 12.60 0.76 10.00 20.71
12 mm. Size Stone chips @ 0.018 Cum. / Sqm. 0.01800 1750 0.03150 54.54 0.98 12.60 0.23 10.00 6.21
Total 4.25 0.98 31.42 249.42
Add for difference cost of Bitumen on Dt. 16/06/2023
(Rate on Dt. 16/06/2023 = 42920 - Rate of SOR on Dt. PWD SSR 2022-23 = 49862) = 0.00175 x -6942 = -12.15
Total = 237.27 237.27 237.27 Sqm.
Loading & Unloading Charges Rate with
Haulage
Loading Total
Material Unit Wt. In Unloading ,Loading
Basic Charges By Total Total Haulage
Sr. Required Wt. Tonne Charges By Lead &
Particulars of item Rate Charges = Total Rate Final Rate Unit
No. in Cum. per (Col.5 x 6) Mechanical Loading Mechanical
Unloading in Km. Unloading
of Item & Manual Charges Charges Col.(6 x
Cum 1000 & Manual Charges
Means per Col.(4 x 7) Col (4 x 9) 11 x 11)
Means Col.(=3+8+
cum 10+12)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 17 18
13 Providing and laying bituminous macadam
with hot mix plant using crushed
aggregates of grading as per Table 500.4
premixed with bituminous binder,
transported to site upto a lead of 1000 m
laid over a previously prepared surface
with paver finisher to the required grade
level and alignment and rolled to achieve
the desire compaction as per Technical
Specification 504.(with 3.30% of bitumen
by weight of mix)

(B) 50 mm thick
(I) Bitumen (S-65)
(SOR Item No. 5.3 page no.27) 7,143.52
Material As per MORD specification no.
Bitumen @ 3.3 per cent of mix 72.439 1 0.07244 257.00 111.33
40 mm.Crushed Metal @ 0.09 Cum. Per
1.41512
Sqm.

100 % Crush metal = 1.41512 1750 2.47646 54.54 77.18 12.60 17.83 10.00 148.09

Total 77.18 17.83 259.42 7,497.95


Add for difference cost of Bitumen on Dt. 01/09/2018
(Rate on Dt. 16/06/2023 = 42920 - Rate of SOR on Dt. 15/06/2022 = 52920) = 0.072439 x 6220 = 450.57
Total = 7,948.52 7948.52 7,948.52 Cum
11 Tack Coat above MPM-Providing and
applying tack coat with Bitumen emulsion
(RS-1) using emulsion distributor at the
rate of 0.25 to 0.30 kg per sqm on the
prepared dry and hungry bituminous
surface cleaned with Hydraulic broom as
per Technical Specification Clause 503.
Loading & Unloading Charges Rate with
Haulage
Loading Total
Material Unit Wt. In Unloading ,Loading
Basic Charges By Total Total Haulage
Sr. Required Wt. Tonne Charges By Lead &
Particulars of item Rate Charges = Total Rate Final Rate Unit
No. in Cum. per (Col.5 x 6) Mechanical Loading Mechanical
Unloading in Km. Unloading
of Item & Manual Charges Charges Col.(6 x
Cum 1000 & Manual Charges
Means per Col.(4 x 7) Col (4 x 9) 11 x 11)
Means Col.(=3+8+
cum 10+12)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 17 18
(SOR Item No. 5.2 / ii / page no.25) 13.36
Material As per MORD specification no. 503
Bitumen emulsion (RS-1) @ 0.275 Kg. Per
0.275 1 0.00028 257.0 0.42 13.78
Sqm.
Add for difference cost of Bitumen on Dt. 16/06/2023
(Rate on Dt. 16/06/2023 = 37626 - Rate of SOR on Dt. 15/06/2022 = 36906) = 0.000275 x 720 = 0.2
Total = 13.98 13.98 13.98 Sqm.
12 Providing, laying and rolling of open-
graded premix carpet of 20 mm thickness
composed of 13.2 mm to 5.6 mm
aggregates either using penetration grade
bitumen or emulsion to required line,
grade and level to serve as wearing course
on a previously prepared base, including
mixing in a suitable plant, laying and
rolling with a three wheel 80-100 kN static
roller capacity, finished to required level
and grades to be followed by seal coat of
either Type A or Type B or Type C as per
Technical Specification Clause 508.

