14.0
Toe Wall Foundation
Grid (A1-A3 & Grid D1-D3) 2.0 5.85 0.530 1.150 7.130 Deducted Column
Grid (B1-B4 & Grid C1-C4) 2.0 5.73 0.530 1.150 6.980 Deducted Column
Grid (D1-A1, D3-A3 ) 2.0 1.30 0.530 1.150 1.580 Deducted Column
Grid ( D2-A2 ) 1.0 1.05 0.530 1.150 0.640 Deducted Column
Grid C5-B5 1.0 1.80 0.530 1.150 1.100 Deducted Column
-
-
Manhole Cover 4.0 0.91 0.910 0.100 0.330
1.0 1.06 1.060 0.100 0.110
4.2 Foundation Tie Beam
Grid (A1-A3 & Grid D1-D3) 2.0 8.1 0.230 0.300 1.120
Grid (B1-B4 & Grid C1-C4) 2.0 9.3 0.230 0.300 1.280
Grid (D1-A1, D3-A3 ) 3.0 4.8 0.230 0.300 0.990
Grid C5-B5 1.0 2.7 0.230 0.300 0.190
Column Type C1
A1, A3, D1 & D3 4.0 0.3 0.300 0.925 0.330
Column Type C1
A2, D2 B1, B3, C1 & C3 6.0 0.3 0.300 0.925 0.500
Column Type C1
B2, C2 2.0 0.3 0.300 0.925 0.170
Column Type C1
A1, A3, D1 & D3 4.0 0.3 0.300 3.600 1.300
Column Type C1
A2, D2 B1, B3, C1 & C3 6.0 0.3 0.300 3.600 1.940
Column Type C1
B2, C2 2.0 0.3 0.300 3.600 0.650
Column Type C1
C1 & C2 2.0 0.3 0.300 2.195 0.400
For perapet Wall 4.0 0.3 0.300 1.000 0.360
4.10 First Floor Beam
Grid (B1-B2 & Grid C1-C2) 2.0 4.1 0.230 0.355 0.660
Grid (C1-B1 & C2-B2 2.0 2.7 0.230 0.355 0.440
4.11 Slab
Ground Floor
Grid D1-A4 1.0 9.30 6.300 0.125 7.320
Exit Door 1.0 2.10 1.050 0.125 0.280
Door Drop 1.0 4.20 0.600 0.125 0.320
Deduction
Statue Area (1.0) 4.05 2.700 0.125 (1.370)
Entrance
Flat 1.0 4.80 2.250 0.125 1.350
Slope 1.0 9.30 0.600 0.125 0.700
9.97
Roof Slab
Side 1 18.300 0.600 0.125 1.370
4.12 Staircase
Staircase 1
Waist Slab 1.0 8.50 1.050 0.150 1.340
Steps 20.0 0.023 1.050 0.470 1.81
Beam for Support 3.00 1.00 0.355 0.230 1.070
Z-Beam 1 8.500 0.230 0.230 0.450
4.13 Lintel Beam
Ground Floor
Grid (A1-A3 & Grid D1-D3) 2.0 8.1 0.230 0.150 0.560
Grid (D1-A1 & D3-A3) 2.0 4.8 0.230 0.150 0.330
First Floor
Grid (B1-B2 & Grid C1-C2) 2.0 4.1 0.230 0.150 0.280
Grid (C1-B1 & C2-B2 2.0 2.7 0.230 0.150 0.190
First Floor
Grid (B1-B2 & Grid C1-C2) 2.0 4.1 0.230 0.100 0.190
Grid (C1-B1 & C2-B2 2.0 2.7 0.230 0.100 0.120
Column Type C1
A1, A3, D1 & D3 4.0 1.2 0.925 4.440
Column Type C1
A2, D2 B1, B3, C1 & C3 6.0 1.2 0.925 6.660
Column Type C1
B2, C2 2.0 1.2 0.925 2.220
Column Type C1
A1, A3, D1 & D3 4.0 1.2 3.600 17.280
Column Type C1
A2, D2 B1, B3, C1 & C3 6.0 1.2 3.600 25.920
Column Type C1
B2, C2 2.0 1.2 3.600 8.640
6.90 Slab
Ground Floor
Grid D1-A4 1.0 8.61 5.380 46.320
Exit Door 1.0 2.10 1.05 2.210
Slope 2.0 4.20 0.60 5.040
Deduction
Statue Area (1.0) 4.05 2.700 (10.940)
Entrance
Flat 1.0 4.80 2.250 10.800
Slope 2.0 9.30 0.600 11.160
Roof Slab
Side 1 18.300 0.725 13.270
7.00 Staircase
Staircase 1
Waist Slab 1.0 8.50 1.050 8.930
Steps 20.0 0.18 1.050 3.780
Beam for Support 3.0 1.00 0.94 2.820
Z-Beam 1.00 8.50 0.69 5.870
First Floor
Grid (B1-B2 & Grid C1-C2) 2.0 4.1 2.000 0.150 2.430 Both Side taken
Grid (C1-B1 & C2-B2 2.0 2.7 2.000 0.150 1.620 Both Side taken
Door/Window Top 1.0 6.0 0.230 1.380
First Floor
Grid (B1-B2 & Grid C1-C2) 2.0 4.1 2.000 0.100 1.620 Both Side taken
Grid (C1-B1 & C2-B2 2.0 2.7 2.000 0.100 1.080 Both Side taken
Total Quantity 329.300 Sq.m.
Total Quantity of Formwork 329.300 Sq.m.
7.0 Stone Masonry Work 1:6 C/S Mortar
7.1 Sub structure Stone Masonry Work 1:6 C/S Mortar
Deduction
Door
MD (1.0) 1.80 0.230 2.400 (0.990)
D1 (1.0) 0.90 0.230 2.100 (0.430)
Windows
W1 (3.0) 1.50 0.230 1.500 (1.550)
W2 (2.0) 1.50 0.230 1.500 (1.040)
Deduction
Windows
W1 (4.0) 1.50 0.230 1.500 (2.070)
Deduction
Door
MD (1.0) 1.80 0.500 2.400 (2.160)
D1 (1.0) 0.90 0.500 2.400 (1.080)
Windows
W1 (3.0) 1.50 0.500 1.500 (3.375)
W2 (2.0) 1.50 0.500 1.500 (2.250)
Deduction
Windows
W1 (4.0) 1.50 0.500 1.500 (4.500) one side deduction only
Deduction
Statue Area (1) 4.05 2.70 (10.94)
First Floor
Parapet Wall TOP 1 25.800 0.230 5.930
E Others Component
Providing and Fixing Chatras Diameter= 1'-6"
1.0 4.00 4.000 No
Height= 2'-8"
2.0 Providing and Fixing Gajur (main) 1.0 1.000 No
Diameter=0'-6" Height= 2'-6"
3.0 Providing and Fixing Gajur (secondary) 1.0 1.000 No
Diameter=0'-6" Height= 1'-6"
Providing and Fixing Dharmachakra and 2 deers
Diameter= 1'-6" Height= 3'-6"
4.0 Length= 2'-6" Height= 2'-0" breath= 1'-0" 1.0 1.000 No
Project: Preparation of Design, Drawings, Estimate and Specifications for Monasteries Type Design
Site: Nepal (for 600 Sqft Plinth Area SS)
Item Nos.
Description Nos. (Bar) Length T. Length Unit Wt. Quantity Unit Total Weight
No. (Items)
1.0 Reinforcement Bars
1.1 TMT Reinforcement Bars
i Column Foundation
Footing Type (F1)
B4 & C4 2 18 1.100 39.600 0.888 35.16 12mmØ @150c/c Both Ways
-
- - - - - 0.888 -
ii Columns
Foundation - Up to Ground Floor
C1
Main Bars- 16 mm dia 14 4 7.100 397.600 1.580 628.21
Main Bars- 12 mm dia 14 4 7.050 394.800 0.888 350.58
Stirrups- 8 mm dia
Outer 14 56 1.030 807.520 0.390 314.93
Inner 14 56 0.790 619.360 0.390 241.55
iii Beams
Project: Preparation of Design, Drawings, Estimate and Specifications for Monasteries Type Design
Site: Nepal (for 600 Sqft Plinth Area SS)
Item Nos.
Description Nos. (Bar) Length T. Length Unit Wt. Quantity Unit Total Weight
No. (Items)
Grid (D1-A1, D3-A3 ) 3 8.000 24.000
Grid C5-B5 1 5.300 5.300
81.500
Main Bars- 12 mm dia 1 3 81.500 244.500 0.888 217.12
Main Bars- 12 mm dia 1 3 81.500 244.500 0.888 217.12
Stirrups- 8 mm dia
Outer 1 652 1.150 749.800 0.390 292.42
iv Sill Tie
For All Floor
Main Bars - 10mm dia 1 2 41 81.20 0.620 50.34
Stirrups - 7mm dia 1 271 0.300 81.30 0.300 24.39
v Lintel Beam
For All Floor
Main Bars - 12 mm dia 1 4 41 162.40 0.888 144.21
Stirrups- 8 mm dia 1 271 0.710 192.41 0.390 75.04
vi Slab
Reinforcement @ 1% of
a 1.00 9.97 782.65
Concrete Volume of Slab
vii Staircase
Reinforcement @ 1.5% of
1 1.81 213.13
Concrete Volume of Stair Slab
Beam for Suport 3.0 1.0 3.000
1.0 8.5 8.500
Z-Beam 11.500
Main Bars - 12 mm dia 1.0 6.0 11.960 71.76 0.890 63.87
Stirrups - 8mm dia 1.0 80.0 0.500 40.00 0.390 15.60
Project: Preparation of Design, Drawings, Estimate and Specifications for Monasteries Type Design
Site: Nepal (for 600 Sqft Plinth Area SS)
Item Nos.
Description Nos. (Bar) Length T. Length Unit Wt. Quantity Unit Total Weight
No. (Items)
Total Quantity 292.598 k.g.
Total Quantity of Steel 292.60 k.g. 292.60
A GENERAL WORKS
Provide insurance for the loss of damage to works, plant, material, equipment, property
1 1.00 PS 85,234.91 85,234.91
and personnel injury or death as per specification and instruction.
Provision of laboratory tests as required and order outside the project Laboratory as per
2 1.00 PS 18,849.00 18,849.00
the specification and instructions of the Site engineers.
Provide , erect and maintain project site notice boards as per instruction of Site engineer
3 1.00 PS 17,553.60 17,553.60
and specification all complete.
As Built Drawing of project (civil, electrical, sanitation in 1:100 scale 5 sets hard copy
4 1.00 PS 40,033.40 40,033.40
including digital copy as per the instruction of the Site Engineer
Total Works of A 161,670.91
B CIVIL WORKS
1 Site clearance
Site clearance before and after completion of work including disposing the remaining
1.1 construction materials & plants & making the site in working condition all complete as 128.25 Sqm 18.51 2,373.91
per instruction of site Engineer.
2 Earthworks
Earthwork in excavation in hard/boulder mix soils in foundation including 10m hauling
2.1 distance and 1.5 m. lift all complete as per design, drawing, specification and instruction 100.85 Cum 663.32 66,895.82
of site Engineer.
Earthwork backfilling in 150 mm layers by ramming & watering at required places as per
2.2 instruction & disposing all surplus excavated materials within the site as per design, 51.86 Cum 799.25 41,445.11
drawing, specification and instruction of site Engineer all complete.
10.2 sand and crushed stone aggregate including mixing, laying and compacting and curing 52.74 Sqm 1,212.41 63,942.50
etc. all complete as per design, drawing, specification and instruction of site Engineer
Supplying and laying of one layer of 500 gauge Polythene sheet on prepared surface
10.3 39.78 Sqm 153.75 6,116.18
50 mm thick (1:2:4) concrete screeding work with water proof compound including
10.4 mixing laying and rubbing with steel trowel to a hard, smooth and shining surface and 91.66 Sqm 891.31 81,697.47
curing all complete.
Floor Finishing Works
Providing and Laying 3 mm thick cement sand punning on floor, skriting, dado etc.,
including mixing laying and rubbing with steel trowel to a hard, smooth and shining
10.5 132.26 sq.m. 293.80 38,857.99
surface and curing all complete.as per specification, drawing and instruction of Site
Engineer.
Providing and laying 8 mm thick glazed/nonglazed ceramic tiles (Spartek, Kajaria, or
approved equivalent) of approved shade, size and pattern on Skirting, perapet wall top
and floor in perfect line and level on 12.5 mm thick base cement sand mortar (1:4) and
10.6 32.72 Sq.m 3,113.43 101,855.86
jointed with cement slurry mixed with pigment to match the shade of the tile including
adhesive chemical all complete as per specification, drawing and instruction of Site
Engineer.
11 Door / Windows
C ELECTRICAL WORKS
1 DISTRIBUTION BOARDS
1.1 DISTRIBUTION BOARDS (Breaker make Schneider , L& T or Equivalent) 1.00 Set 27,600.00 27,600.00
2.1 3 core6 sq.mm PVC insulated copper unarmoured Cable for DB main.
Point Wiring( Switch socket make : Schneider or equivalent, Wire make: Pioneer,
3 10.00 points 2,500.00 25,000.00
Mahalaxmi, Trishakti make)
3.1 6/16 A twin Power point wiring
Supplying, wiring, testing and commissioning and putting into
operation for 6/16 A and 13 A power point using 2 x 4 sq mm
+ 1 x 2.5 Sq mm stranded copper conductor, 1100 volts grade, PVC insulated wires
drawn through HDP conduit, cable sleeve/support but including specified dia pipes
concealed in wall and floor/false ceiling including all fixing and connecting materials. The
rate for point wiring shall include the circuit wiring from deginated Distribution Board
(DB) up to the first power point then the looping between sockets. The cost shall be
including modular formation twin switch sockets and their flushing GI box , cutting and
filling chases for recessed pipes as deemed as per drawing and lay out plan all
complete.(Average Length=12 m)
3.2 Light point Wiring 13.00 points 2,250.00 29,250.00
5 Earthing system
EARTHING SYSTEMS
Supply, installation, testing and commissioning of following
types of Maintenance Free compound earthing stations by means of 2 meter long, 50
mm dia intergrated with 100x32x6 mm terminals filled with earth enhancing coumpound
in required quantity all complete with 300 x300 x450 mm masonry enclosure with
pre cast cover. All earthing arrangements must comply with IS–3043.The resistivity
should be below 3 ohm.
5.1 Copper electrode. 1.00 No 28000 28,000.00
Total Works of C 160,116.10
D SANITARY WORKS
Supply and Install 110 mm UPVC Rainwater down pipe including Screen, Inlet and all
1 30.00 Rm 419.78 12,593.52
required fittings & accessories all complete as per engineer instruction
Supply and Install 150 mm HDP Pipe 4kgf. including required all accessories all
2 40.00 Rm 1,102.49 44,099.60
complete as per engineer instruction
E Others Component
Providing and fixing Dragons Placed on corners of pagodas. Made of metal moulding
5 4.00 Nos. 10,000.00 40,000.00
Length= 1'-6" breath= 1'-0" Made up of Fibre moulding
Total Works of E 305,000.00
F Miscelleneous Works
Providing and Fixing 9 Kg BC/ABC type Dry Pouder Fire Extinguisher Attack fire Brand
1 2.00 Nos. 9,775.00 19,550.00
or equivalent
Type of Fire:BC/AB&C
Extinguishing Type:Stored Pressure
Extinguishing Media
Dry Powder:(Mono Ammonium Phospate/Sodium-bi-carbonate) IS: 4308 / IS: 14609 Pressured
with N2 Gas
Total Works of F 19,550.00
Project: Preparation of Design, Drawings, Estimate and Specifications for Monasteries Type Design
Site: Nepal (for 600 Sqft Plinth Area SS)
Insurance premium
1 Insurance premium for the work, plant and materials damage for contract work for all risk including Riot,Strike,
Damage,Malicious damage and Terrorism for contract work for project period 12 months + 1 year Maintenance period.
