Professional Documents
Culture Documents
TSML/SCH/019
Revision No. 1
INTEGRATED MANAGEMENT SYSTEM ISO 9001 2015 ISO 14001 2015 ISO 45001 2018 Page No. 1
Division: Department: Supply Chain Section: Effective Date: 22.07.2023
Ste
Associated Requirements/ Responsibility Remarks /
p Activity(WHAT) Process / tools / PPEs (HOW)
Hazards/ Impacts (WHO) Reference
No.
Quality: Tools: N A.
NA
PPEs: Safety shoe, safety helmet, safety goggles,
Fluorescent jacket.
Ste
Associated Requirements/ Responsibility Remarks /
p Activity(WHAT) Process / tools / PPEs (HOW)
Hazards/ Impacts (WHO) Reference
No.
Ste
Associated Requirements/ Responsibility Remarks /
p Activity(WHAT) Process / tools / PPEs (HOW)
Hazards/ Impacts (WHO) Reference
No.
Impact :
Body Injury Tools: N A.
Fatality
Damage to Machinery PPEs: Safety shoe, safety helmet, safety goggles,
Fluorescent jacket.
Environment:
Air Pollution.
Water to be sprinkled as per water
Quality: sprinkling procedure.
NA
3 Placement of empty Safety & Health: Plot supervisor/ Process:
truck at loading point. khatadar After reaching the truck at the loading
Requirement: plot/stack the driver parked the truck at a
Shifting of loading labor to a safe place.
safe area. The khatadar get down from the truck with
Reversal of truck and placement the loading card and meet the plot in
at the right point charge for exact placement of the truck.
After getting instruction from the plot in
charge the khatadar access the surrounding
Hazard: area for presence of any loading labor and
Slip, trip, Fall truck etc.
Collision of truck with The khatadar evacuates the labor from the
machinery. site to a safe distance/place for safe
Truck may hit human
Prepared by Reviewed by Approved by
Name Md Matinul Hassan Name Ananga Kumar Mahanna Name Amit Choubey
Designation Manager Designation Assistant Divisional Manager Designation Assistant General Manager
Date 22.07.2023 Date 22.07.2023 Date 22.07.2023
FORM NO: CONFIDENTIAL – FOR INTERNAL USE ONLY
STANDARD OPERATING PROCEDURE FOR MANUAL LOADING OF CHROME ORE INTO TRUCKS SOP No. TSML/SCH/019
Revision No. 1
INTEGRATED MANAGEMENT SYSTEM ISO 9001 2015 ISO 14001 2015 ISO 45001 2018 Page No. 1
Division: Department: Supply Chain Section: Effective Date: 22.07.2023
Ste
Associated Requirements/ Responsibility Remarks /
p Activity(WHAT) Process / tools / PPEs (HOW)
Hazards/ Impacts (WHO) Reference
No.
Tools: NA
Ste
Associated Requirements/ Responsibility Remarks /
p Activity(WHAT) Process / tools / PPEs (HOW)
Hazards/ Impacts (WHO) Reference
No.
Tools:
Environment: Spade, Gamla, belcha and sidi (potable
Air Pollution. loading platform)
Prepared by Reviewed by Approved by
Name Md Matinul Hassan Name Ananga Kumar Mahanna Name Amit Choubey
Designation Manager Designation Assistant Divisional Manager Designation Assistant General Manager
Date 22.07.2023 Date 22.07.2023 Date 22.07.2023
FORM NO: CONFIDENTIAL – FOR INTERNAL USE ONLY
STANDARD OPERATING PROCEDURE FOR MANUAL LOADING OF CHROME ORE INTO TRUCKS SOP No. TSML/SCH/019
Revision No. 1
INTEGRATED MANAGEMENT SYSTEM ISO 9001 2015 ISO 14001 2015 ISO 45001 2018 Page No. 1
Division: Department: Supply Chain Section: Effective Date: 22.07.2023
Ste
Associated Requirements/ Responsibility Remarks /
p Activity(WHAT) Process / tools / PPEs (HOW)
Hazards/ Impacts (WHO) Reference
No.
Quality:
PPEs:
Right Material Loading
Safety shoe, safety helmet, safety goggles,
fluorescent Jacket
Tools: N A.