Case - II By Mechanical Means


(II) (II) Bitumen (S-65) VG 30 using Waste Plastic
(SOR Item No. 5.9/ II /RA/ page no 30) 144.97
Material As per MORD spe no. 508 1.46
Waste Plastic 8% 0.1168
Bitumen S-65 @ 14.60 Kg./10 Sqm. 1.3432 1 0.00134 257.0 2.06
Crushed stone chipping ,11.2 mm. 0.02700 1750 0.04725 54.54 1.47 12.60 0.34 10.00 2.83
To 0.09 mm. @ 0.27 cum/10 sqm. TOTAL 1.47 0.34 4.890 151.67
Add for difference cost of Bitumen on Dt. 16/06/2023
(Rate on Dt. 16/06/2023 = 42920 - Rate of SOR on Dt. 15/06/2022 = 52920) = 0.0013432 x -10000 = -13.43
Total = 138.24 138.24 138.24 Sqm.
Loading & Unloading Charges Rate with
Haulage
Loading Total
Material Unit Wt. In Unloading ,Loading
Basic Charges By Total Total Haulage
Sr. Required Wt. Tonne Charges By Lead &
Particulars of item Rate Charges = Total Rate Final Rate Unit
No. in Cum. per (Col.5 x 6) Mechanical Loading Mechanical
Unloading in Km. Unloading
of Item & Manual Charges Charges Col.(6 x
Cum 1000 & Manual Charges
Means per Col.(4 x 7) Col (4 x 9) 11 x 11)
Means Col.(=3+8+
cum 10+12)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 17 18
13 Providing and laying seal coat sealing the
voids in a bituminous surface laid to the
specified levels, grade and cross fall using
Type A, Type B and Type C as per Technical
Specification Clause 510
B By Mechanical Means
Case - I : Type A
(I) Bitumen (S-65) VG-30
(SOR Item No. 5.12/ B/Type A / II/ page 74.00
no.33)
Material per Cum. As per MORD specification
no. 510
Bitumen(S-90) @ 9.80 Kg./ 10 Sqm. 0.98000 1 0.00098 257 1.51
Crushed stone chipping ,6.7 mm. Size 100 % passing
0.00900 1750 0.01575 54.54 0.49 12.60 0.11 10 0.94
11.2 mm. Sieve and retained on 2.36 mm. Seive
applied @ 0.09 cum./ 10 sqm. TOTAL 0.49 0.11 2.45 77.05
Add for difference cost of Bitumen on Dt. 16/06/2023
(Rate on Dt. 16/06/2023 = 42920 - Rate of SOR on Dt. 15/06/2022 = 52920) = 0.00098 x -10000 = -9.8
Total = 67.25 67.25 67.25 Sqm.
14 Reinforced cement concrete M15 grade
kilometre stone/local stone of standard
design as per IRC:8 fixing in position
including painting and printing, etc as per
drawing and Technical Specification
Clause 1703
Material per Cum. As per MORD specification
no. 1700
i) 5th Kilometre Stone (precast)
Quantity for 6 nos.
(SOR Item No. 10.10/ i / page no.51 ) 4,305.06 4,305.06 4305.06 4,305.06 Each
ii) Ordinary Kilometer Stone (Precast)
(SOR Item No. 10.10 / ii / page no.51 ) 2,528.07 2,528.07 2528.07 2,528.07 Each
iii) 200 m stone (precast)
(SOR Item No. 10.10 / iii / page no.51 ) 524.16 524.16 524.16 524.16 Each
Loading & Unloading Charges Rate with
Haulage
Loading Total
Material Unit Wt. In Unloading ,Loading
Basic Charges By Total Total Haulage
Sr. Required Wt. Tonne Charges By Lead &
Particulars of item Rate Charges = Total Rate Final Rate Unit
No. in Cum. per (Col.5 x 6) Mechanical Loading Mechanical
Unloading in Km. Unloading
of Item & Manual Charges Charges Col.(6 x
Cum 1000 & Manual Charges
Means per Col.(4 x 7) Col (4 x 9) 11 x 11)
Means Col.(=3+8+
cum 10+12)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 17 18