Insurance with value (NRs. Rs. 3.03 per thousand Rs 15,658.85
do for Terrorism Rs. 1.49 per thousand Rs 7,700.23
Premium Rs 23,359.08
for stamp duty Rs 10.00
Premium with stamp duty Rs 23,369.08
Total Amount without VAT Rs 23,369.08
2 Insurance premium for the insurance of owner and consultant staff (named) Rs. 10,00,000.00 per person for 3 persons
with unlimited number of occurances per annum
Personnel accident of 10,00,000.00 for 20 Rs.2.00 per thousand Rs 6,000.00
Do for Terrorism Rs.0.50 per thousand Rs 1,500.00
Premium Rs 7,500.00
For stamp duty Rs 10.00
Premium with stamp duty Rs 7,510.00
Total Amount without VAT Rs 7,510.00
Total Amount without VAT Rs 23,155.83
3 Insurance Premium for construction equipments and machines with value of Rs.20,00,000.00 for 12 months
4 Insurance Premium for third party liability personal only per person Rs.2,00,000.00 for 3 persons for 12months
Project: Preparation of Design, Drawings, Estimate and Specifications for Monasteries Type Design
Site: Nepal (for 600 Sqft Plinth Area SS)
5 Insurance Premium for Contractor's Workers(Un named) per person only Rs.2,00,000.00 for 25 persons for 12months
Per Annum
Per Annum
Per period
Project: Preparation of Design, Drawings, Estimate and Specifications for Monasteries Type Design
Site: Nepal (for 600 Sqft Plinth Area SS)
Total = 18849.00
#REF!
#REF!
Lap
Total L Unit
S.N Item of Work Number Nos. Dia Length length@6 Total/kg Remarks
in m Weight
0d
1 Foundation Footing
F1 4.00 10.00 16.00 1.40 56.00 1.58 88.48 ###
4.00 10.00 16.00 1.40 56.00 1.58 88.48 ###
F2 4.00 14.00 16.00 2.00 112.00 1.58 176.96 ###
4.00 14.00 16.00 2.00 112.00 1.58 176.96 ###
F3 4.00 15.00 16.00 2.20 132.00 1.58 208.56 ###
4.00 15.00 16.00 2.20 132.00 1.58 208.56 ###
F 4.00 8.00 12.00 1.20 38.40 0.89 34.18 ###
4.00 8.00 12.00 1.20 38.40 0.89 34.18 ###
Total Reinforcement in Foundation Footing 1016.35 Kg
2 Foundation column
Foundation
C1 4.00 4.00 12.00 1.70 0.72 38.72 0.89 34.46
4.00 4.00 16.00 1.70 0.96 42.56 1.58 67.24
C2 4.00 4.00 16.00 1.70 0.96 42.56 1.58 67.24
4.00 4.00 16.00 1.70 0.96 42.56 1.58 67.24
C3 4.00 4.00 20.00 1.70 1.20 46.40 2.47 114.61
4.00 4.00 16.00 1.70 0.96 42.56 1.58 67.24
C 4.00 4.00 12.00 1.70 0.72 38.72 0.89 34.46
4.00 4.00 12.00 1.70 0.72 38.72 0.89 34.46
Sub-Total 486.96
Strirrups
C1 external 4.00 17.00 8.00 0.98 0.00 66.64 0.39 25.99
Internal 4.00 17.00 8.00 0.72 0.00 48.96 0.39 19.09
C2 external 4.00 17.00 8.00 0.98 0.00 66.64 0.39 25.99
Internal 4.00 17.00 8.00 0.72 0.00 48.96 0.39 19.09
C3 external 4.00 17.00 8.00 0.98 0.00 66.64 0.39 25.99
Internal 4.00 17.00 8.00 0.72 0.00 48.96 0.39 19.09
C, external 4.00 17.00 8.00 0.98 0.00 66.64 0.39 25.99
Internal 4.00 17.00 8.00 0.72 0.00 48.96 0.39 19.09
Sub-Total 180.33
Total Reinforcement in Foundation Cloumn 667.30 Kg
3 Superstructure Column
Ground Floor
C1 4.00 4.00 12.00 2.75 0.72 55.52 0.89 49.41
4.00 4.00 16.00 2.75 0.96 59.36 1.58 93.79
C2 4.00 4.00 16.00 2.75 0.96 59.36 1.58 93.79
4.00 4.00 16.00 2.75 0.96 59.36 1.58 93.79
C3 4.00 4.00 20.00 2.75 1.20 63.20 2.47 156.10
4.00 4.00 16.00 2.75 0.96 59.36 1.58 93.79
C 4.00 4.00 12.00 2.92 0.72 58.24 0.89 51.83
2.00 4.00 12.00 2.92 0.72 29.12 0.89 25.92
Sub-Total 658.42 Kg
Strirrups
C1 external 4.00 28.00 8.00 0.98 0.00 109.76 0.39 42.81
Internal 4.00 28.00 8.00 0.72 0.00 80.64 0.39 31.45
C2 external 4.00 28.00 8.00 0.98 0.00 109.76 0.39 42.81
Internal 4.00 28.00 8.00 0.72 0.00 80.64 0.39 31.45
C3 external 4.00 28.00 8.00 0.98 0.00 109.76 0.39 42.81
Internal 4.00 28.00 8.00 0.72 0.00 80.64 0.39 31.45
C, external 4.00 30.00 8.00 0.98 0.00 117.60 0.39 45.86
Internal 2.00 30.00 8.00 0.72 0.00 43.20 0.39 16.85
Sub-Total 285.48 Kg
First Floor
C1 4.00 4.00 12.00 2.63 0.72 53.60 0.89 47.70
4.00 4.00 12.00 2.63 0.72 53.60 0.89 47.70
C2 4.00 4.00 16.00 2.63 0.96 57.44 1.58 90.76
#REF!
#REF!
Lap
Total L Unit
S.N Item of Work Number Nos. Dia Length length@6 Total/kg Remarks
in m Weight
0d
4.00 4.00 12.00 2.63 0.72 53.60 0.89 47.70
C3 4.00 4.00 16.00 2.63 0.96 57.44 1.58 90.76
4.00 4.00 16.00 2.63 0.96 57.44 1.58 90.76
Sub-Total 415.38 Kg
Strirrups
C1 external 4.00 27.00 8.00 0.98 0.00 105.84 0.39 41.28
Internal 4.00 27.00 8.00 0.72 0.00 77.76 0.39 30.33
C2 external 4.00 27.00 8.00 0.98 0.00 105.84 0.39 41.28
Internal 4.00 27.00 8.00 0.72 0.00 77.76 0.39 30.33
C3 external 4.00 27.00 8.00 0.98 0.00 105.84 0.39 41.28
Internal 4.00 27.00 8.00 0.72 0.00 77.76 0.39 30.33
Sub-Total 214.81 Kg
Second floor
C2 4.00 4.00 16.00 2.63 0.96 57.44 1.58 90.76
4.00 4.00 12.00 2.86 0.72 57.28 0.89 50.98
C3 4.00 4.00 16.00 2.86 0.96 61.12 1.58 96.57
4.00 4.00 16.00 2.86 0.96 61.12 1.58 96.57
Sub-Total 334.87 Kg
Strirrups
C2 external 4.00 27.00 8.00 0.98 0.00 105.84 0.39 41.28
Internal 4.00 29.00 8.00 0.72 0.00 83.52 0.39 32.57
C3 external 4.00 29.00 8.00 0.98 0.00 113.68 0.39 44.34
Internal 4.00 29.00 8.00 0.72 0.00 83.52 0.39 32.57
Sub-Total 150.76 Kg
Total Reinforcement in Super structure Cloumn 2059.71 Kg
4 Ground Floor
i Foundation Beam
Lower Tie Beam (LTB) ###
Grid A-A 1.00 6.00 12.00 13.60 0.72 85.89 0.89 76.44
Grid B-B 1.00 6.00 12.00 13.60 0.72 85.89 0.89 76.44
Grid C-C 1.00 6.00 12.00 3.70 0.72 26.49 0.89 23.58
Grid 1-1 1.00 6.00 12.00 4.90 0.72 33.69 0.89 29.98
Grid 2-2 1.00 6.00 12.00 4.90 0.72 33.69 0.89 29.98
Grid 3-3 1.00 6.00 12.00 8.40 0.72 54.69 0.89 48.67
Grid 4-4 1.00 6.00 12.00 8.40 0.72 54.69 0.89 48.67
Grid 5-5 1.00 6.00 12.00 4.90 0.72 33.69 0.89 29.98
Cantilever Beam 1.00 6.00 12.00 5.39 0.72 36.66 0.89 32.63
Sub-Total 396.39 Kg
Tie Beam (UTB)
Grid A-A 1.00 4.00 16.00 13.60 0.96 58.22 1.58 91.99
1.00 2.00 12.00 13.60 0.72 28.63 0.89 25.48
Grid B-B 1.00 4.00 16.00 13.60 0.96 58.22 1.58 91.99
1.00 2.00 12.00 13.60 0.72 28.63 0.89 25.48
Grid C-C 1.00 4.00 16.00 3.70 0.96 18.62 1.58 29.42
1.00 2.00 12.00 3.70 0.72 8.83 0.89 7.86
Grid 1-1 1.00 4.00 16.00 4.90 0.96 23.42 1.58 37.00
1.00 2.00 12.00 4.90 0.72 11.23 0.89 9.99
Grid 2-2 1.00 4.00 16.00 4.90 0.96 23.42 1.58 37.00
1.00 2.00 12.00 4.90 0.72 11.23 0.89 9.99
Grid 3-3 1.00 4.00 16.00 8.40 0.96 37.42 1.58 59.12
1.00 2.00 12.00 8.40 0.72 18.23 0.89 16.22
Grid 4-4 1.00 4.00 16.00 8.40 0.96 37.42 1.58 59.12
1.00 2.00 12.00 8.40 0.72 18.23 0.89 16.22
Grid 5-5 1.00 4.00 16.00 4.90 0.96 23.42 1.58 37.00
1.00 2.00 12.00 4.90 0.72 11.23 0.89 9.99
Cantilever beam 1.00 4.00 16.00 5.39 0.96 25.40 1.58 40.13
1.00 2.00 12.00 5.39 0.72 12.22 0.89 10.88
#REF!
#REF!
Lap
Total L Unit
S.N Item of Work Number Nos. Dia Length length@6 Total/kg Remarks
in m Weight
0d
Sub-Total 614.90 Kg
Strirups
Lower Tie Beam (LTB)
Grid A-A 1.00 110.00 8.00 0.87 0.00 95.70 0.39 37.32 ###
Grid B-B 1.00 110.00 8.00 0.87 0.00 95.70 0.39 37.32 ###
Grid C-C 1.00 28.00 8.00 0.87 0.00 24.36 0.39 9.50 ###
Grid 1-1 1.00 38.00 8.00 0.87 0.00 33.06 0.39 12.89 ###
Grid 2-2 1.00 38.00 8.00 0.87 0.00 33.06 0.39 12.89 ###
Grid 3-3 1.00 67.00 8.00 0.87 0.00 58.29 0.39 22.73 ###
Grid 4-4 1.00 67.00 8.00 0.87 0.00 58.29 0.39 22.73 ###
Grid 5-5 1.00 38.00 8.00 0.87 0.00 33.06 0.39 12.89 ###
Cantilever beam 1.00 45.00 8.00 0.87 0.00 39.15 0.39 15.27 ###
Tie Beam (UTB)
Grid A-A 1.00 110.00 8.00 1.06 0.00 116.60 0.39 45.47 ###
Grid B-B 1.00 110.00 8.00 1.06 0.00 116.60 0.39 45.47 ###
Grid C-C 1.00 28.00 8.00 1.06 0.00 29.68 0.39 11.58 ###
Grid 1-1 1.00 38.00 8.00 1.06 0.00 40.28 0.39 15.71 ###
Grid 2-2 1.00 38.00 8.00 1.06 0.00 40.28 0.39 15.71 ###
Grid 3-3 1.00 67.00 8.00 1.06 0.00 71.02 0.39 27.70 ###
Grid 4-4 1.00 67.00 8.00 1.06 0.00 71.02 0.39 27.70 ###
Grid 5-5 1.00 38.00 8.00 1.06 0.00 40.28 0.39 15.71 ###
Cantilever beam 1.00 45.00 8.00 1.06 0.00 47.70 0.39 18.60 ###
Sub-Total 407.21 Kg
Total Beam for Foundation 1418.50 Kg
ii Sill Tie ###
Grid A-A 1.00 2.00 10.00 7.400 0.00 14.80 0.62 9.18 ###
Cantilever Portion 1.00 2.00 10.00 4.460 0.00 8.92 0.62 5.53 ###
Grid B-B 1.00 2.00 10.00 7.400 0.00 14.80 0.62 9.18 ###
Grid C-C 1.00 2.00 10.00 2.700 0.00 5.40 0.62 3.35 ###
Grid 1-1 1.00 2.00 10.00 3.900 0.00 7.80 0.62 4.84 ###
Grid 3-3 1.00 2.00 10.00 5.450 0.00 10.90 0.62 6.76 ###
Grid 4-4 1.00 2.00 10.00 5.900 0.00 11.80 0.62 7.32 ###
Grid B3-B4 1.00 1.00 10.00 2.700 0.00 2.70 0.62 1.67
Toilet wall 1.00 1.00 10.00 2.980 0.00 2.98 0.62 1.85
Sub-Total 49.66 Kg
iii Lintel Tie
Grid A-A 1.00 2.00 10.00 7.400 0.00 14.80 0.62 9.18 ###
Cantilever Portion 1.00 2.00 10.00 4.460 0.00 8.92 0.62 5.53 ###
Grid B-B 1.00 2.00 10.00 7.400 0.00 14.80 0.62 9.18 ###
Grid C-C 1.00 2.00 10.00 2.700 0.00 5.40 0.62 3.35 ###
Grid 1-1 1.00 2.00 10.00 3.900 0.00 7.80 0.62 4.84 ###
Grid 3-3 1.00 2.00 10.00 5.450 0.00 10.90 0.62 6.76 ###
Grid 4-4 1.00 2.00 10.00 7.100 0.00 14.20 0.62 8.80 ###
Grid B3-B4 1.00 1.00 10.00 2.700 0.00 2.70 0.62 1.67
Toilet wall 1.00 1.00 10.00 3.730 0.00 3.73 0.62 2.31
Sub-Total 51.61 Kg
iv Slab Beam
Grid A-A 1.00 4.00 16.00 13.60 0.96 58.22 1.58 91.99
1.00 1.00 12.00 13.60 0.72 14.32 0.89 12.74
Grid B-B 1.00 4.00 16.00 13.60 0.96 58.22 1.58 91.99
1.00 1.00 12.00 13.60 0.72 14.32 0.89 12.74
Grid C-C 1.00 4.00 16.00 3.70 0.96 18.62 1.58 29.42
1.00 1.00 12.00 3.70 0.72 4.42 0.89 3.93
Grid 1-1 1.00 4.00 16.00 4.90 0.96 23.42 1.58 37.00 ###
1.00 1.00 12.00 4.90 0.72 5.62 0.89 5.00 ###
Grid 2-2 1.00 4.00 16.00 4.90 0.96 23.42 1.58 37.00
1.00 1.00 12.00 4.90 0.72 5.62 0.89 5.00
#REF!
#REF!
