Performance Management System: (Developing Superior Performers)
Performance Management System: (Developing Superior Performers)
2 Responsible for optimum utilization of resources and ensure production targets are met in all shifts.
3 Develop leadership skills in subordinates ,Lead and actively participate in management of change.
4 Mentoring, facilitate and guide all departments and team members for smooth function and growth for their personal and
6 Responsible for finalization of annual and monthly resource plan, monthly production schedule, right deployment of team
To lead in Daily Work Management Meetings and providing way to achieve zero gaps and improvements. Ensuring all shift start/end meetings
7 within the department.
1
2
6
7
10
11
12
13
14
15
16
17
18
19
20
21
SIGNATURE
DATE:
Page 1
___________ ________ ____________________ _____________________
APPRAISEE SENIOR HEAD OF DEPARTMENT PED / HR-COORDINATOR
Page 1
PERFORMANCE MANAGEMENT SYSTEM
(DEVELOPING SUPERIOR PERFORMERS)
Gate - 2 (b) PERFORMANCE TRACK RECORD
NAME OF THE APPRAISEE: VINOD SINGH RAWAT E. CODE: E00329 QUARTER : 1 / 2 / 3 / 4
4 INTERNAL REJECTION PPM 2000 3428 2000 3351 2000 3281 2000 3353 59.64
1 MAN NOS. 0.6 0.5 0.6 0.60 0.6 1.0 0.6 0.70 116.7
2 MACHINE
3 MATERIAL
4 METHOD
5 MONEY
DATE OF RECEIPT AT
MONTHLY AUDIT PED
NAME :
SIGNATURE:
DATE:
NOTE :
A. RESPONSIBILITIES CAN BE CATEGORISED FOR SAFETY, PRODUCTIVITY, QUALITY, COST, DELIVERY, TECHNOLOGY, EXACTNESS AND MORALE.
B. APPRAISEE IS RESPONSIBLE FOR ENTRY OF ALL DATA IN THIS SHEET AND GETTING IT AUDITTED FROM SENIOR EVERY MONTH BEFORE THE 10TH OF THE FOLLOWING MONTH.
MINIMUM PERFORMANCE ACHIEVEMENT REQUIRED FOR: SELECTED FIVE KPI - 80%; OTHER MEASURABLE RESPONSIBILITIES-80%; TOTAL EMPLOYEE INVOLVEMENT-80%.
Page 10
PERFORMANCE MANAGEMENT SYSTEM
(DEVELOPING SUPERIOR PERFORMERS)
Gate - 2 (b) PERFORMANCE TRACK RECORD
NAME OF THE APPRAISEE: VINOD SINGH RAWAT E. CODE: E00329 QUARTER : 1 / 2 / 3 / 4
4 INTERNAL REJECTION PPM 2000 2930 2000 2344 2000 2173 2000 2482.333 80.57
10 PROCESS SCRAP % 6.5 7.6 6.5 8.2 6.5 8.9 6.5 8.2 78.9
1 MAN NOS. 0.6 0.8 0.6 0.80 0.6 0.8 0.6 0.80 133.3
2 MACHINE
3 MATERIAL
4 METHOD
5 MONEY
DATE OF RECEIPT AT
MONTHLY AUDIT PED
NAME :
SIGNATURE:
DATE:
NOTE :
A. RESPONSIBILITIES CAN BE CATEGORISED FOR SAFETY, PRODUCTIVITY, QUALITY, COST, DELIVERY, TECHNOLOGY, EXACTNESS AND MORALE.
B. APPRAISEE IS RESPONSIBLE FOR ENTRY OF ALL DATA IN THIS SHEET AND GETTING IT AUDITTED FROM SENIOR EVERY MONTH BEFORE THE 10TH OF THE FOLLOWING MONTH.
MINIMUM PERFORMANCE ACHIEVEMENT REQUIRED FOR: SELECTED FIVE KPI - 80%; OTHER MEASURABLE RESPONSIBILITIES-80%; TOTAL EMPLOYEE INVOLVEMENT-80%.
Page 10
PERFORMANCE MANAGEMENT SYSTEM
(DEVELOPING SUPERIOR PERFORMERS)
Gate - 2 (b) PERFORMANCE TRACK RECORD
NAME OF THE APPRAISEE: VINOD SINGH RAWAT E. CODE: E00329 QUARTER : 1 / 2 / 3 / 4
4 INTERNAL REJECTION PPM 2000 1957 2000 1952 2000 2208 2000 2039 98.09
10 PROCESS SCRAP % 6.5 7.39 6.5 6.2 6.5 7.75 6.5 7.1 91.5
1 MAN NOS. 0.6 0.50 0.6 0.80 6.0 0.6 0.6 0.63 105.6
2 MACHINE
3 MATERIAL
4 METHOD
5 MONEY
DATE OF RECEIPT AT
MONTHLY AUDIT PED
NAME :
SIGNATURE:
DATE:
NOTE :
A. RESPONSIBILITIES CAN BE CATEGORISED FOR SAFETY, PRODUCTIVITY, QUALITY, COST, DELIVERY, TECHNOLOGY, EXACTNESS AND MORALE.
B. APPRAISEE IS RESPONSIBLE FOR ENTRY OF ALL DATA IN THIS SHEET AND GETTING IT AUDITTED FROM SENIOR EVERY MONTH BEFORE THE 10TH OF THE FOLLOWING MONTH.
MINIMUM PERFORMANCE ACHIEVEMENT REQUIRED FOR: SELECTED FIVE KPI - 80%; OTHER MEASURABLE RESPONSIBILITIES-80%; TOTAL EMPLOYEE INVOLVEMENT-80%.
Page 10
PERFORMANCE MANAGEMENT SYSTEM
(DEVELOPING SUPERIOR PERFORMERS)
Gate - 2 (b) PERFORMANCE TRACK RECORD
NAME OF THE APPRAISEE: VINOD SINGH RAWAT E. CODE: E00329 QUARTER : 1 / 2 / 3 / 4
4 INTERNAL REJECTION PPM 1200 1655 2000 2161 2000 2201 1733 2006 86.42
7 CHANGE OVER TIME ( MIN. / CHANGE OVER ) MIN. 10 12.48 15 13 15 11 13.3 12.2 91.20
10 PROCESS SCRAP % 6.5 7.2 6.5 7.49 6.5 7.23 6.5 7.3 88.96
1 MAN NOS. 0.6 0.50 0.6 0.6 0.6 1 0.60 0.63 105.56
2 MACHINE
3 MATERIAL
4 METHOD
5 MONEY
DATE OF RECEIPT AT
MONTHLY AUDIT PED
NAME :
SIGNATURE:
DATE:
NOTE :
A. RESPONSIBILITIES CAN BE CATEGORISED FOR SAFETY, PRODUCTIVITY, QUALITY, COST, DELIVERY, TECHNOLOGY, EXACTNESS AND MORALE.
B. APPRAISEE IS RESPONSIBLE FOR ENTRY OF ALL DATA IN THIS SHEET AND GETTING IT AUDITTED FROM SENIOR EVERY MONTH BEFORE THE 10TH OF THE FOLLOWING MONTH.
MINIMUM PERFORMANCE ACHIEVEMENT REQUIRED FOR: SELECTED FIVE KPI - 80%; OTHER MEASURABLE RESPONSIBILITIES-80%; TOTAL EMPLOYEE INVOLVEMENT-80%.