15 Providing and fixing trap/ granite/


quartzite/ gneiss guard stone/ indicator
stones/ boundary stones of standard size
and shape including fixing in block of____
standard size with white washing
etc.complete
(PWD SSR (2019-20) Item No. 6.01 / b 203.00
page no.59) 0.00 203.00 203.00 Number

16 MMGSY / PMGSY Citizen' s information


Board- Providing and fixing of typical PMGSY
Retro Reflective information board as per as
per section1700 of MORD specifications and
latest PMGSY Signage Manual / Circuler and
drawing.Two ACP (Aluminum Composite
Panel) sheets of 4 mm thick, of 900 mm x
750mm size fixed at top & bottom duly
rivetted with MS angles of 35 x 35 x 5 mm
thick M.S angle shall be welded by two
vertical M.S angle of 5 mm thick to 75 mm x
75 mm of 12 SWG square tubes / 75mm Dia
Pipe posts duly embedded in cement
concrete M-20 grade blocks of 600mm x
600mm x 75mm, below ground level.
MMGSY / PMGSY logo, letters and numerals
on the ACP should be made up of Retro
Reflective sheeting of Class-A / Class-B grade
as per the latest MORD section 1700
specifications (Refer Circuler no. NRRDA-
P013(11)/3/2019-Dir (Tech) dated
02.12.2019). Printing PMGSY Logo/MMGSY
Logo/Project description on Class A or Class
B type retro reflective sheeting using
modern technology printing platform. The
Loading & Unloading Charges Rate with
Haulage
Loading Total
Material Unit Wt. In Unloading ,Loading
Basic Charges By Total Total Haulage
Sr. Required Wt. Tonne Charges By Lead &
Particulars of item Rate Charges = Total Rate Final Rate Unit
No. in Cum. per (Col.5 x 6) Mechanical Loading Mechanical
Unloading in Km. Unloading
of Item & Manual Charges Charges Col.(6 x
Cum 1000 & Manual Charges
Means per Col.(4 x 7) Col (4 x 9) 11 x 11)
Means Col.(=3+8+
cum 10+12)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 17 18
(MMGSY SOR Item No. 10.16 (A)/A page 28,401 28,401.0 28,401.0 28,401.0 Each

17 MMGSY / PMGSY Maintenance


Information Board- Providing and fixing of
typical MMGSY / PMGSY Retro Reflective
information board as per section 1700 of
MORD specifications and latest PMGSY
Signage Manual / Circuler and
drawing.The ACP sheets of 3 mm thick, of
1500mmx900 mm size duly rivetted with
MS angles of 25 x 25 x 5 mm thick M.S
angle. Riveting of all the sheets over angle
and flat iron frame will be done neatly to
have plain surface on one side. The angle
iron frame of the plate will be welded to
two nos. 75mm x75mm (12 SWG) sheet
tubes posts placed at 1125mm apart
centre to centre. These two posts will be
embeded in cement concrete M15 grade
block of 600x600x750mm below ground
level. The height of the bottom of the
plate will be 775mm from normal ground
level. MMGSY / PMGSY logo, letters and
numerals on the ACP should be made up
of Retro Reflective sheeting of Class-A /
Class-B grade as per the latest MORD
section 1700 specifications (Refer Circuler
no. NRRDA-P013(11)/3/2019-Dir (Tech)
dated
02.12.201
(MMGSY SOR Item No. 10.23/A page 18,200.00 18,200.0 18,200.0 18,200.0 Each
no.40)
Loading & Unloading Charges Rate with
Haulage
Loading Total
Material Unit Wt. In Unloading ,Loading
Basic Charges By Total Total Haulage
Sr. Required Wt. Tonne Charges By Lead &
Particulars of item Rate Charges = Total Rate Final Rate Unit
No. in Cum. per (Col.5 x 6) Mechanical Loading Mechanical
Unloading in Km. Unloading
of Item & Manual Charges Charges Col.(6 x
Cum 1000 & Manual Charges
Means per Col.(4 x 7) Col (4 x 9) 11 x 11)
Means Col.(=3+8+
cum 10+12)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 17 18
18 Providing and fixing Retro Reflective MMGSY
/ PMGSY LOGO informatory sign board with
Logo as per section1700 of MORD
specifications and latest PMGSY Signage
Manual / Circuler and drawing. The board
will be a composite unit consisting of Two
Plates of ACP (Aluminum Composite Panel),
material specifications as per clause 17001.3.
The top most plate will be of 3mm ACP in
diamond shape of 600x600mm size, riveted
with MS angle iron frame of
25mmx25mmx5mm size on back on edges.
The Lower plate will be of 4mm ACP of
1100x300mm size riveted with MS angle iron
frame of 25mmx25mmx5mm size on back on
edges. Riveting of all the sheets over angle
and flat iron frame will be done neatly to
have plain surface on one side. The angle
iron frame of Both the plates will be welded
to a 75mm x75mmx 12swg Mild steel post at
/ Tube Centre and this post will be embeded
in cement concrete M15 grade block of
450x450x600mm below ground level. The
height of the bottom of the lower plate will
be 1200mm from normal ground level. The
spa