Lap
Total L Unit
S.N Item of Work Number Nos. Dia Length length@6 Total/kg Remarks
in m Weight
0d
Grid 3-3 1.00 4.00 16.00 8.40 0.96 37.42 1.58 59.12
1.00 1.00 12.00 8.40 0.72 9.12 0.89 8.11
Grid 4-4 1.00 4.00 16.00 8.40 0.96 37.42 1.58 59.12
1.00 1.00 12.00 8.40 0.72 9.12 0.89 8.11 ###
Grid 5-5 1.00 4.00 16.00 4.90 0.96 23.42 1.58 37.00 ###
1.00 1.00 12.00 4.90 0.72 5.62 0.89 5.00
Cantilever beam 1.00 4.00 16.00 5.39 0.96 25.40 1.58 40.13
1.00 1.00 12.00 5.39 0.72 6.11 0.89 5.44 ###
Extra Bar
Grid A-A 1.00 2.00 12.00 8.58 0.00 17.16 0.89 15.27 ###
Grid B-B 1.00 2.00 12.00 8.58 0.00 17.16 0.89 15.27
Grid C-C 1.00 2.00 12.00 1.95 0.00 3.90 0.89 3.47
Grid 1-1 1.00 2.00 12.00 2.82 0.00 5.64 0.89 5.02
Grid 2-2 1.00 2.00 12.00 3.12 0.00 6.24 0.89 5.55
Grid 3-3 1.00 2.00 12.00 5.82 0.00 11.64 0.89 10.36
Grid 4-4 1.00 2.00 12.00 5.82 0.00 11.64 0.89 10.36
Grid 5-5 1.00 2.00 12.00 3.12 0.00 6.24 0.89 5.55
Sub-Total 619.70 Kg
v Strirups
Slab Beam
Grid A-A 1.00 110.00 8.00 1.06 0.00 116.60 0.39 45.47 ###
Grid B-B 1.00 110.00 8.00 1.06 0.00 116.60 0.39 45.47 ###
Grid C-C 1.00 28.00 8.00 1.06 0.00 29.68 0.39 11.58 ###
Grid 1-1 1.00 38.00 8.00 1.06 0.00 40.28 0.39 15.71 ###
Grid 2-2 1.00 38.00 8.00 1.06 0.00 40.28 0.39 15.71 ###
Grid 3-3 1.00 67.00 8.00 1.06 0.00 71.02 0.39 27.70 ###
Grid 4-4 1.00 67.00 8.00 1.06 0.00 71.02 0.39 27.70 ###
Grid 5-5 1.00 38.00 8.00 1.06 0.00 40.28 0.39 15.71 ###
Cantilever beam 1.00 45.00 8.00 1.06 0.00 47.70 0.39 18.60 ###
Sill (C- hook) ###
Grid A-A 1.00 50.00 8.00 0.350 0.00 17.50 0.39 6.83 ###
Cantilever Portion 1.00 30.00 8.00 0.350 0.00 10.50 0.39 4.10 ###
Grid B-B 1.00 50.00 8.00 0.350 0.00 17.50 0.39 6.83 ###
Grid C-C 1.00 18.00 8.00 0.350 0.00 6.30 0.39 2.46 ###
Grid 1-1 1.00 26.00 8.00 0.350 0.00 9.10 0.39 3.55 ###
Grid 3-3 1.00 37.00 8.00 0.350 0.00 12.95 0.39 5.05 ###
Grid 4-4 1.00 40.00 8.00 0.350 0.00 14.00 0.39 5.46 ###
Grid B3-B4 1.00 18.00 8.00 0.350 0.00 6.30 0.39 2.46
Toilet wall 1.00 20.00 8.00 0.350 0.00 7.00 0.39 2.73
Lintel Tie
Grid A-A 1.00 50.00 8.00 0.350 0.00 17.50 0.39 6.83 ###
Cantilever Portion 1.00 30.00 8.00 0.350 0.00 10.50 0.39 4.10 ###
Grid B-B 1.00 50.00 8.00 0.350 0.00 17.50 0.39 6.83 ###
Grid C-C 1.00 18.00 8.00 0.350 0.00 6.30 0.39 2.46 ###
Grid 1-1 1.00 26.00 8.00 0.350 0.00 9.10 0.39 3.55 ###
Grid 3-3 1.00 37.00 8.00 0.350 0.00 12.95 0.39 5.05 ###
Grid 4-4 1.00 48.00 8.00 0.350 0.00 16.80 0.39 6.55 ###
Grid B3-B4 1.00 18.00 8.00 0.350 0.00 6.30 0.39 2.46
Toilet wall 1.00 25.00 8.00 0.350 0.00 8.75 0.39 3.41
Sub-Total 304.32 Kg
Total Reinforcement in Ground Floor Beam 1025.29 Kg
vi Slab
Main Bar
Grid A1-A3-B3-B1
IN X DIRECTION
Bottom Bar 1.00 15.00 8.00 2.64 0.00 39.60 0.39 15.44
Bottom Bar 1.00 15.00 8.00 4.50 0.00 67.50 0.39 26.33
#REF!
#REF!
Lap
Total L Unit
S.N Item of Work Number Nos. Dia Length length@6 Total/kg Remarks
in m Weight
0d
Bottom Bar 1.00 15.00 8.00 3.57 0.00 53.55 0.39 20.88
Bottom Bar 1.00 15.00 8.00 2.94 0.00 44.10 0.39 17.20
Bottom Bar 1.00 14.00 8.00 4.84 0.00 67.76 0.39 26.43
Bottom Bar 1.00 14.00 8.00 5.67 0.00 79.31 0.39 30.93
Bottom Bar 1.00 20.00 8.00 6.20 0.00 124.00 0.39 48.36
IN Y DIRECTION
Bottom Bar 1.00 16.00 8.00 7.40 0.00 118.40 0.39 46.18
Bottom Bar 1.00 16.00 8.00 8.30 0.00 132.80 0.39 51.79
Bottom Bar 1.00 20.00 8.00 2.92 0.00 58.34 0.39 22.75
Bottom Bar 1.00 20.00 8.00 2.85 0.00 57.00 0.39 22.23
Bottom Bar 1.00 22.00 8.00 0.74 0.00 16.17 0.39 6.31
Bottom Bar 1.00 22.00 8.00 3.12 0.00 68.64 0.39 26.77
IN X DIRECTION
Top Bar 2.00 57.00 8.00 0.93 0.00 106.02 0.39 41.35
Top Bar 1.00 39.00 8.00 0.83 0.00 32.18 0.39 12.55
Top Bar 1.00 39.00 8.00 2.70 0.00 105.30 0.39 41.07
Top Bar 2.00 20.00 8.00 2.38 0.00 95.00 0.39 37.05
IN Y DIRECTION
Top Bar 1.00 31.00 8.00 0.90 0.00 27.90 0.39 10.88
Top Bar 1.00 31.00 8.00 2.70 0.00 83.70 0.39 32.64
Top Bar 1.00 31.00 8.00 1.95 0.00 60.45 0.39 23.58
Top Bar 1.00 39.00 8.00 0.75 0.00 29.25 0.39 11.41
Top Bar 1.00 25.00 8.00 1.08 0.00 27.05 0.39 10.55
Top Bar 1.00 43.00 8.00 1.69 0.00 72.46 0.39 28.26
Top Bar 1.00 43.00 8.00 0.80 0.00 34.40 0.39 13.42
Top Bar 1.00 12.00 8.00 0.90 0.00 10.80 0.39 4.21
Inclined slab
Bottom Bar 1.00 8.00 8.00 11.52 0.00 92.16 0.39 35.94
Bottom Bar 1.00 78.00 8.00 1.14 0.00 88.92 0.39 34.68
Total Reinforcement in Ground Floor Slab 699.17 Kg
5 First Floor
i Sill Tie ###
Grid A-A 1.00 2.00 10.000 7.400 0.00 14.80 0.62 9.18 ###
Cantilever Portion 1.00 2.00 10.000 4.460 0.00 8.92 0.62 5.53 ###
Grid B-B 1.00 2.00 10.000 7.400 0.00 14.80 0.62 9.18 ###
Grid C-C 1.00 2.00 10.000 2.700 0.00 5.40 0.62 3.35 ###
Grid 1-1 1.00 2.00 10.000 3.900 0.00 7.80 0.62 4.84 ###
Grid 2-2 1.00 1.00 10.000 2.900 0.00 2.90 0.62 1.80 ###
Grid 3-3 1.00 2.00 10.000 5.450 0.00 10.90 0.62 6.76 ###
Grid 4-4 1.00 2.00 10.000 6.100 0.00 12.20 0.62 7.56
Grid B3-B4 1.00 1.00 10.000 2.700 0.00 2.70 0.62 1.67
Toilet wall 1.00 1.00 10.000 2.980 0.00 2.98 0.62 1.85 ###
Account office 1.00 1.00 10.000 1.755 0.00 1.76 0.62 1.09 ###
Sub-Total 52.80 Kg
ii Lintel Tie
Ground floor
Grid A-A 1.00 2.00 10.000 7.400 0.00 14.80 0.62 9.18 ###
Cantilever Portion 1.00 2.00 10.000 4.460 0.00 8.92 0.62 5.53 ###
#REF!
#REF!
Lap
Total L Unit
S.N Item of Work Number Nos. Dia Length length@6 Total/kg Remarks
in m Weight
0d
Grid B-B 1.00 2.00 10.000 7.400 0.00 14.80 0.62 9.18 ###
Grid C-C 1.00 2.00 10.000 2.700 0.00 5.40 0.62 3.35 ###
Grid 1-1 1.00 2.00 10.000 3.900 0.00 7.80 0.62 4.84 ###
Grid 2-2 1.00 2.00 10.000 3.900 0.00 7.80 0.62 4.84 ###
Grid 3-3 1.00 2.00 10.000 5.450 0.00 10.90 0.62 6.76 ###
Grid 4-4 1.00 2.00 10.000 7.100 0.00 14.20 0.62 8.80
Grid B3-B4 1.00 1.00 10.000 2.700 0.00 2.70 0.62 1.67
Toilet wall 1.00 1.00 10.000 3.730 0.00 3.73 0.62 2.31 ###
Account office 1.00 1.00 10.000 2.755 0.00 2.76 0.62 1.71 ###
Sub-Total 58.16 Kg
iii Slab Beam Cantilever Portion
Grid A-A 1.00 4.00 16.00 11.70 0.96 50.62 1.58 79.98 Grid B-B
1.00 1.00 12.00 11.70 0.72 12.42 0.89 11.05 Grid C-C
Grid B-B 1.00 4.00 16.00 11.70 0.96 50.62 1.58 79.98 Grid 1-1
1.00 1.00 12.00 11.70 0.72 12.42 0.89 11.05 Grid 2-2
Grid C-C 1.00 4.00 16.00 3.70 0.96 18.62 1.58 29.42 Grid 3-3
1.00 1.00 12.00 3.70 0.72 4.42 0.89 3.93 Grid 4-4
Grid 1-1 1.00 4.00 16.00 4.90 0.96 23.42 1.58 37.00 Grid B3-B4
1.00 1.00 12.00 4.90 0.72 5.62 0.89 5.00 Toilet wall
Grid 2-2 1.00 4.00 16.00 4.90 0.96 23.42 1.58 37.00 ount office
1.00 1.00 12.00 4.90 0.72 5.62 0.89 5.00
Grid 3-3 1.00 4.00 16.00 8.40 0.96 37.42 1.58 59.12
1.00 1.00 12.00 8.40 0.72 9.12 0.89 8.11
Grid 4-4 1.00 4.00 16.00 8.40 0.96 37.42 1.58 59.12
1.00 1.00 12.00 8.40 0.72 9.12 0.89 8.11 ###
Cantilever beam 1.00 4.00 16.00 5.39 0.96 25.40 1.58 40.13
1.00 1.00 12.00 5.39 0.72 6.11 0.89 5.44 ###
Extra Bar
Grid A-A 1.00 2.00 12.00 7.23 0.00 14.46 0.89 12.87 ###
Grid B-B 1.00 2.00 12.00 7.23 0.00 14.46 0.89 12.87
Grid C-C 1.00 2.00 12.00 1.95 0.00 3.90 0.89 3.47
Grid 1-1 1.00 2.00 12.00 2.82 0.00 5.64 0.89 5.02
Grid 2-2 1.00 2.00 12.00 3.12 0.00 6.24 0.89 5.55
Grid 3-3 1.00 2.00 12.00 5.82 0.00 11.64 0.89 10.36
Grid 4-4 1.00 2.00 12.00 5.82 0.00 11.64 0.89 10.36
Sub-Total 539.94 Kg
iv Strirups
Slab Beam
Grid A-A 1.00 95.00 8.00 1.06 0.00 100.70 0.39 39.27 ###
Grid B-B 1.00 95.00 8.00 1.06 0.00 100.70 0.39 39.27 ###
Grid C-C 1.00 28.00 8.00 1.06 0.00 29.68 0.39 11.58 ###
Grid 1-1 1.00 38.00 8.00 1.06 0.00 40.28 0.39 15.71 ###
Grid 2-2 1.00 38.00 8.00 1.06 0.00 40.28 0.39 15.71 ###
Grid 3-3 1.00 67.00 8.00 1.06 0.00 71.02 0.39 27.70 ###
Grid 4-4 1.00 67.00 8.00 1.06 0.00 71.02 0.39 27.70 ###
Cantilever beam 1.00 45.00 8.00 1.06 0.00 47.70 0.39 18.60 ###
Sill Tie (C- hook) ###
Grid A-A 1.00 50.00 8.000 0.350 0.00 17.50 0.39 6.83 ###
Cantilever Portion 1.00 30.00 8.000 0.350 0.00 10.50 0.39 4.10 ###
Grid B-B 1.00 50.00 8.000 0.350 0.00 17.50 0.39 6.83 ###
Grid C-C 1.00 18.00 8.000 0.350 0.00 6.30 0.39 2.46 ###
Grid 1-1 1.00 26.00 8.000 0.350 0.00 9.10 0.39 3.55 ###
Grid 2-2 1.00 20.00 8.000 0.350 0.00 7.00 0.39 2.73 ###
Grid 3-3 1.00 37.00 8.000 0.350 0.00 12.95 0.39 5.05 ###
Grid 4-4 1.00 41.00 8.000 0.350 0.00 14.35 0.39 5.60
Grid B3-B4 1.00 18.00 8.000 0.350 0.00 6.30 0.39 2.46
Toilet wall 1.00 20.00 8.000 0.350 0.00 7.00 0.39 2.73 ###
#REF!
#REF!
Lap
Total L Unit
S.N Item of Work Number Nos. Dia Length length@6 Total/kg Remarks
in m Weight
0d
Account office 1.00 12.00 8.000 0.350 0.00 4.20 0.39 1.64 ###
Lintel Tie
Grid A-A 1.00 50.00 8.000 0.350 0.00 17.50 0.39 6.83 ###
Cantilever Portion 1.00 30.00 8.000 0.350 0.00 10.50 0.39 4.10 ###
Grid B-B 1.00 50.00 8.000 0.350 0.00 17.50 0.39 6.83 ###
Grid C-C 1.00 18.00 8.000 0.350 0.00 6.30 0.39 2.46 ###
Grid 1-1 1.00 26.00 8.000 0.350 0.00 9.10 0.39 3.55 ###
Grid 2-2 1.00 26.00 8.000 0.350 0.00 9.10 0.39 3.55 ###
Grid 3-3 1.00 37.00 8.000 0.350 0.00 12.95 0.39 5.05 ###
Grid 4-4 1.00 48.00 8.000 0.350 0.00 16.80 0.39 6.55
Grid B3-B4 1.00 18.00 8.000 0.350 0.00 6.30 0.39 2.46
Toilet wall 1.00 25.00 8.000 0.350 0.00 8.75 0.39 3.41 ###
Account office 1.00 19.00 8.000 0.350 0.00 6.65 0.39 2.59 ###
Sub-Total 286.85 Kg
Total Reinforcement in First Floor Beam 937.75 Kg
vi Slab
Main Bar
IN X DIRECTION
Bottom Bar 1.00 17.00 8.00 2.71 0.00 46.07 0.39 17.97
Bottom Bar 1.00 17.00 8.00 6.20 0.00 105.40 0.39 41.11
Bottom Bar 1.00 17.00 8.00 4.46 0.00 75.74 0.39 29.54
Bottom Bar 1.00 17.00 8.00 4.46 0.00 75.74 0.39 29.54
Bottom Bar 1.00 16.00 8.00 4.91 0.00 78.56 0.39 30.64
Bottom Bar 1.00 16.00 8.00 6.00 0.00 96.00 0.39 37.44
IN Y DIRECTION
Bottom Bar 1.00 22.00 8.00 7.44 0.00 163.57 0.39 63.79
Bottom Bar 1.00 22.00 8.00 9.15 0.00 201.30 0.39 78.51
Bottom Bar 1.00 21.00 8.00 2.88 0.00 60.48 0.39 23.59
Bottom Bar 1.00 21.00 8.00 4.26 0.00 89.46 0.39 34.89
IN X DIRECTION
Top Bar 2.00 62.00 8.00 1.75 0.00 216.38 0.39 84.39
Top Bar 1.00 30.00 8.00 3.22 0.00 96.45 0.39 37.62
Top Bar 1.00 30.00 8.00 1.09 0.00 32.70 0.39 12.75
IN Y DIRECTION
Top Bar 1.00 43.00 8.00 1.72 0.00 73.75 0.39 28.76
Top Bar 1.00 43.00 8.00 2.70 0.00 116.10 0.39 45.28
Top Bar 1.00 43.00 8.00 1.95 0.00 83.85 0.39 32.70
Top Bar 1.00 41.00 8.00 1.02 0.00 41.62 0.39 16.23
Top Bar 1.00 41.00 8.00 1.38 0.00 56.66 0.39 22.10
Inclined slab
Bottom Bar 1.00 8.00 8.00 34.87 0.00 278.96 0.39 108.79
Bottom Bar 1.00 233.00 8.00 1.14 0.00 265.62 0.39 103.59
#REF!
