You are on page 1of 1

Spinning - Possible Spindles to Allot

Date:

Activity Description Value Total

Grams / Spindle / Shift 80.00

Expected Kgs/ RF / Shift 84.48


Datas No.of Hours / Shift 8.00

Spindles / RF 1056.00

Breaks / 100 Spl. Hours 4.00

No.of Pieceings / Min. 8.00


Breaks No.of Breaks / RF / Shift 337.92

Pieceing Mins. required / RF / Shift 42.24 42.24

Expected Bobbin weight in Kgs 1.20

No.of Bobbin changes / Shift 70.40


Bobbins
Time in Mins / Bobbin change 2.00

Bobbin changing Mins. Required / RF / Shift 140.80 140.80

No.of Pneuma waste Collection / RF / Hour 3.00

No.of Pneuma waste Collection / RF / Shift 24.00


Pneumafil
Pneumafil waste collection Mins. / RF / cycle 1.00

Pneuma waste collection Mins. / Shift 24.00 24.00

Cop Content in Gms 48.00

Weight in Kgs / Doff / RF 50.69


Doffing Expected Doffs / Shift / All RFs 1.67

Doffing assisting Mins. / RF 10.00

Doffing assisting Mins. / RF / Shift 16.67 16.67

Total Mins. Required / RF / Shfit 223.71

Working Efficiency % 75.00

Possible Spindles to Allot 1699.37

You might also like