( MMGSY SOR Item No. 10.16 /A/ page 14,084.00 14,084.0 14,084.0 14,084.00 Each
Loading & Unloading Charges Rate with
Haulage
Loading Total
Material Unit Wt. In Unloading ,Loading
Basic Charges By Total Total Haulage
Sr. Required Wt. Tonne Charges By Lead &
Particulars of item Rate Charges = Total Rate Final Rate Unit
No. in Cum. per (Col.5 x 6) Mechanical Loading Mechanical
Unloading in Km. Unloading
of Item & Manual Charges Charges Col.(6 x
Cum 1000 & Manual Charges
Means per Col.(4 x 7) Col (4 x 9) 11 x 11)
Means Col.(=3+8+
cum 10+12)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 17 18
19 Providing and Fixing of Retro Reflectorised
direction & place identification sign boards
made out of retro reflective sheeting of High
Intensity prismatic grade conforming to IRC-
67: 2012 & Type IV standards of ASTM
D4956-09 specifications, fixed over 4 mm
thick ACP sheet supported with Back support
frame of 35x35x5mm mild steel angle with
areas not exceeding 0.9 sqm. Supported in
mild steel angle iron post 75x75x6mm - 3.5
mtr height ,firmly fixed to the grounf by
means of properly designed foundation of M
20 grade cement concrete 45 cm X 45 cm X
60 cm , 60 cm below ground level complete
(as per MoRT&H specification No.801) (for
area Less than 0.9 sqm). 7Both border &
background shall be retro reflective as per
Type IV standards. 7 years Warranty for
Retro Reflective Sheeting from the original
sheeting manufacturer & a certified copy of
three years outdoor exposure report from an
independent test lab for the product offered
shall be submitted by the contractor(Bottom
of the board shall be at least 2.6 mtr.
ab