#REF!
Lap
Total L Unit
S.N Item of Work Number Nos. Dia Length length@6 Total/kg Remarks
in m Weight
0d
Grid 2-2 1.00 2.00 10.000 2.900 0.00 5.80 0.62 3.60 ###
Grid 3-3 1.00 2.00 10.000 2.900 0.00 5.80 0.62 3.60 ###
Grid 4-4 1.00 2.00 10.000 3.900 0.00 7.80 0.62 4.84 ###
Grid B3-B4 1.00 2.00 10.000 1.700 0.00 3.40 0.62 2.11 ###
Sub-Total 28.84 Kg
ii Lintel Tie
Grid A-A 1.00 2.00 10.000 3.700 0.00 7.40 0.62 4.59 ###
Cantilever Portion 1.00 2.00 10.000 4.460 0.00 8.92 0.62 5.53 ###
Grid B-B 1.00 2.00 10.000 3.700 0.00 7.40 0.62 4.59 ###
Grid 2-2 1.00 2.00 10.000 3.900 0.00 7.80 0.62 4.84 ###
Grid 3-3 1.00 2.00 10.000 3.900 0.00 7.80 0.62 4.84 ###
Grid 4-4 1.00 2.00 10.000 3.900 0.00 7.80 0.62 4.84 ###
Grid B3-B4 1.00 2.00 10.000 2.700 0.00 5.40 0.62 3.35 ###
Sub-Total 32.56 Kg
iii Slab Beam Cantilever Portion
Grid A-A 1.00 4.00 16.00 7.70 0.96 34.62 1.58 54.70 Grid B-B
1.00 1.00 12.00 7.70 0.72 8.42 0.89 7.49 Grid C-C
Grid B-B 1.00 4.00 16.00 7.70 0.96 34.62 1.58 54.70 Grid 1-1
1.00 1.00 12.00 7.70 0.72 8.42 0.89 7.49 Grid 2-2
Grid 2-2 1.00 4.00 16.00 4.90 0.96 23.42 1.58 37.00 ount office
1.00 1.00 12.00 4.90 0.72 5.62 0.89 5.00
Grid 3-3 1.00 4.00 16.00 8.40 0.96 37.42 1.58 59.12
1.00 1.00 12.00 8.40 0.72 9.12 0.89 8.11
Grid 4-4 1.00 4.00 16.00 8.40 0.96 37.42 1.58 59.12
1.00 1.00 12.00 8.40 0.72 9.12 0.89 8.11 Grid A-A
Cantilever beam 1.00 4.00 16.00 5.39 0.96 25.40 1.58 40.13 ver Portion
1.00 1.00 12.00 5.39 0.72 6.11 0.89 5.44 Grid B-B
Extra Bar Grid 2-2
Grid A-A 1.00 2.00 12.00 4.50 0.00 9.00 0.89 8.01 Grid 3-3
Grid B-B 1.00 2.00 12.00 4.50 0.00 9.00 0.89 8.01 Grid 4-4
Grid 2-2 1.00 2.00 12.00 3.12 0.00 6.24 0.89 5.55
Grid 3-3 1.00 2.00 12.00 5.82 0.00 11.64 0.89 10.36
Grid 4-4 1.00 2.00 12.00 5.82 0.00 11.64 0.89 10.36
Sub-Total 388.71 Kg
iv Strirups
Slab Beam
Grid A-A 1.00 62.00 8.00 1.06 0.00 65.72 0.39 25.63 ###
Grid B-B 1.00 62.00 8.00 1.06 0.00 65.72 0.39 25.63 ###
Grid 2-2 1.00 38.00 8.00 1.06 0.00 40.28 0.39 15.71 ###
Grid 3-3 1.00 67.00 8.00 1.06 0.00 71.02 0.39 27.70 ###
Grid 4-4 1.00 67.00 8.00 1.06 0.00 71.02 0.39 27.70 ###
Cantilever beam 1.00 45.00 8.00 1.06 0.00 47.70 0.39 18.60 ###
#REF!
#REF!
Lap
Total L Unit
S.N Item of Work Number Nos. Dia Length length@6 Total/kg Remarks
in m Weight
0d
Grid 4-4 1.00 26.00 8.000 0.350 0.00 9.10 0.39 3.55 ###
Grid B3-B4 1.00 18.00 10.000 0.350 0.00 6.30 0.39 2.46 ###
Sub-Total 186.56 Kg
Total Reinforcement in Second Floor Beam 636.67 Kg
v Slab
IN X DIRECTION
Bottom Bar 1.00 31.00 8.00 3.70 0.00 114.61 0.39 44.70
Bottom Bar 1.00 31.00 8.00 3.70 0.00 114.61 0.39 44.70
IN Y DIRECTION
Bottom Bar 1.00 22.00 8.00 6.98 0.00 153.63 0.39 59.91
Bottom Bar 1.00 22.00 8.00 6.98 0.00 153.63 0.39 59.91
IN X DIRECTION
Top Bar 2.00 61.00 8.00 2.38 0.00 289.75 0.39 113.00
IN Y DIRECTION
Top Bar 2.00 43.00 8.00 2.32 0.00 199.09 0.39 77.65
Top Bar 1.00 43.00 8.00 2.33 0.00 100.19 0.39 39.07
Inclined slab
Bottom Bar 1.00 8.00 8.00 30.53 0.00 244.24 0.39 95.25
Bottom Bar 1.00 204.00 8.00 1.14 0.00 232.56 0.39 90.70
Total Reinforcement in Second Floor Slab 624.89 Kg
7 Staircase
Slab buttom+Waist slab top 4.00 8.00 12.00 2.53 0.00 80.96 0.89 72.05
Slab buttom+Waist slab top 4.00 17.00 10.00 1.20 0.00 81.60 0.62 50.59
Junction(R+T) 4.00 9.00 10.00 1.20 0.00 43.20 0.62 26.78
Waist slab Buttom+slab top 4.00 8.00 12.00 5.80 0.00 185.54 0.89 165.13
Waist slab Buttom+slab top 4.00 39.00 10.00 1.20 0.00 187.20 0.62 116.06
Slab buttom+Waist slab top 4.00 8.00 12.00 1.65 0.00 52.90 0.89 47.08
Slab buttom+Waist slab top 4.00 12.00 10.00 1.20 0.00 57.60 0.62 35.71
#REF!
#REF!
S. N. Description No Length Breadth Height Quantity Remarks
#REF!
#REF!
S. N. Description No Length Breadth Height Quantity Remarks
Ground Floor 29.00 29.00
Total 29.00 Nos.
15 mm comode CP water spray with 1.2mt. Long
flexiable pipe.
Ground Floor 12.00 12.00
Total 12.00 Nos.
Stainless steel shower wth sliding bar and complete
set
Ground Floor 12.00 12.00
Total 12.00 Nos.
CP Wall mixture
Ground Floor 4.00 4.00
Total 4.00 Nos.
7 Valves with all complete accessories.
GM Gate valve 50 mm dia. 1.00 1.00
Total 1.00 Nos.
(G.M.) check valve 50 mm dia 1.00 1.00
Total 1.00 Nos.
Supplying and Fixing UPVC pipe all complete set as
8 per specification and instruction. (Panchakanya ,
Prince,Supreme )
75mm PVC pipe of 6 kg/cm2
Ground Floor 130.00 130.00
Total 130.00 Rm
110mm PVC pipe of 6 kg/cm2
Ground Floor 80.00 80.00
Total 80.00 Rm
#REF!
#REF!
S. N. Description No Length Breadth Height Quantity Remarks
Total 18.00 Nos.
75 mm dia UPVC 90 degree bend.
Ground Floor 7.00 7.00
Total 7.00 Nos.
75 mm dia UPVC Y bend.
Ground Floor 5.00 5.00
Total 5.00 Nos.
75 mm dia UPVC 45˚ bend.
Ground Floor 4.00 4.00
Total 4.00 Nos.
75 mm dia UPVC pipe clip
Ground Floor 110.00 110.00
Total 110.00 Nos.
110 mm dia UPVC plain /door Tee.
Ground Floor 6.00 6.00
Total 6.00 Nos.
110 mm dia UPVC 90 degree bend
Ground Floor 8.00 8.00
Total 8.00 Nos.
110 mm dia UPVC Y bend.
Ground Floor 10.00 10.00
Total 10.00 Nos.
110 mm dia UPVC 45˚ bend.
Ground Floor 8.00 8.00
Total 8.00 Nos.
110 mm dia UPVC pipe clip
Ground Floor 55.00 55.00
Total 55.00 Nos.
PVC floor trap 11x7.5 cm.
Ground Floor 18.00 18.00
Total 18.00 Nos.
Supplying and Fixing Indian pattern bathroom
11
accessories all complete set.
Modi guard bevelled float mirror 6mm thick with
stainfree 0.45x0.60m and bracket all compete set.
Ground Floor 14.00 14.00
Total 14.00 Nos.
Chrome plate type toilet paper holder.
Ground Floor 12.00 12.00
Total 12.00 Nos.
Chrome plated soap tray.
Ground Floor 12.00 12.00
Total 12.00 Nos.
CP 15mm dia x450mm long towel rod.
Ground Floor 11.00 11.00
Total 11.00 Nos.
Kitchen sink 37" long and 8"deep with sink cock all
completed set
Ground Floor 1.00 1.00
Total 1.00 Nos.
#REF!
#REF!
S. N. Description No Length Breadth Height Quantity Remarks
1.00 1.00
Total 1.00 Set
#REF!
###
S.No. DESCRIPTION OF WORKS UNIT QTY. Remarks
1.Wiring of light/fan & power points:
1.10 Supply of materials and wiring with PVC Insulated copper wire
in NS Approved HDP conduit without any joint in middle of the
span with necessary connecting, fixing, insulating and jointing
materials as per drawing and specification complete (wire:
Trishakti, Pioneer, Litmus)
1.1 Light/ Fan Points
{a} Light and Fan point with 2x1.5 Sq. mm from point to
switches and 2x2.5+1.1.5 as Light circuit laying from Switch to
DB NS mark cu multistrand cable Including all necessary items
i.e. bends, circular & Junction boxes etc.
point 111
{b} 2 Way light point with 3x1.5 Sq. mm from point to switches
and 2x2.5+1.1.5 as Light circuit laying from Switch to DB NS
mark cu multistrand cable Including all necessary items i.e.
bends, circular & Junction boxes etc. point 4
{c} High and Medium bay, Flood Light point with 2x2.5 sq.
mm/equivalent cu cable, bends, circular & junction Boxes point 71
1.2 Power Points
{a} 5/6 pin 6 x 16 A general outlet point with 2x 4+1x2.5 sq. mm
/ equivalent cu cable, bends, circular & Junction Boxes point 40
1.3 Outdoor Light Points
{a} Outdoor Street Pole Light point with 3x4.0 Sq. mm Armored
cu cable, bends, circular & Junction boxes point 4
{b} Outdoor Post top Light point with 3x2.5 Sq. mm cu cable,
bends, circular & Junction boxes with civil foundation point 2
2. Light Fixtures:
Supply of light fixtures, fixing, interconnection, testing and
commissioning complete with Holders, CFL, FTL, GLS,
electronic ballast, capacitor with all required mounting and
2.1 fixing accessories as per drawing
Brands: Philips,Wipro or Equivalent.
Indoor Lighting
{a} 2x36 Watt FTL Mirror optics fixture with EB Ballast surface
mounted (LT CS 001 HFB2) set 43
{b} Ceiling Dome Light with 11 watt CFL (CG 80 630) set 36
{c} Dust and jet proof 250W Integral enclosed type HPSV
Medium bay Light (BGEMB 250 SV) set 41
{d} Dust and jet proof 150W Integral enclosed type HPSV
Medium bay Light (BGEMB 150 SV) set 12
{e} Dust and jet proof 70W Integral enclosed type HPSV low
bay Light (BGELB 70 SV) set 14
{f} Black Powder coated Integral, die-cast housing 400W HPSV
Light (LT F1 004) set 4
{g} 14 Watt T8 FTL Picture/Mirror Light Fixture (as per
selection) set 8
{h} Weather proof half-head Light with 11 watt CFL (as per
selection) set 4
2.2 Outdoor Lighting
{a} 9 meter high street light metal pole with required civil works
complete set 4
#REF!
###
S.No. DESCRIPTION OF WORKS UNIT QTY. Remarks
{b} 70 watt HPSV dia cast sheet aluminum housing with lamp,
Ballast, Control gear, goose neck arm and 3x4 sqmm Cu Ar.
Cable as per drawing and specification (Philips- SRP 48/70(E),
CROMPTON- SSP1207 IH/WI, BAJAJ- BGEST 70 SV DD/02
70 SV or equivalent) set 4
{c} Post top Light fixture with 300 mm Unbreakable Clear Glass
with 18 W CFL Light and 1200 mm SS Stand with required Civil
works (LT GL 105) set 2
3. Fan Fixtures:
3.1 Supply of fan fixtures, fixing, interconnection, testing and
commissioning all complete as per drawing, specification and
instruction
Brands: Crompton, Bajaj or equivalent
220 v, 50 Hz, ceiling fan with J Hook and accessories,
capacitor 1200 mm dia, Heavy duty set 20
4. Switches and Sockets
4.10 Supply of switches, sockets as mentioned below, 18 SWG GI
metal boxes , screw, and other necessary materials with its
Installation, Interconnection and commissioning including civil
works as per drawing , specification all complete
#REF!
###
S.No. DESCRIPTION OF WORKS UNIT QTY. Remarks
6. Earthing System
6.10 Supply of materials and Installation of loke copper plate
(600x600x3.14 mm), salt, charcoal dust, 10 mm2 bare copper
cable with solid CAD weld ( Brazing) & watering 32 mm dia
PVC pipe & its installation in a whole of 90x90x250 cm with the
layers of Earthing materials as per standard, specification,
drawing and refilling the ground all complete
set 3
6.20 Supply and installation of 25*3 mm Copper Strip from roof trus
to Earthing station as Lightening protection and bonding of
metal roof to the earthing system kg 30
6.30 Supply and installation of 10 sq. mm bare copper wire with
necessary copper lugs and copper nut bolts connection with
Earthing system on each Electrical Closet as described on the
drawing rm 135
7. Electrical Panel & Distribution Boards
Supply, Delivery, Installation and Commissioning of the
following Distribution Board Including following equipment
housed in lockable, Double Door enclosure made from 16
SWG HRCA Sheet metal and the enclosure shall be finished at
least of two coats of red oxide metal primer and other two coats
of final epoxy enamel paint as per drawing and site condition
(shop drawing of all Distribution Boards shall submit to the
Consultant and get approval before starting the job)
#REF!