(MMGSY SOR Item No. 10.3 / B /page 8,627.00 8,627.0 8,627.0 8,627.00 Sqm.
Loading & Unloading Charges Rate with
Haulage
Loading Total
Material Unit Wt. In Unloading ,Loading
Basic Charges By Total Total Haulage
Sr. Required Wt. Tonne Charges By Lead &
Particulars of item Rate Charges = Total Rate Final Rate Unit
No. in Cum. per (Col.5 x 6) Mechanical Loading Mechanical
Unloading in Km. Unloading
of Item & Manual Charges Charges Col.(6 x
Cum 1000 & Manual Charges
Means per Col.(4 x 7) Col (4 x 9) 11 x 11)
Means Col.(=3+8+
cum 10+12)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 17 18
20 Providing and Fixing of Retro Reflectorised
900mm Cautionary sign boards made out
of retro reflective sheeting of High
Intensity prismatic grade conforming to
IRC-67: 2012 & Type IV standards of ASTM
D4956-09 specifications, fixed over 4mm
thick ACP sheet supported with Back
support frame of 25x25x3mm mild steel
angle as approved , supported on a mild
steel angle iron post 65 mm X 65 mm X 6
mm - 3.5 mtr height, firmly fixed to the
Semi Reflective Traffic signs
i) 600mm equilateral triangle
(MMGSY SOR Item No. 10.2 / ii / page 3,819.00 3,819.0 3,819.0 3,819.0 Each
ii) 600mm x 450mm rectangular
(MMGSY SOR Item No. 10.2 / v / page 4,295.00 4,295.0 4,295.0 4,295.0 Each
iii 600mm x 600mm Square
(MMGSY SOR Item No. 10.2 / vi / page 4,711.00 4,711.0 4,711.0 4,711.0 Each

21 Road Delineators: Supplying and


installation of delineators (Roadway
Indicators, Hazard markers, Object
markers) 80 to 100 cm high above ground
level, painted black and white in 15 cm
wide strips, fitted with 80x100mm
rectangular or 75mm dia. Circular
reflectorised panels at the top, buried or
pressed into the ground and confirming to
I.R.C. 79 and the drawings.

PWD SSR (22-23) I. No. 6.15 Pg. No. 50 822.00 822.0 822.0 822.00 Number
Loading & Unloading Charges Rate with
Haulage
Loading Total
Material Unit Wt. In Unloading ,Loading
Basic Charges By Total Total Haulage
Sr. Required Wt. Tonne Charges By Lead &
Particulars of item Rate Charges = Total Rate Final Rate Unit
No. in Cum. per (Col.5 x 6) Mechanical Loading Mechanical
Unloading in Km. Unloading
of Item & Manual Charges Charges Col.(6 x
Cum 1000 & Manual Charges
Means per Col.(4 x 7) Col (4 x 9) 11 x 11)
Means Col.(=3+8+
cum 10+12)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 17 18
22 Painting lines, dashes, arrows, etc. on
roads in two coats on new work with
ready mixed road marking paint
conforming to IS:164 on
bituminous/concrete surface, including
cleaning the surface of all dirt, dust and
other foreign matter, demarcation at site
and traffic control as per drawing and
Technical Specification Clause 1702
( SOR Item No. 10.8 / page no.51) 197.92 197.9 197.92 197.92 Sqm.

23 Metal Beam Crash Barrier -- Type - A, W :


Metal Beam Crash Barrier (Providing and
erecting a W metal beam crash barrier
comprising of 3 mm thick corrugated
sheet metal beam rail, 70 cm above
road/ground level, fixed on ISMC series
channel vertical post, 150 x 75 x 5 mm
spaced 2 m centre to centre, 1.8 m high,
1.1 m below ground/road level, all steel
parts and fitments to be galvanised by hot
dip process, all fittings to conform to
IS:1367 and IS:1364, metal beam rail to be
fixed on the vertical post with a spacer of
channel section 150 x 75 x 5 mm, 330 mm
long complete as per clause 810)""

PWD SSR (22-23) I. No. 7.30b Pg. No. 73 4,912.00 4,912.0 4,912.0 4,912.0 Rmt.

24 Plastic Moulded Cat Eye Stud


Loading & Unloading Charges Rate with
Haulage
Loading Total
Material Unit Wt. In Unloading ,Loading
Basic Charges By Total Total Haulage
Sr. Required Wt. Tonne Charges By Lead &
Particulars of item Rate Charges = Total Rate Final Rate Unit
No. in Cum. per (Col.5 x 6) Mechanical Loading Mechanical
Unloading in Km. Unloading
of Item & Manual Charges Charges Col.(6 x
Cum 1000 & Manual Charges
Means per Col.(4 x 7) Col (4 x 9) 11 x 11)
Means Col.(=3+8+
cum 10+12)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 17 18
Supplying and Fixing of Molded Shank
Raised Pavement Markers / Cat's Eye
made of polycarbonate and ABS moulded
body and reflective panels with micro
prismatic lens capable of providing total
internal reflection of the light entering the
lens face and shall support a load of 16000
kg tested in accordance to ASTM D 4280
Type H and complying to Specifications of
Category A of MORTH Circular No
RW/NH/33023/10-97 DO III Dt 11.06.
PWD SSR (22-23) I. No. 6.09 Pg. No. 47 366.00 366.00 366.00 366.00 Number

Deputy Engineer Executive Engineer


P.M.G.S.Y. P.M.G.S.Y.
M.R.R.D.A. Ahmednagar M.R.R.D.A. Ahmednagar
MUKHYA MANTRI GRAM SADAK YOJANA - 2
(Maharashtra Rural Road Development Association)
Year 2022-23 (R&D)
Name of Road :- Upgradation & Maintenance of Adhalgaon-Tandali Dumala To Takali Lonar Road (KM 0/000-9/900) (TR-03, ODR-135)
R.D. From km. :- 0/000-8/620, 8/620-9/900 Block :- Shrigonda
Length in km. :- 9.9 District :- Ahmednagar
RATE ANALYSIS FOR C.D.WORKS
R.A. No. 2
Basic Loading & Unloading Charges Rate with
Rate Loading Total Haulage
Material Unit Wt. In Unloading
of Item Charges By Total Total Haulage ,Loading &
Sr. Required Wt. Tonne Charges By Lead
Particulars of item Mechanical Loading Unloading Charges Unloading Total Rate Final Rate Unit
No. in Cum. per (Col.5 x 6) Mechanical in Km.
& Manual Charges Charges = Col.(6 x Charges
Cum 1000 & Manual
Means per Col.(4 x 7) Col (4 x 9) 11 x 11) Col.(=3+8+10
Means +12)
cum
1 2 3 4 5 6 7 8 9 10 11 12 13 14 18 19
1 Earthwork in excavation for structures
as per drawing and technical
specifications Clause 305.1 including
setting out, construction of shoring
and bracing, removal of stumps and
other deleterious material and disposal
upto a lead of 50 m, dressing of sides
and bottom and backfilling in trenches
with excavated suitable material.

1. Ordinary soil up to 3.00 m. depth


by Manual means
(SOR Item no.11.1 / I / i page no.53) 532.33 532.33 532.33 Cum.
2. Ordinary Rock (not requiring
blasting) up to 3.0 m. depth
(SOR Item no.11.1 / II / page no. 53) 665.42 665.42 665.42 Cum.

2 Providing concrete for plain/reinforced 5,043.79


concrete in open foundations
complete as per drawings and
technical specifications Clause 802,
803, 1202 & 1203
Basic Loading & Unloading Charges Rate with
Rate Loading Total Haulage
Material Unit Wt. In Unloading
of Item Charges By Total Total Haulage ,Loading &
Sr. Required Wt. Tonne Charges By Lead
Particulars of item Mechanical Loading Unloading Charges Unloading Total Rate Final Rate Unit
No. in Cum. per (Col.5 x 6) Mechanical in Km.
& Manual Charges Charges = Col.(6 x Charges
Cum 1000 & Manual
Means per Col.(4 x 7) Col (4 x 9) 11 x 11) Col.(=3+8+10
Means +12)
cum
1 2 3 4 5 6 7 8 9 10 11 12 13 14 18 19
(SOR Item no.11.4 / I / i / page no. 54)

P.C.C. M-10
Cement 0.25000 175.19 43.80 175.19 43.80 6.00 8.97
Coarse Sand 0.48000 1600 0.76800 28.91 13.88 12.60 6.05 10.00 45.93
40 mm. Aggregate 0.57600 1750 1.00800 54.54 31.42 12.60 7.26 10.00 60.28
20 mm. Aggregate 0.28800 1750 0.50400 54.54 15.71 12.60 3.63 10.00 30.14
10 mm. Aggregate 0.09600 1750 0.16800 54.54 5.24 12.60 1.21 10.00 10.05
Total 110.05 61.94 155.37 5,371.15
5,371.15 5371.15 5,371.15 Cum.