###
S.No. DESCRIPTION OF WORKS UNIT QTY. Remarks
32 A DP Switch - 9 set
#REF!
###
S.No. DESCRIPTION OF WORKS UNIT QTY. Remarks
7.60 Switch Panel - 2 set 1
40 A, TP MCCB -1 set
20 A, TP MCB -1 set
16 A SP MCB - 3 set
6 A SP MCB - 5 set
16 A DP Switch - 9 set
7.70 100A TPN 4 pole manual chnageover switch within metal
enclosure set-LS 1
8 Telephone System:
8.10 Supply of materials and wiring in NS approved 10 kg cm2 HDP
conduit concealed without any joint in middle of the span as per
drawing, specification all complete
{a} Telephone points with 3 Pair UTP Telephone cable point 6
8.20 Supply, installation and interconnection of Telephone/TV CDF
with 8 way Power pass booster, splitter for Coaxial and Solder
less crone for RJ-11 as per drawing, specifications all complete
with require power supply for Amplifier
#REF!
#REF!
SN Particulars Unit Quantity Rate Amount Remarks
A CIVIL WORKS
Site clearance before and after completion of work including
desposing the remaining construction materials & plants &
1 Job 1.00 50,000.00 50,000.00
making the site in working condition all complete as per
instruction of site Engineer.
Earthwork in excavation in Boulder mixed and hard soil in
foundation, trenches including timbering and shoring & 30m
2 Cum #REF! 492.75 #REF!
Lead and 1.5 m. lift all complete as per design, drawing,
specification and instruction of site Engineer.
Earthwork backfilling in 150 mm layers by ramming & watering
at required places as per instruction & disposing all surplus
3 Cum #REF! 301.01 #REF!
excavated materials within the site as per design, drawing,
specification and instruction of site Engineer all complete.
Supplying and filling in foundations and the area wherever
required below ground level and sides of the foundation and
walls with approved gravel sand (40:60) mixture in layers not
4 exceeding 150 mm thick, including well watering and Cum #REF! 3,583.11 #REF!
consolidation, leveling, loading, unloading and transportation
etc. complete, and as per specification, drawing and
instructions of Site Engineer.
Providing and laying machine mixed plain cement concrete
(1:3:6) using crushed coarse aggregates of 25 mm and down
size in foundation and under floors, steps, walls, platform etc.
including laying in layers of thickness not exceeding 150 mm
5 Cum #REF! 11,229.99 #REF!
and in alternative bays not exceeding 10 sqm including setting
out, mixing, compacting, curing and finishing etc. to approved
level, lines and dimension all complete as per specification,
drawing and instruction of Site Engineer.
Brickwork in cement sand mortar (1:4) in foundation up to plinth
level with approved quality first class chimney burnt bricks, with
minimum compressive strength of 70 k.g. per sq. cm., in perfect
6 line and level including soaking bricks in water, provision for Cum #REF! 13,229.50 #REF!
recesses, openings, toothings, packing the joints and curing the
work in all types and thickness of wall as per specification,
drawing and instruction of Site Engineer, all complete.
7 RCC Works
Providing and laying machine mixed/ batch plant mixed plain
cement concrete of M20 grade for R.C.C. works in slab, beam
etc in any form, size, shape and level with cement, sand and
7.1 crushed coarse aggregates of 20 mm/ 13 mm gauge including Cum #REF! 14,371.37 #REF!
setting out, mixing, compacting, curing, finishing and providing
construction / expansion joints, as per specification, drawing
and instruction of Site Engineer.
Providing and laying machine mixed/ batch plant mixed plain
cement concrete of M25 grade for R.C.C. works in column in
any form, size, shape and level with cement, sand and crushed
7.2 coarse aggregates of 20 mm/ 13 mm gauge including setting Cum #REF! 18,101.49 #REF!
out, mixing, compacting, curing, finishing and providing
construction / expansion joints, as per specification, drawing
and instruction of Site Engineer.
#REF!
#REF!
SN Particulars Unit Quantity Rate Amount Remarks
Providing, straightening, cleaning, cutting, fabricating, bending
and placing TMT Thermex steel reinforcement bars and binding
the bars with 18 gauge annealed wire for tying them at each
junction as per design and details for all types of RCC elements
7.3 including all waste and cut pieces, provision for spacers, chairs, Kg #VALUE! 113.39 #VALUE!
providing and placing cement mortar (1:1) cover blocks to keep
the bars in the intended position at all levels as per design,
drawing, specification and instruction of site engineer all
complete.
Formwork, centering and shuttering with 19 mm thick
waterproof plywood for all kinds of R.C.C. works of any shape,
size and at any level with necessary propping, scaffolding,
staging, supporting, cutting holes for utilization works, etc.
7.4
including providing final surface in correct and perfect line, level,
cleaning the surface and applying form oil and removal of forms
all complete as per specification, drawing and instruction of Site
Engineer.
Column Sqm #REF! 1,405.30 #REF!
Beam Sqm #REF! 958.71 #REF!
8 Flooring Works
Earth filling in 300 mm thick layer, watering, ramming including
8.1 supply of filling materials all complete as per design, drawing, Cu.m #REF! 301.01 #REF!
specification and instruction of Site Engineer
Sand filling in flooring including supply of filling materials,
8.2 watering, ramming etc. all complete as per design, drawing, Cu.m #REF! 3,583.11 #REF!
specification and instruction of site Engineer
Providing and laying one layer of flat brick soling in foundation
and floor with approved quality chimney burnt bricks in perfect
8.3 sqm #REF! 1,078.41 #REF!
line and level, including filling the voids with sand as per design,
drawing, specification and instruction of site Engineer
75mm thick P.C.C. (1:2:4) for flooring with approved quality of
cement & sand and crushed stone aggregate including mixing,
8.4 Sq. m #REF! 1,037.26 #REF!
laying and compacting and curing etc all complete as per
design, drawing, specification and instruction of site Engineer
38 mm thick P.C.C. (1:2:4) for flooring with approved quality of
cement & sand and crushed stone aggregate including mixing,
laying and compacting including rubbing with steel trowel to a
8.5 Sqm #REF! 609.26 #REF!
hard, smooth and shining surface and curing etc all complete as
per design, drawing, specification and instruction of site
Engineer
3 mm thick cement sand punning on floor, skriting, dado etc,
including mixing laying and rubbing with steel trowel to a hard,
8.6 Sqm #REF! 237.37 #REF!
smooth and shining surface and curing all complete as per
design, drawing, specification and instruction of site Engineer
Providing and laying 8 mm thick non slip ceramic tiles (Spartek,
Kajaria, or approved equivalent) of approved colour, shade and
size on floor in perfect line and level on 20 mm thick base
8.7 Sqm #REF! 3,954.66 #REF!
cement sand mortar (1:4) and jointed with white cement slurry
mixed with pigment to match the shade of the tile complete as
per specification, drawing and instruction of Site Engineer.
Total #REF!
#REF!
#REF!
SN Particulars Unit Quantity Rate Amount Remarks
A CIVIL WORKS
Brickwork in cement sand mortar (1:4) in foundation above plinth
level with approved quality first class chimney burnt bricks, with
minimum compressive strength of 70 k.g. per sq. cm., in perfect
1 line and level including soaking bricks in water, provision for Cum #VALUE! 13,537.47 #VALUE!
recesses, openings, toothings, packing the joints and curing the
work in all types and thickness of wall as per specification,
drawing and instruction of Site Engineer, all complete.
2 RCC Works
Providing and laying machine mixed/ batch plant mixed plain
cement concrete of M20 grade for R.C.C. works in slab, beam
etc in any form, size, shape and level with cement, sand and
2.1 crushed coarse aggregates of 20 mm/ 13 mm gauge including Cum #VALUE! 14,371.37 #VALUE!
setting out, mixing, compacting, curing, finishing and providing
construction / expansion joints, as per specification, drawing and
instruction of Site Engineer.
Providing and laying machine mixed/ batch plant mixed plain
cement concrete of M25 grade for R.C.C. works in column in
any form, size, shape and level with cement, sand and crushed
2.2 coarse aggregates of 20 mm/ 13 mm gauge including setting Cum #VALUE! 18,101.49 #VALUE!
out, mixing, compacting, curing, finishing and providing
construction / expansion joints, as per specification, drawing and
instruction of Site Engineer.
Providing, straightening, cleaning, cutting, fabricating, bending
and placing TMT Thermex steel reinforcement bars and binding
the bars with 18 gauge annealed wire for tying them at each
junction as per design and details for all types of RCC elements
2.3 including all waste and cut pieces, provision for spacers, chairs, Kg #VALUE! 113.39 #VALUE!
providing and placing cement mortar (1:1) cover blocks to keep
the bars in the intended position at all levels as per design,
drawing, specification and instruction of site engineer all
complete.
Formwork, centering and shuttering with 19 mm thick waterproof
plywood for all kinds of R.C.C. works of any shape, size and at
any level with necessary propping, scaffolding, staging,
supporting, cutting holes for utilization works, etc. including
2.4
providing final surface in correct and perfect line, level, cleaning
the surface and applying form oil and removal of forms all
complete as per specification, drawing and instruction of Site
Engineer.
Column Sqm #VALUE! 1,405.30 #VALUE!
Beam Sqm #VALUE! 958.71 #VALUE!
Slab Sqm #REF! 758.04 #REF!
3 Plaster Works
12.5mm thick cement sand plaster in (1:4) ratio on ceiling with
good finish including supplying of approved quality of cement &
sand, chiping the concrete surface, wetting the surfaces &
3.1 Sqm #REF! 381.90 #REF!
curing the work all complete including necessary single or
multiple stage scaffolding at all heights. as per the design,
drawing, specification and instruction of site engineer.
12.5mm thick cement sand plaster in (1:4) ratio on wall with
good finish including supplying of approved quality of cement &
sand, racking the joint, Chiping the concerte surface, wetting of
3.2 Sqm #VALUE! 332.97 #VALUE!
surfaces & curing the work all complete including necessary
single or multiple stage scaffolding at all heights. as per the
design, drawing, specification and instruction of site engineer.
4 Aluminium Door / Windows
#REF!
#REF!
SN Particulars Unit Quantity Rate Amount Remarks
Providing and fixing aluminium doors, windows and ventilators
assembled using colour anodized sections manufactured by
"AGRANI" or equivalent, fabricated as per drawings and fixed at
all levels, elevations and heights. The aluminium extruded
sections shall be anodized of approved colour with anodic film of
not less than 20 microns. Rate shall include to provide 5.0 mm
thick clear float glass/ tinted coloured glass/ milky glass of
approved make and 9 mm thick both side melamine laminated
high pressure particle board wherever required with snap fit
aluminium colour anodized beading with special water proof
cascades, neoprene etc. complete, as per specification, drawing
and instruction of Site Engineer.
Single/Double panel casement hinge door of section 101*45*1.5
4.1 Sq.m #VALUE! 7,553.38 #VALUE!
with 5mm glass
Sliding cum fix window of section 101*45*1.5 with 5mm glass
4.2 Sqm #VALUE! 6,465.58 #VALUE!
with net shutter
Supplying and fixing of MS grill of 4.5x20mm MS plate frame
and 12x12mm solid core square rod including metal primer paint
5 Sqm #VALUE! 2,564.62 #VALUE!
all complete as per design, drawing and instruction of site
engineer.
6 Flooring Works
38 mm thick P.C.C. (1:2:4) for flooring with approved quality of
cement & sand and crushed stone aggregate including mixing,
6.1 laying and compacting including rubbing with steel trowel to a Sqm #REF! 609.26 #REF!
hard, smooth and shining surface and curing etc all complete as
per drawing, specification in approval of site engineer
Providing and laying 8 mm thick glazed ceramic tiles (Spartek,
Kajaria, or approved equivalent) of approved shade, size and
pattern on wall in perfect line and level on 12.5 mm thick base
6.2 cement sand mortar (1:4) and jointed with cement slurry mixed Sqm #REF! 3,954.66 #REF!
with pigment to match the shade of the tile including adhesive
chemical all complete as per specification, drawing and
instruction of Site Engineer.
Providing and laying 16 mm thick granite from Rajasthan, India
of approved quality on wash basin with 30 mm thick cement
6.3 mortar (1:4) including cutting to the required shape, moulding Sqm #REF! 4,315.46 #REF!
and polishing all complete, as per specification, drawing and
instruction of Site Engineer.
Providing and laying 16 mm thick marble from Rajasthan, India
of approved quality on floors, staircase, parapet etc. with 30 mm
6.4 thick cement mortar (1:4) including cutting to the required shape, Sqm #VALUE! 4,315.46 #VALUE!
moulding and polishing all complete, as per specification,
drawing and instruction of Site Engineer.
6.5 Parqueting Sqm #REF! 3,000.00 #REF!
6 Painting Works
Providing and applying two coats of plastic emulsion paint of
approved brand and colour with one coat of primer including
preparation of surface through cleaning as per specification and
6.1 Sqm #VALUE! 269.63 #VALUE!
making good all small holes of nails, open joints and minor
defects of every kind after application of primer coat as per
specification and instruction of Site Engineer.
Providing and applying two coats of weather proof exterior
emulsion paint of approved brand and colour on the external
facade with one coat of primer including preparation of surface
6.2 through cleaning as per specification and making good all small Sqm #VALUE! 288.95 #VALUE!
holes of nails, open joints and minor defects of every kind after
application of primer coat as per specification and instruction of
Site Engineer.
#REF!
#REF!
SN Particulars Unit Quantity Rate Amount Remarks
7 Stainless Steel Railing Works
Providing and fixing stainless steel railing of 50mm dia vertical
post and hand rail, 25mm dia three layer horizontal pipe all
Rm #VALUE! 3831.04 #VALUE!
complete as per specification, drawing and instruction of Site
Engineer.
8 Roofing Works -
8.1 Truss Kg #REF! 154.72 #REF!
Providing, laying and fixing carbon fiber UPVC roofing sheet
with necessary bolts, J hooks, washers, including necessary
8.2 Sqm #REF! 1600.00 #REF!
overlaps, all complete as per specification, drawing and
instruction of Site Engineer. (5-5.5 Kg/sqm)
Total #VALUE!
#REF!
#REF!
SN Particulars Unit Quantity Rate Amount Remarks
Earthwork in excavation in Boulder mixed and hard soil in
foundation, trenches including timbering and shoring &
1 Cum 2.47 492.75 1,217.10
30m Lead and 1.5 m. lift all complete as per design,
drawing, specification and instruction of site engineer.
Flat brick soling work in foundation with supplying of
approved quality of stone laying, ramming and levelling
2 Sq.m. 1.15 1078.41 1,240.18
including filling in the joints with sand as per design,
drawing, specification and instruction of site engineer
Brick masonry work in 1:4 C/S mortar with approved
quality of hammer dressed bond/block stone in perfect line,
layer, plumb and finishing including racking the joints and
3 Cu.m. 1.43 13229.50 18,918.19
curing the work for at least 7 days etc.all complete as per
design, drawing, specification and instruction of site
engineer.
Sand filling in side of wall including supply of filling
4 materials, watering, ramming etc. all complete as per Cu.m. 0.70 3583.11 2,508.18
drawing, specification in approval of site engineer
5 RCC Work
Plain cement Concrete (PCC) in 1:1.5:3 ratio (M20) for
RCC works in counter slab etc. with approved quality of
cement and sand and stone aggregate including mixing,
5.1 Cum 0.113 14371.37 1,619.24
laying, compacting and curing etc all complete as per
design, drawing, specification and instruction of site
engineer.
Steel reinforcement bar of Fe 415/500 grade including
straightening, cleaning, cutting, bending, placing in position
6 and binding with annealed binding wire all complete as per kg 17.69 113.39 2,005.87
design, drawing, specification and instruction of site
engineer.