3 Providing and laying reinforced cement


concrete pipe NP3 for culverts on first
class bedding of granular material in
single row including fixing collar with
cement mortar 1:2 but excluding
excavation, protection works,
backfilling, concrete and masonry
works in head walls and parapets
Clause 1106.

B 1000 mm. Dia. NP 3


(SOR Item no.9.3 / B / page no. 34) 7,069.25 7,069.25 7069.25 7,069.25 Rmt

D 600 mm. Dia. NP 3


PWD SSR (22-23) I. No. 11.14 Pg. No. 82 4,792.00 4,792.00 4792.00 4,792.00 Rmt

D 600 mm. Dia. NP 2


PWD SSR (22-23) I. No. 11.09 Pg. No. 81 2,733.00 2,733.00 2733.00 2,733.00 Rmt
Basic Loading & Unloading Charges Rate with
Rate Loading Total Haulage
Material Unit Wt. In Unloading
of Item Charges By Total Total Haulage ,Loading &
Sr. Required Wt. Tonne Charges By Lead
Particulars of item Mechanical Loading Unloading Charges Unloading Total Rate Final Rate Unit
No. in Cum. per (Col.5 x 6) Mechanical in Km.
& Manual Charges Charges = Col.(6 x Charges
Cum 1000 & Manual
Means per Col.(4 x 7) Col (4 x 9) 11 x 11) Col.(=3+8+10
Means +12)
cum
1 2 3 4 5 6 7 8 9 10 11 12 13 14 18 19
4 Plain/reinforced cement concrete in 5,433.14
substructure complete as per drawings
and technical specification Clauses
802, 804, 805, 806, 807, 1202 ans 1204

P.C.C. grade M 15
(SOR Item no.12.5 / I / i / page no. 56)
material as per MORD specification no. 800
Cement 0.275 175.19 48.18 175.19 48.18 6.00 9.87
Coarse Sand 0.48 1600 0.768 28.91 13.88 12.60 6.05 10.00 45.93
40 mm. Aggregate 0.48 1750 0.840 54.54 26.18 12.60 6.05 10.00 50.23
20 mm. Aggregate 0.24 1750 0.420 54.54 13.09 12.60 3.02 10.00 25.12
10 mm. Aggregate 0.08 1750 0.140 54.54 4.36 12.60 1.01 10.00 8.37
TOTAL 105.69 64.31 139.52 5,742.66
5,742.66 5742.66 5,742.66 Cum.

5 Painting two coats including primer


coat after filling the surface with
synthetic enamel paint in all shades on
new, plastered / concrete surfaces as
per drawing and Technical
Specification Clause 1701
(SOR Item no.10.5 / page no.37) 143.70 143.70 143.70 143.70 Sqm.

6 Printing new letter and figures of any


shade with synthetic enamel paint
black or any other approved colour to
give an even shade as per drawings
and Technical Specification Clause 1701

II) English and Roman Per cm Ht.


(SOR Item no.10.1 / ii / page no.36) 0.86 0.86 0.86 0.86 per letter
Basic Loading & Unloading Charges Rate with
Rate Loading Total Haulage
Material Unit Wt. In Unloading
of Item Charges By Total Total Haulage ,Loading &
Sr. Required Wt. Tonne Charges By Lead
Particulars of item Mechanical Loading Unloading Charges Unloading Total Rate Final Rate Unit
No. in Cum. per (Col.5 x 6) Mechanical in Km.
& Manual Charges Charges = Col.(6 x Charges
Cum 1000 & Manual
Means per Col.(4 x 7) Col (4 x 9) 11 x 11) Col.(=3+8+10
Means +12)
cum
1 2 3 4 5 6 7 8 9 10 11 12 13 14 18 19
7 Dismantling of existing structures like
culverts, bridges, retaining walls and
other structure comprising of masonry,
cement concrete, wood work, steel
work, including T&P and scaffolding
wherever necessary, sorting the
dismantled material, disposal of
unserviceable material and stacking
the serviceable material with all lifts
and lead of 1000 m as per Technical
Specification Clause 202.

B) Cement Concrete
( SOR Item No. 2.5 / II/ A page no.8) 762.81 762.81 762.81 762.81 Cum.

8 Dismantling Stone Masonry as per


Technical Specification Clause 202
Rubble Stone Masonry in Cement
Mortar
( SOR Item No. 2.7/ B / page no.8) 484.30 484.30 484.30 484.30 Cum.
9 Removing of all types of Hume pipes
and stacking within lead of 1000 m.
( A ) Up to 600 mm. dia. Hume pipe
( SOR Item No. 2.13 / A / page no.10) 345.49 345.49 345.49 345.49 Rmt
( B ) Above 600 mm to 900 mm. dia.
Hume pipe
( SOR Item No. 2.13 / B / page no.10) 467.11 467.11 467.11 467.11 Rmt
( C ) Above 900 mm. dia. Hume pipe
( SOR Item No. 2.13 / C / page no.10) 799.82 799.82 799.82 799.82 Rmt
Basic Loading & Unloading Charges Rate with
Rate Loading Total Haulage
Material Unit Wt. In Unloading
of Item Charges By Total Total Haulage ,Loading &
Sr. Required Wt. Tonne Charges By Lead
Particulars of item Mechanical Loading Unloading Charges Unloading Total Rate Final Rate Unit
No. in Cum. per (Col.5 x 6) Mechanical in Km.
& Manual Charges Charges = Col.(6 x Charges
Cum 1000 & Manual
Means per Col.(4 x 7) Col (4 x 9) 11 x 11) Col.(=3+8+10
Means +12)
cum
1 2 3 4 5 6 7 8 9 10 11 12 13 14 18 19
10 Providing and constructing gabain
structures for erosion control, river
training works and protection works
with wire crates of size 2.0m x 1.0m x
0.30m each divided into 1 m
compartments by-cross netting, made
from 4 mm galvanized steel wire @
32Kilogramper 10 One Square Metre
having minimum tensile strength of
300Mpa conforming to IS:280 and
galvanizing coating conforming to IS
4826, wovan into mesh with double
twist, mesh size not exceeding 100 x
100mm, filled with boulders with least
dimension of 200mm, all loose ends to
be securely tied with 4mm galvanized
steel wire etc. complete.

PWD SSR (22-23) I. No. 14.83 Pg. No. 4,569.00 1.2 1750 0.000686 Lead Charges =422.26 For 10 km
Rubble 10.00 506.71
506.71 5,075.71 5075.71 5,075.71 Cum.
11 Maintenance of Hume pipe Culvert by
way of Clearing, Cleaning, Erosion
repair, repairs to cracks, parapet wall
and protection work as per drawing
and technical specification Clause 1908

(SOR Item no. 15.7/I page no.54) 1,854.56 One No.


1854.56 1854.56 1,854.56 Hume Pipe
Basic Loading & Unloading Charges Rate with
Rate Loading Total Haulage
Material Unit Wt. In Unloading
of Item Charges By Total Total Haulage ,Loading &
Sr. Required Wt. Tonne Charges By Lead
Particulars of item Mechanical Loading Unloading Charges Unloading Total Rate Final Rate Unit
No. in Cum. per (Col.5 x 6) Mechanical in Km.
& Manual Charges Charges = Col.(6 x Charges
Cum 1000 & Manual
Means per Col.(4 x 7) Col (4 x 9) 11 x 11) Col.(=3+8+10
Means +12)
cum
1 2 3 4 5 6 7 8 9 10 11 12 13 14 18 19
12 Maintenance of Causeway by way of
minor Surface repairs, replacing Guide
Posts, repair of flood gauges, removal
of debris, providing boulders and
protection work and painting as per
technical specification Clause 1909.

(SOR Item no. 15.8 page no.65) 94.15 94.15 94.15 94.15 m

Deputy Engineer . Executive Engineer


P.M.G.S.Y. . P.M.G.S.Y.
M.R.R.D.A. Ahmednagar . M.R.R.D.A. Ahmednagar