Formwork, shuttering, centering with 19mm thick
waterproof ply board and steel post necessary propping,
scaffolding, staging, supporting inclusive of wedging and
7 Sqm 3.50 758.04 2,651.97
cutting holes for utilization till the support if fully unyielding
nett as per drawing, specification in approval of site
engineer
Total 30,160.73
#REF!
#REF!
SN Particulars Unit Quantity Rate Amount Remarks
Earthwork in excavation in Boulder mixed and hard soil in
foundation, trenches including timbering and shoring & 30m Lead
1 and 1.5 m. lift all complete as per design, drawing, specification Cu.m 7.53 492.75 3,710.41
and instruction of site engineer.
Flate brick soling work in foundation with supplying of approved
quality of stone laying, ramming and levelling including filling in the
2 Sq m 4.03 1078.41 4,346.00
joints with sand as per design, drawing, specification and
instruction of site engineer
3 RCC Works
Plain cement Concrete (PCC) in 1:1.5:3 ratio (M20) for RCC works
in counter slab etc. with approved quality of cement and sand and
3.1 stone aggregate including mixing, laying, compacting and curing Cu.m 0.84 14371.37 12,071.96
etc all complete as per design, drawing, specification and
instruction of site engineer.
Steel reinforcement bar of Fe 415/500 grade including
straightening, cleaning, cutting, bending, placing in position and
4 kg 59.28 113.39 6,721.76
binding with annealed binding wire all complete as per design,
drawing, specification and instruction of site engineer.
Formwork, shuttering, centering with 19mm thick waterproof ply
board and steel post necessary propping, scaffolding, staging,
5 supporting inclusive of wedging and cutting holes for utilization till Sqm 4.22 758.04 3,198.93
the support if fully unyielding nett as per drawing, specification in
approval of site engineer
Brick masonry work in 1:4 C/S mortar with approved quality of
hammer dressed bond/block stone in perfect line, layer, plumb and
6 finishing including racking the joints and curing the work for at Cu.m 2.58 13229.50 34,132.11
least 7 days etc.all complete as per design, drawing, specification
and instruction of site engineer.
12.5mm thick cement sand plaster in (1:4) ratio on wall with good
finish including supplying of approved quality of cement & sand,
7 racking the joint, Chiping the concerte surface, wetting of surfaces Sqm 9.60 332.97 3,196.52
& curing the work all complete as per the design, drawing,
specification and instruction of site engineer.
3 mm thick cement sand punning on floor, skriting, dado etc,
including mixing laying and rubbing with steel trowel to a hard,
8 Sqm 9.60 237.37 2,278.76
smooth and shining surface and curing all complete as per
drawing, specification in approval of site engineer
Total 69,656.45
#REF!
#REF!
SN Particulars Unit Quantity Rate Amount Remarks
Earthwork in excavation in Boulder mixed and hard soil in
foundation, trenches including timbering and shoring & 30m
1 Lead and 1.5 m. lift all complete as per design, drawing, Cu.m 48.240 492.75 23,770.26
specification and instruction of site engineer.
Flat brick soling work in foundation with supplying of approved
quality of stone laying, ramming and levelling including filling in
2 the joints with sand as per design, drawing, specification and Sq m 2.670 1,078.41 2,879.36
instruction of site engineer
Plain cement Concrete (PCC) in 1:3:6 ratio for foundations
with supplying approved quality of cement, sand and stone
3 aggregate including mixing, laying, copmacting and curing etc Cu.m 0.27 11,229.99 3,032.10
all complete as per design, drawing, specification and
instruction of site
4 RCC Works
Plain cement Concrete (PCC) in 1:1.5:3 ratio (M20) for RCC
works in counter slab etc. with approved quality of cement and
4.1 sand and stone aggregate including mixing, laying, compacting Cu.m 0.090 14,371.37 1,293.43
and curing etc all complete as per design, drawing,
specification and ins
Steel reinforcement bar of Fe 415/500 grade including
straightening, cleaning, cutting, bending, placing in position
5 and binding with annealed binding wire all complete as per Kg 9.00 113.39 1,020.51
design, drawing, specification and instruction of site engineer.
Total 58,580.00
#REF!
#REF!
SN Particulars Unit Quantity Rate Amount Remarks
Earthwork in excavation in Boulder mixed and hard
soil in foundation, trenches including timbering and
1 shoring & 30m Lead and 1.5 m. lift all complete as Cum 28.13 492.75 13,861.06
per design, drawing, specification and instruction of
site engineer.
Earthwork backfilling in 150 mm layers by ramming &
watering at required places as per instruction &
2 Cum 8.44 301.01 2,540.52
disposing all surplus excavated materials within the
site all complete.
Flat brick soling work in foundation with supplying of
approved quality of stone laying, ramming and
3 levelling including filling in the joints with sand as per Sqm 14.78 1,078.41 15,938.90
design, drawing, specification and instruction of site
engineer
4 PCC Works
Plain cement Concrete (PCC) in 1:3:6 ratio for
foundations with supplying approved quality of
cement, sand and stone aggregate including mixing,
4.1 Cum 1.11 11,229.99 12,465.29
laying, copmacting and curing etc all complete as per
design, drawing, specification and instruction of site
engineer
5 RCC Works
#REF!
###
S.No. DESCRIPTION OF WORKS UNIT QTY. RATE AMOUNT
1.0 Wiring of light/fan & power points:
Supply of materials and wiring with PVC Insulated copper wire
in NS Approved HDP conduit without any joint in middle of the
span with necessary connecting, fixing, insulating and jointing
materials as per drawing and specification complete (wire:
Trishakti, Pioneer, Litmus)
{a} Light and Fan point with 2x1.5 Sq. mm from point to
switches and 2x2.5+1.1.5 as Light circuit laying from Switch to
DB NS mark cu multistrand cable Including all necessary items
i.e. bends, circular & Junction boxes etc.
point 111 1,309.82 145,389.66
{b} 2 Way light point with 3x1.5 Sq. mm from point to switches
and 2x2.5+1.1.5 as Light circuit laying from Switch to DB NS
mark cu multistrand cable Including all necessary items i.e.
bends, circular & Junction boxes etc. point 4 1,583.44 6,333.74
{c} High and Medium bay, Flood Light point with 2x2.5 sq.
mm/equivalent cu cable, bends, circular & junction Boxes point 71 1,745.22 123,910.41
1.2 Power Points
{a} 5/6 pin 6 x 16 A general outlet point with 2x 4+1x2.5 sq. mm
/ equivalent cu cable, bends, circular & Junction Boxes
point 40 1,950.92 78,036.70
1.3 Outdoor Light Points
{a} Outdoor Street Pole Light point with 3x4.0 Sq. mm Armored
cu cable, bends, circular & Junction boxes point 4 5,505.33 22,021.30
{b} Outdoor Post top Light point with 3x2.5 Sq. mm cu cable,
bends, circular & Junction boxes with civil foundation
point 2 2,388.00 4,776.00
Sub Total 380,467.81
2.0 Light Fixtures:
Supply of light fixtures, fixing, interconnection, testing and
commissioning complete with Holders, CFL, FTL, GLS,
electronic ballast, capacitor with all required mounting and
2.1 fixing accessories as per drawing
#REF!
###
S.No. DESCRIPTION OF WORKS UNIT QTY. RATE AMOUNT
{e} Dust and jet proof 70W Integral enclosed type HPSV low
bay Light (BGELB 70 SV) set 14 9,403.41 131,647.77
{f} Black Powder coated Integral, die-cast housing 400W HPSV
Light (LT F1 004) set 4 26,710.34 106,841.35
{g} 14 Watt T8 FTL Picture/Mirror Light Fixture (as per
selection) set 8 3,315.97 26,527.74
{h} Weather proof half-head Light with 11 watt CFL (as per
selection) set 4 885.71 3,542.83
2.2 Outdoor Lighting
{a} 9 meter high street light metal pole with required civil works
complete set 4 18,977.76 75,911.04
{b} 70 watt HPSV dia cast sheet aluminum housing with lamp,
Ballast, Control gear, goose neck arm and 3x4 sqmm Cu Ar.
Cable as per drawing and specification (Philips- SRP 48/70(E),
CROMPTON- SSP1207 IH/WI, BAJAJ- BGEST 70 SV DD/02
70 SV or equivalent) set 4 15,161.68 60,646.72
{c} Post top Light fixture with 300 mm Unbreakable Clear Glass
with 18 W CFL Light and 1200 mm SS Stand with required Civil
works (LT GL 105) set 2 7,802.08 15,604.17
Sub Total 1,487,248.44
3.0 Fan Fixtures:
3.1 Supply of fan fixtures, fixing, interconnection, testing and
commissioning all complete as per drawing, specification and
instruction
Brands: Crompton, Bajaj or equivalent
220 v, 50 Hz, ceiling fan with J Hook and accessories,
capacitor 1200 mm dia, Heavy duty set 20 4,137.30 82,745.95
Sub Total 82,745.95
4.0 Switches and Sockets
4.1 Supply of switches, sockets as mentioned below, 18 SWG GI
metal boxes , screw, and other necessary materials with its
Installation, Interconnection and commissioning including civil
works as per drawing , specification all complete
#REF!
###
S.No. DESCRIPTION OF WORKS UNIT QTY. RATE AMOUNT
{h} 5/6 pin 6/16 A switch socket set 40 713.15 28,525.98
Sub Total 64,032.18
#REF!
###
S.No. DESCRIPTION OF WORKS UNIT QTY. RATE AMOUNT
5.0 Power Cable
5.1 Supply, delivery, laying and connecting of the following
Armoured/unarmoured power cable including cable sockets,
pull boxes and necessary materials. chiselling of wall/ floors
and redoing the chiselled area with cement &sand mortar as
per drawing and site condition all complete.
#REF!
###
S.No. DESCRIPTION OF WORKS UNIT QTY. RATE AMOUNT
Supply, Delivery, Installation and Commissioning of the
following Distribution Board Including following equipment
housed in lockable, Double Door enclosure made from 16
SWG HRCA Sheet metal and the enclosure shall be finished at
least of two coats of red oxide metal primer and other two coats
of final epoxy enamel paint as per drawing and site condition
(shop drawing of all Distribution Boards shall submit to the
Consultant and get approval before starting the job)
#REF!
###
S.No. DESCRIPTION OF WORKS UNIT QTY. RATE AMOUNT
16 A SP MCB - 3 set
6 A SP MCB - 5 set
16 A DP Switch - 9 set
7.7 100A TPN 4 pole manual chnageover switch within metal
enclosure set-LS 1 12,112.37 12,112.37
Sub Total 283,807.35
#REF!
###
S.No. DESCRIPTION OF WORKS UNIT QTY. RATE AMOUNT
8.0 Telephone System:
8.1 Supply of materials and wiring in NS approved 10 kg cm2 HDP
conduit concealed without any joint in middle of the span as per
drawing, specification all complete
{a} Telephone points with 3 Pair UTP Telephone cable point 6 1,736.43 10,418.59
8.2 Supply, installation and interconnection of Telephone/TV CDF
with 8 way Power pass booster, splitter for Coaxial and Solder
less crone for RJ-11 as per drawing, specifications all complete
with require power supply for Amplifier
#REF!
###
S.No. DESCRIPTION OF WORKS UNIT QTY. RATE AMOUNT
#REF!
#REF!
SN Particulars Quantity Unit Rate Amount Remarks
Supplying and Fixing Porcelain clay Indian Pattern Comode,
Rate
1 Porcelain clay Cistern and seat cover with pipe connector all 12.00 Set 26,057.85 312,694.20
Kathmandu
complete set.(Hindware, Parryware, or equivalent ).
Supplying and fixing White glaze Porcelain clay wash
basin/Oval 50X40Cm with pedestal, Mixture brackets 32mm
dia. p trap, 32mm CP waste coupling with CP chain and rubber
2 10.00 Set 10,550.10 105,501.00 "
plug, 15mmx450mm long c.p. pipe connector etc all complete.
(Sanitaryware:-Hindware,parryware or equivalent).Valve:-
jaquar,ark,Ess Ess or equivalent)
Supplying and fixing White glaze Porcelain clay
46.5x35.5x26.5cm flat back White glazed Urinal with sensor
valve, brackets 32mm dia. p trap, 32mm CP waste coupling
3
with CP chain and rubber plug, 15mmx450mm long c.p. pipe
connector etc all complete.(Sanitaryware:-Hindware,parryware
or equivalent).Valve:- jaquar,ark,Ess Ess or equivalent)
46.5x35.5x26.5 cm flat back White glazed Urinal all complete
8.00 Set 18,901.40 151,211.20 "
set.
68 X 30 Cm white glazed urinal Partation with all complete set 7.00 Set 2,910.65 20,374.55 "
Supplying and Fixing Pvc roof water tank With cover including
4 drain hole ,inlet outlet, over flow etc.all complete set .Hill take,
Roof top or equivalent
1000 litres PVC overhead tank 2.00 Nos. 18,771.45 37,542.90 "
Supplying and Fixing Electric moter Pump single or three phase
5 phase with base, nut and bolts all complete set (Kirloskar,
Compton, Servo, Sharp,)
2 HP Electric motor Pump monoblock.(crompton) 1.00 Nos. 32,190.80 32,190.80 "
Supplying and Fixing Indian pattern C.P. valves with wall flange
6
Including c.p. nipple all complete set.
15mm CP bib cock Cock ordinary type 21.00 Set 1,674.57 35,165.97 "
C.P. 15mm dia Angle valve. 29.00 Nos. 1,540.02 44,660.58 "
15 mm comode CP water spray with 1.2mt. Long flexiable pipe.
12.00 Nos. 1,690.73 20,288.76 "
Stainless steel shower wth sliding bar and complete set 12.00 Nos. 3,750.66 45,007.92 "
CP Wall mixture 4.00 Nos. 6,359.67 25,438.68 "
7 Valves with all complete accessories.
GM Gate valve 50 mm dia. 1.00 Nos. 2,068.04 2,068.04 "
(G.M.) check valve 50 mm dia 1.00 Nos. 5,151.36 5,151.36 "
Supplying and Fixing UPVC pipe all complete set as per
8
specification and instruction. (Panchakanya , Prince,Supreme )
75mm PVC pipe of 6 kg/cm2 130.00 Rm 473.80 61,594.00 "
110mm PVC pipe of 6 kg/cm2 80.00 Rm 875.20 70,016.00 "
Supplying and fixing PPR and GI Pipe. or equivalent with
fittings/ specials (Tees, elbows, Unions etc) clamps(m.s plate
with nut and bolt with hexagonal screws for clamp in
ceiling,wall), nails, including jointing materials,installation of
9
pipes and specials including making holes on walls or floor and
repairing the same to its original finish,cleaning of the system,
testing and ready for operation,. all complete set as per
specification and instruction.
15 mm dia P.P.R pipe 45.00 RM 118.45 5,330.25 "
20 mm dia P.P.R pipe 145.00 RM 118.45 17,175.25 "
25 mm dia P.P.R pipe 10.00 RM 162.80 1,628.00 "
Checked by
Prepared by Approved by
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
SN Particulars Quantity Unit Rate Amount Remarks
50 mm dia P.P.R pipe 70.00 RM 510.10 35,707.00 "
Supplying and Fixing UPVC specials with O ring rubber
washer,Pvc liquid(Solvent cement), Pvc cream, all complete set
10
as per specification and instruction.
(Panchakanya,Prince,Supreme )
75 mm dia UPVC vent cowl 1.00 Nos. 232.12 232.12 "
75 mm dia UPVC plain/door Tee. 18.00 Nos. 418.81 7,538.58 "
75 mm dia UPVC 90 degree bend. 7.00 Nos. 310.14 2,170.98 "
75 mm dia UPVC Y bend. 5.00 Nos. 382.59 1,912.95 "
75 mm dia UPVC 45˚ bend. 4.00 Nos. 285.99 1,143.96 "
75 mm dia UPVC pipe clip 110.00 Nos. 39.85 4,383.50 "
110 mm dia UPVC plain /door Tee. 6.00 Nos. 742.13 4,452.78 "
110 mm dia UPVC 90 degree bend 8.00 Nos. 538.06 4,304.48 "
110 mm dia UPVC Y bend. 10.00 Nos. 734.88 7,348.80 "
110 mm dia UPVC 45˚ bend. 8.00 Nos. 487.35 3,898.80 "
110 mm dia UPVC pipe clip 55.00 Nos. 50.72 2,789.60 "
PVC floor trap 11x7.5 cm. 18.00 Nos. 504.44 9,079.92 "
Supplying and Fixing Indian pattern bathroom accessories all
11
complete set.
Modi guard bevelled float mirror 6mm thick with stainfree
14.00 Nos. 2,052.11 28,729.54 "
0.45x0.60m and bracket all compete set.
Chrome plate type toilet paper holder. 12.00 Nos. 1,223.77 14,685.24 "
Chrome plated soap tray. 12.00 Nos. 741.92 8,903.04 "
CP 15mm dia x450mm long towel rod. 11.00 Nos. 851.34 9,364.74 "
Kitchen sink 37" long and 8"deep with sink cock all completed
1.00 Nos. 7,644.05 7,644.05 "
set
Fire pump:-20H.P.x2set or 40H.P. (Head-70.0mtr.,Discharge-
2400Lpm)Fire pump set with 5.0h.p Stainless steel verticle
jockey pump,(Main pump start Automatically If jockey pump
12 1.00 Set 640,561.50 640,561.50 "
pressure drop) including control panel board,Required
Cable,Stairner for both pump,pressure switches,pressure
guage all complete set,
Total 1,787,891.04
Checked by
Prepared by Approved by
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Quantity
Covered Hall Total
S. N. Description Unit Septic Soak Water
Sub- Super- Manhole Quantity
tank Pit Tank
Structure Structure
1.0 General Works
Site clearance before and after completion of work including desposing the remaining
1.1 construction materials & plants & making the site in working condition all complete as Job 1.00 1.00
per instruction of site Engineer.
2.0 Earthworks
Earthwork in excavation in Boulder mixed and hard soil in foundation, trenches
2.1 including timbering and shoring & 30m Lead and 1.5 m. lift all complete as per design, Cum #REF! 7.53 2.47 48.24 28.13 #REF!
drawing, specification and instruction of site Engineer.
Earthwork backfilling in 150 mm layers by ramming & watering at required places as per
2.2 instruction & disposing all surplus excavated materials within the site as per design, Cum #REF! 8.44 #REF!
drawing, specification and instruction of site Engineer all complete.
Supplying and filling in foundations and the area wherever required below ground level
and sides of the foundation and walls with approved gravel sand (40:60) mixture in
2.3 layers not exceeding 150 mm thick, including well watering and consolidation, leveling, Cum #REF! #REF!
loading, unloading and transportation etc. complete, and as per specification, drawing
and instructions of Site Engineer.
3.0 PCC Works
Providing and laying machine mixed plain cement concrete (1:3:6) using crushed coarse
aggregates of 25 mm and down size in foundation and under floors, steps, walls,
platform etc. including laying in layers of thickness not exceeding 150 mm and in
3.1 Cum #REF! 0.27 1.11 #REF!
alternative bays not exceeding 10 sqm including setting out, mixing, compacting, curing
and finishing etc. to approved level, lines and dimension all complete as per
specification, drawing and instruction of Site Engineer.
4.0 Brick Works
Brickwork in cement sand mortar (1:4) in foundation up to plinth level with approved
quality first class chimney burnt bricks, with minimum compressive strength of 70 k.g.
per sq. cm., in perfect line and level including soaking bricks in water, provision for
4.1 Cum #REF! 2.58 1.43 0.54 #REF!
recesses, openings, toothings, packing the joints and curing the work in all types and
thickness of wall as per specification, drawing and instruction of Site Engineer, all
complete.
#REF!
#REF!
Quantity
Covered Hall Total
S. N. Description Unit Septic Soak Water
Sub- Super- Manhole Quantity
tank Pit Tank
Structure Structure
Brickwork in cement sand mortar (1:4) in foundation above plinth level with approved
quality first class chimney burnt bricks, with minimum compressive strength of 70 k.g.
per sq. cm., in perfect line and level including soaking bricks in water, provision for
4.2 Cum #VALUE!
recesses, openings, toothings, packing the joints and curing the work in all types and
thickness of wall as per specification, drawing and instruction of Site Engineer, all
complete.
5.0 PCC for RCC Works
Providing and laying machine mixed/ batch plant mixed plain cement concrete of M20
grade for R.C.C. works in slab, beam etc in any form, size, shape and level with cement,
5.1 sand and crushed coarse aggregates of 20 mm/ 13 mm gauge including setting out, Cum #REF! #VALUE! 0.84 0.11 0.09 7.28 #REF!
mixing, compacting, curing, finishing and providing construction / expansion joints, as
per specification, drawing and instruction of Site Engineer.
Providing and laying machine mixed/ batch plant mixed plain cement concrete of M25
grade for R.C.C. works in column in any form, size, shape and level with cement, sand
5.2 and crushed coarse aggregates of 20 mm/ 13 mm gauge including setting out, mixing, Cum #REF! #VALUE! #REF!
compacting, curing, finishing and providing construction / expansion joints, as per
specification, drawing and instruction of Site Engineer.
Providing, straightening, cleaning, cutting, fabricating, bending and placing TMT
Thermex steel reinforcement bars and binding the bars with 18 gauge annealed wire for
tying them at each junction as per design and details for all types of RCC elements
5.3 Kg #VALUE! #VALUE! 59.28 17.69 9.00 869.88 #VALUE!
including all waste and cut pieces, provision for spacers, chairs, providing and placing
cement mortar (1:1) cover blocks to keep the bars in the intended position at all levels
as per design, drawing, specification and instruction of site engineer all complete.
Formwork, centering and shuttering with 19 mm thick waterproof plywood for all kinds of
R.C.C. works of any shape, size and at any level with necessary propping, scaffolding,
staging, supporting, cutting holes for utilization works, etc. including providing final
5.4
surface in correct and perfect line, level, cleaning the surface and applying form oil and
removal of forms all complete as per specification, drawing and instruction of Site
Engineer.
Column Sqm #REF! #VALUE! #REF!
#REF!
#REF!
Quantity
Covered Hall Total
S. N. Description Unit Septic Soak Water
Sub- Super- Manhole Quantity
tank Pit Tank
Structure Structure
Beam Sqm #REF! #VALUE! #REF!
Slab Sqm #REF! 4.22 3.50 5.76 45.18 #REF!
6.0 Flooring Works
Earth filling in 300 mm thick layer, watering, ramming including supply of filling materials
6.1 Cum #REF! #REF!
all complete as per design, drawing, specification and instruction of Site Engineer
Sand filling in flooring including supply of filling materials, watering, ramming etc. all
6.2 Cum #REF! 0.70 #REF!
complete as per design, drawing, specification and instruction of site Engineer
Providing and laying one layer of flat brick soling in foundation and floor with approved
6.3 quality chimney burnt bricks in perfect line and level, including filling the voids with sand Sqm #REF! 4.03 1.15 2.67 14.78
as per design, drawing, specification and instruction of site Engineer
75mm thick P.C.C. (1:2:4) for flooring with approved quality of cement & sand and
6.4 crushed stone aggregate including mixing, laying and compacting and curing etc all Sqm #REF! #REF!
complete as per design, drawing, specification and instruction of site Engineer
38 mm thick P.C.C. (1:2:4) for flooring with approved quality of cement & sand and
crushed stone aggregate including mixing, laying and compacting including rubbing with
6.5 Sqm #REF! #REF! #REF!
steel trowel to a hard, smooth and shining surface and curing etc all complete as per
design, drawing, specification and instruction of site Engineer
3 mm thick cement sand punning on floor, skriting, dado etc, including mixing laying and
6.6 rubbing with steel trowel to a hard, smooth and shining surface and curing all complete Sqm #REF! 9.60 26.43 57.73 #REF!
as per design, drawing, specification and instruction of site Engineer
7.0 Painting Works
Providing and applying two coats of plastic emulsion paint of approved brand and colour
with one coat of primer including preparation of surface through cleaning as per
7.1 specification and making good all small holes of nails, open joints and minor defects of Sqm #VALUE! #VALUE!
every kind after application of primer coat as per specification and instruction of Site
Engineer.
#REF!
#REF!
Quantity
Covered Hall Total
S. N. Description Unit Septic Soak Water
Sub- Super- Manhole Quantity
tank Pit Tank
Structure Structure
Providing and applying two coats of weather proof exterior emulsion paint of approved
brand and colour on the external facade with one coat of primer including preparation of
7.2 surface through cleaning as per specification and making good all small holes of nails, Sq.m. #VALUE! #VALUE!
open joints and minor defects of every kind after application of primer coat as per
specification and instruction of Site Engineer.
#REF!
#REF!
Quantity
Covered Hall Total
S. N. Description Unit Septic Soak Water
Sub- Super- Manhole Quantity
tank Pit Tank
Structure Structure
8.0 Plaster Works
12.5mm thick cement sand plaster in (1:4) ratio on ceiling with good finish including
supplying of approved quality of cement & sand, chiping the concrete surface, wetting
8.1 the surfaces & curing the work all complete including necessary single or multiple stage Sq. m #REF! 26.43 #REF!
scaffolding at all heights. as per the design, drawing, specification and instruction of
site engineer.
12.5mm thick cement sand plaster in (1:4) ratio on wall with good finish including
supplying of approved quality of cement & sand, racking the joint, Chiping the concerte
8.2 surface, wetting of surfaces & curing the work all complete including necessary single or Sq. m #VALUE! 9.60 57.73 #VALUE!
multiple stage scaffolding at all heights. as per the design, drawing, specification and
instruction of site engineer.
9.0 Aluminium Door / Windows
Providing and fixing aluminium doors, windows and ventilators assembled using colour
anodized sections manufactured by "AGRANI" or equivalent, fabricated as per drawings
and fixed at all levels, elevations and heights. The aluminium extruded sections shall be
anodized of approved colour with anodic film of not less than 20 microns. Rate shall
include to provide 5.0 mm thick clear float glass/ tinted coloured glass/ milky glass of
approved make and 9 mm thick both side melamine laminated high pressure particle
board wherever required with snap fit aluminium colour anodized beading with special
water proof cascades, neoprene etc. complete, as per specification, drawing and
instruction of Site Engineer.
9.1 Single/Double panel casement hinge door of section 101*45*1.5 with 5mm glass Sqm #VALUE! #VALUE!
9.2 Sliding cum fix window of section 101*45*1.5 with 5mm glass with net shutter Sqm #VALUE! #VALUE!
Supplying and fixing of MS grill of 4.5x20mm MS plate frame and 12x12mm solid core
9.3 square rod including metal primer paint all complete as per design, drawing and Sqm #VALUE! #VALUE!
instruction of site engineer.
10.0 Floor Finishing Works
#REF!
#REF!
Quantity
Covered Hall Total
S. N. Description Unit Septic Soak Water
Sub- Super- Manhole Quantity
tank Pit Tank
Structure Structure
Providing and laying 8 mm thick non slip ceramic tiles (Spartek, Kajaria, or approved
equivalent) of approved colour, shade and size on floor in perfect line and level on 20
10.1 mm thick base cement sand mortar (1:4) and jointed with white cement slurry mixed with Sq. m #REF! #REF!
pigment to match the shade of the tile complete as per specification, drawing and
instruction of Site Engineer.
Providing and laying 8 mm thick glazed ceramic tiles (Spartek, Kajaria, or approved
equivalent) of approved shade, size and pattern on wall in perfect line and level on 12.5
mm thick base cement sand mortar (1:4) and jointed with cement slurry mixed with Sq.m #REF! #REF!
pigment to match the shade of the tile including adhesive chemical all complete as per
10.2 specification, drawing and instruction of Site Engineer.
Providing and laying 16 mm thick granite from Rajasthan, India of approved quality on
wash basin with 30 mm thick cement mortar (1:4) including cutting to the required
10.3 Sq.m #REF! #REF!
shape, moulding and polishing all complete, as per specification, drawing and instruction
of Site Engineer.
Providing and laying 16 mm thick marble from Rajasthan, India of approved quality on
floors, staircase, parapet etc. with 30 mm thick cement mortar (1:4) including cutting to
Sq.m #VALUE!
the required shape, moulding and polishing all complete, as per specification, drawing
10.4 and instruction of Site Engineer. #VALUE!
10.5 Parqueting Sq.m #REF! #REF!
11.0 Railing Works
Providing and fixing stainless steel railing of 50mm dia vertical post and hand rail, 25mm
11.1 dia three layer horizontal pipe all complete as per specification, drawing and instruction R.m #VALUE!
of Site Engineer. #VALUE!
12.0 Roofing Works
12.1 Truss Kg #REF! #REF!
Providing, laying and fixing carbon fiber UPVC roofing sheet with necessary bolts, J
12.2 hooks, washers, including necessary overlaps, all complete as per specification, drawing Sq.m #REF!
and instruction of Site Engineer. (5-5.5 Kg/sqm) #REF!
#REF!
#REF!
Quantity
Covered Hall Total
S. N. Description Unit Septic Soak Water Rate Amount Remarks
Sub- Super- Manholes Quantity
tank Pit Tank
Structure Structure
1 General Works
Site clearance before and after completion of work including
desposing the remaining construction materials & plants &
1.1 Job 1.00 1.00 50,000.00 50,000.00
making the site in working condition all complete as per
instruction of site Engineer.
2 Earthworks
Earthwork in excavation in Boulder mixed and hard soil in
foundation, trenches including timbering and shoring & 30m
2.1 Cum #REF! 7.53 2.47 48.24 28.13 #REF! 492.75 #REF!
Lead and 1.5 m. lift all complete as per design, drawing,
specification and instruction of site Engineer.
Earthwork backfilling in 150 mm layers by ramming & watering
at required places as per instruction & disposing all surplus
2.2 Cum #REF! 8.44 #REF! 301.01 #REF!
excavated materials within the site as per design, drawing,
specification and instruction of site Engineer all complete.
Supplying and filling in foundations and the area wherever
required below ground level and sides of the foundation and
walls with approved gravel sand (40:60) mixture in layers not
2.3 exceeding 150 mm thick, including well watering and Cum #REF! #REF! 3,583.11 #REF!
consolidation, leveling, loading, unloading and transportation
etc. complete, and as per specification, drawing and
instructions of Site Engineer.
3 PCC Works
Providing and laying machine mixed plain cement concrete
(1:3:6) using crushed coarse aggregates of 25 mm and down
size in foundation and under floors, steps, walls, platform etc.
including laying in layers of thickness not exceeding 150 mm
3.1 Cum #REF! #REF! 11,229.99 #REF!
and in alternative bays not exceeding 10 sqm including setting
out, mixing, compacting, curing and finishing etc. to approved
level, lines and dimension all complete as per specification,
drawing and instruction of Site Engineer.
#REF!
#REF!
Quantity
Covered Hall Total
S. N. Description Unit Septic Soak Water Rate Amount Remarks
Sub- Super- Manholes Quantity
tank Pit Tank
Structure Structure
4 Brick Works
Brickwork in cement sand mortar (1:4) in foundation up to plinth
level with approved quality first class chimney burnt bricks, with
minimum compressive strength of 70 k.g. per sq. cm., in perfect
4.1 line and level including soaking bricks in water, provision for Cum #REF! 0.27 1.11 #REF! 13,229.50 #REF!
recesses, openings, toothings, packing the joints and curing the
work in all types and thickness of wall as per specification,
drawing and instruction of Site Engineer, all complete.
Brickwork in cement sand mortar (1:4) in foundation above
plinth level with approved quality first class chimney burnt
bricks, with minimum compressive strength of 70 k.g. per sq.
cm., in perfect line and level including soaking bricks in water,
4.2 Cum #VALUE! #VALUE! 13,537.47 #VALUE!
provision for recesses, openings, toothings, packing the joints
and curing the work in all types and thickness of wall as per
specification, drawing and instruction of Site Engineer, all
complete.
5 PCC for RCC Works
Providing and laying machine mixed/ batch plant mixed plain
cement concrete of M20 grade for R.C.C. works in slab, beam
etc in any form, size, shape and level with cement, sand and
5.1 crushed coarse aggregates of 20 mm/ 13 mm gauge including Cum #REF! #VALUE! #REF! 14,371.37 #REF!
setting out, mixing, compacting, curing, finishing and providing
construction / expansion joints, as per specification, drawing
and instruction of Site Engineer.
Providing and laying machine mixed/ batch plant mixed plain
cement concrete of M25 grade for R.C.C. works in column in
5.2 any form, size, shape and level with cement, sand and crushed Cum #REF! #VALUE! 2.58 1.43 0.54 #REF! 18,101.49 #REF!
coarse aggregates of 20 mm/ 13 mm gauge including setting
out, mixing, compacting, curing, finishing and providing
construction / expansion joints, as per specification, drawing
and instruction of Site Engineer.
#REF!
#REF!
Quantity
Covered Hall Total
S. N. Description Unit Septic Soak Water Rate Amount Remarks
Sub- Super- Manholes Quantity
tank Pit Tank
Structure Structure
Providing, straightening, cleaning, cutting, fabricating, bending
and placing TMT Thermex steel reinforcement bars and binding
5.3 the bars with 18 gauge annealed wire for tying them at each Kg #VALUE! #VALUE! #VALUE! 113.39 #VALUE!
junction as per design and details for all types of RCC elements
including all waste and cut pieces, provision for spacers, chairs,
providing and placing cement mortar (1:1) cover blocks to keep
Formwork, centering
the bars in the intended and shuttering
position with 19
at all levels as permmdesign,
thick
drawing, plywood
waterproof specification
for alland
kinds
instruction
of R.C.C. ofworks
site ofengineer
any shape,
all
complete.
size and at any level with necessary propping, scaffolding,
staging, supporting, cutting holes for utilization works, etc.
5.4
including providing final surface in correct and perfect line,
level, cleaning the surface and applying form oil and removal of
forms all complete as per specification, drawing and instruction
of Site Engineer.
Column Sqm #REF! #VALUE! 0.84 0.11 0.09 7.28 #REF! 1,405.30 #REF!
Beam Sqm #REF! #VALUE! #REF! 958.71 #REF!
Slab Sqm #REF! #REF! 758.04 #REF!
6 Flooring Works
Earth filling in 300 mm thick layer, watering, ramming including
6.1 supply of filling materials all complete as per design, drawing, Cum #REF! #REF! 301.01 #REF!
specification and instruction of Site Engineer
Sand filling in flooring including supply of filling materials,
6.2 watering, ramming etc. all complete as per design, drawing, Cum #REF! #REF! 3,583.11 #REF!
specification and instruction of site Engineer
Providing and laying one layer of flat brick soling in foundation
and floor with approved quality chimney burnt bricks in perfect
6.3 Sqm #REF! #REF! 1,078.41 #REF!
line and level, including filling the voids with sand as per design,
drawing, specification and instruction of site Engineer
#REF!
#REF!
Quantity
Covered Hall Total
S. N. Description Unit Septic Soak Water Rate Amount Remarks
Sub- Super- Manholes Quantity
tank Pit Tank
Structure Structure
75mm thick P.C.C. (1:2:4) for flooring with approved quality of
cement & sand and crushed stone aggregate including mixing,
6.4 Sqm #REF! 4.22 3.49845 5.76 45.18 #REF! 1,037.26 #REF!
laying and compacting and curing etc all complete as per
design, drawing, specification and instruction of site Engineer
38 mm thick P.C.C. (1:2:4) for flooring with approved quality of
cement & sand and crushed stone aggregate including mixing,
laying and compacting including rubbing with steel trowel to a
6.5 Sqm #REF! #REF! #REF! 609.26 #REF!
hard, smooth and shining surface and curing etc all complete
as per design, drawing, specification and instruction of site
Engineer
3 mm thick cement sand punning on floor, skriting, dado etc,
including mixing laying and rubbing with steel trowel to a hard,
6.6 Sqm #REF! #REF! 237.37 #REF!
smooth and shining surface and curing all complete as per
design, drawing, specification and instruction of site Engineer
7 Painting Works
Providing and applying two coats of plastic emulsion paint of
approved brand and colour with one coat of primer including
7.1 preparation of surface through cleaning as per specification and Sqm #VALUE! #VALUE! 269.63 #VALUE!
making good all small holes of nails, open joints and minor
defects of every kind after application of primer coat as per
Providing and
specification andapplying twoof coats
instruction of weather proof exterior
Site Engineer.
emulsion paint of approved brand and colour on the external
facade with one coat of primer including preparation of surface
7.2 through cleaning as per specification and making good all small Sq.m. #VALUE! #VALUE! 288.95 #VALUE!
holes of nails, open joints and minor defects of every kind after
application of primer coat as per specification and instruction of
Site Engineer.
8 Plaster Works
#REF!
#REF!
Quantity
Covered Hall Total
S. N. Description Unit Septic Soak Water Rate Amount Remarks
Sub- Super- Manholes Quantity
tank Pit Tank
Structure Structure
12.5mm thick cement sand plaster in (1:4) ratio on ceiling with
good finish including supplying of approved quality of cement &
sand, chiping the concrete surface, wetting the surfaces &
8.1 Sq. m #REF! #REF! 381.90 #REF!
curing the work all complete including necessary single or
multiple stage scaffolding at all heights. as per the design,
drawing, specification and instruction of site engineer.
12.5mm thick cement sand plaster in (1:4) ratio on wall with
good finish including supplying of approved quality of cement &
8.2 sand, racking the joint, Chiping the concerte surface, wetting of Sq. m #VALUE! #VALUE! 332.97 #VALUE!
surfaces & curing the work all complete including necessary
single or multiple stage scaffolding at all heights. as per the
9 Aluminium
design, Door specification
drawing, / Windows and instruction of site engineer.
Providing and fixing aluminium doors, windows and ventilators
assembled using colour anodized sections manufactured by
"AGRANI" or equivalent, fabricated as per drawings and fixed
at all levels, elevations and heights. The aluminium extruded
sections shall be anodized of approved colour with anodic film
Single/Double
of not less than panel casement
20 microns. hinge
Rate shall doorto of
include section
provide 5.0
9.1 Sqm #VALUE! #VALUE! 7,553.38 #VALUE!
101*45*1.5 withfloat
mm thick clear 5mmglass/
glass tinted coloured glass/ milky glass of
approved
Sliding cummake and 9 mm
fix window thick both
of section side melamine
101*45*1.5 laminated
with 5mm glass
9.2 Sqm #VALUE! 26.43 #VALUE! 6,465.58 #VALUE!
high net
with pressure
shutter particle board wherever required with snap fit
aluminium
Supplying andcolour anodized
fixing beading
of MS grill with special
of 4.5x20mm MS water proof
plate frame
cascades, neoprene etc. complete, as per
and 12x12mm solid core square rod including metal primer specification,
9.3 drawing and instruction of Site Engineer. Sqm #VALUE! 9.6 57.73 #VALUE! 2,564.62 #VALUE!
paint all complete as per design, drawing and instruction of site
engineer.
10 Floor Finishing Works
Providing and laying 8 mm thick non slip ceramic tiles (Spartek,
Kajaria, or approved equivalent) of approved colour, shade and
size on floor in perfect line and level on 20 mm thick base
10.1 Sq. m #REF! #REF! 3,954.66 #REF!
cement sand mortar (1:4) and jointed with white cement slurry
mixed with pigment to match the shade of the tile complete as
per specification, drawing and instruction of Site Engineer.
#REF!
#REF!
Quantity
Covered Hall Total
S. N. Description Unit Septic Soak Water Rate Amount Remarks
Sub- Super- Manholes Quantity
tank Pit Tank
Structure Structure
Providing and laying 8 mm thick glazed ceramic tiles (Spartek,
Kajaria, or approved equivalent) of approved shade, size and
pattern on wall in perfect line and level on 12.5 mm thick base
10.2 cement sand mortar (1:4) and jointed with cement slurry mixed Sq.m #REF! #REF! 3,954.66 #REF!
with pigment to match the shade of the tile including adhesive
chemical all complete as per specification, drawing and
instruction of Site Engineer.
Providing and laying 16 mm thick granite from Rajasthan, India
of approved quality on wash basin with 30 mm thick cement
10.3 mortar (1:4) including cutting to the required shape, moulding Sq.m #REF! #REF! 4,315.46 #REF!
and polishing all complete, as per specification, drawing and
instruction of Site Engineer.
Providing and laying 16 mm thick marble from Rajasthan, India
of approved quality on floors, staircase, parapet etc. with 30
10.4 mm thick cement mortar (1:4) including cutting to the required Sq.m #VALUE! #VALUE! 4,315.46 #VALUE!
shape, moulding and polishing all complete, as per
specification, drawing and instruction of Site Engineer.
10.5 Parqueting Sq.m #REF! #REF! 3,000.00 #REF!
11 Railing Works
Providing and fixing stainless steel railing of 50mm dia vertical
post and hand rail, 25mm dia three layer horizontal pipe all
11.1 R.m #VALUE! #VALUE! 3,831.04 #VALUE!
complete as per specification, drawing and instruction of Site
Engineer.
12 Roofing Works
12.1 Truss Kg #REF! #REF! 154.72 #REF!
Providing, laying and fixing carbon fiber UPVC roofing sheet
with necessary bolts, J hooks, washers, including necessary
12.2 Sq.m #REF! #REF! 1,600.00 #REF!
overlaps, all complete as per specification, drawing and
instruction of Site Engineer. (5-5.5 Kg/sqm)
Total #REF!
#REF!
###
RATE
S.No. DESCRIPTION OF WORKS UNIT QUANTITY AMOUNT
In Figure In Word
1.Wiring of light/fan & power points:
1.1 Supply of materials and wiring with PVC Insulated copper wire
in NS Approved HDP conduit without any joint in middle of the
span with necessary connecting, fixing, insulating and jointing
materials as per drawing and specification complete (wire:
Trishakti, Pioneer, Litmus)
{b} Outdoor Post top Light point with 3x2.5 Sq. mm cu cable,
bends, circular & Junction boxes with civil foundation
point 2
2. Light Fixtures:
supply of light fixtures, fixing, interconnection, testing and
commissioning complete with Holders, CFL, FTL, GLS,
electronic ballast, capacitor with all required mounting and
2.1 fixing accessories as per drawing
#REF!
###
2.1 RATE
S.No. DESCRIPTION OF WORKS UNIT QUANTITY AMOUNT
In Figure In Word
Indoor Lighting
{a} 2x36 Watt FTL Mirror optics fixture with EB Ballast surface
mounted (LT CS 001 HFB2) set 43
{b} Ceiling Dome Light with 11 watt CFL (CG 80 630) set 36
{c} Dust and jet proof 250W Integral enclosed type HPSV
Medium bay Light (BGEMB 250 SV) set 41
{d} Dust and jet proof 150W Integral enclosed type HPSV
Medium bay Light (BGEMB 150 SV) set 12
{e} Dust and jet proof 70W Integral enclosed type HPSV low
bay Light (BGELB 70 SV) set 14
{f} Black Powder coated Integral, die-cast housing 400W HPSV
Light (LT F1 004) set 4
{g} 14 Watt T8 FTL Picture/Mirror Light Fixture (as per
selection) set 8
{h} Weather proof half-head Light with 11 watt CFL (as per
selection) set 4
2.2 Outdoor Lighting
{a} 9 meter high street light metal pole with required civil works
complete set 4
{b} 70 watt HPSV dia cast sheet aluminum housing with lamp,
Ballast, Control gear, goose neck arm and 3x4 sqmm Cu Ar.
Cable as per drawing and specification (Philips- SRP 48/70(E),
CROMPTON- SSP1207 IH/WI, BAJAJ- BGEST 70 SV DD/02
70 SV or equivalent) set 4
{c} Post top Light fixture with 300 mm Unbreakable Clear Glass
with 18 W CFL Light and 1200 mm SS Stand with required Civil
works (LT GL 105) set 2
3. Fan Fixtures:
3.1 Supply of fan fixtures, fixing, interconnection, testing and
commissioning all complete as per drawing, specification and
instruction
Brands: Crompton, Bajaj or equivalent
220 v, 50 Hz, ceiling fan with J Hook and accessories,
capacitor 1200 mm dia, Heavy duty set 20
#REF!
###
RATE
S.No. DESCRIPTION OF WORKS UNIT QUANTITY AMOUNT
In Figure In Word
4. Switches and Sockets
4.1 Supply of switches, sockets as mentioned below, 18 SWG GI
metal boxes , screw, and other necessary materials with its
Installation, Interconnection and commissioning including civil
works as per drawing , specification all complete
#REF!
###
RATE
S.No. DESCRIPTION OF WORKS UNIT QUANTITY AMOUNT
In Figure In Word
{d} 2x4+1x2.5 -E sq. mm copper Cable laying underground with
PVC conduit [from Main Panel Board to Guard blocks and rm 291
fountain, switch panel interconnection]
6. Earthing system
6.1 Supply of materials and Installation of loke copper plate
(600x600x3.14 mm), salt, charcoal dust, 10 mm2 bare copper
cable with solid CAD weld ( Brazing) & watering 32 mm dia
PVC pipe & its installation in a whole of 90x90x250 cm with the
layers of Earthing materials as per standard, specification,
drawing and refilling the ground all complete
set 3
6.2 Supply and installation of 25*3 mm Copper Strip from roof trus
to Earthing station as Lightening protection and bonding of
metal roof to the earthing system kg 30
6.3 Supply and installation of 10 sq. mm bare copper wire with
necessary copper lugs and copper nut bolts connection with
Earthing system on each Electrical Closet as described on the
drawing rm 135
7. Electrical Panel & Distribution Boards
Supply, Delivery, Installation and Commissioning of the
following Distribution Board Including following equipment
housed in lockable, Double Door enclosure made from 16
SWG HRCA Sheet metal and the enclosure shall be finished at
least of two coats of red oxide metal primer and other two coats
of final epoxy enamel paint as per drawing and site condition
(shop drawing of all Distribution Boards shall submit to the
Consultant and get approval before starting the job)
#REF!
###
RATE
S.No. DESCRIPTION OF WORKS UNIT QUANTITY AMOUNT
In Figure In Word
Electronic Digital Load Meter with 4 position Selector & CTs - 1
set
Indication LED Light with 2 A MCB - 3 set
40 A TP MCCB - 5 set
32 A TP MCB - 5 set
200 A TPNE copper Busbar with all required 1100 Volt Grade
bus Insulator, Colour Bus Sleeve, Power and Control cable,
Cable Lugs/Socket, Terminal Block, Panel wiring materials etc.
all complete
7.2 DBs - [12 Way TPN DB Double Cover 30"x26"x6"] set 4
40 A, TP MCCB -1 set
32 A TP MCB - 1 set
6 A SP MCB - 12 set
16 A SP MCB - 12 set
7.3 External Light Panel [8 wayTPN DB Double Cover 18"x20"x5"]
set 1
32 A, TP MCB -1 set
16 A SP MCB - 6 set
6 A SP MCB - 6 set
7.4 16A DP MCB in Enclosure for Guard House (Only Provision) set 1
7.5 Switch Panel - 1 set 1
40 A, TP MCCB -1 set
32 A TP MCB - 1 set
20 A SP MCB - 6 set
32 A DP Switch - 9 set
7.6 Switch Panel - 2 set 1
40 A, TP MCCB -1 set
20 A, TP MCB -1 set
16 A SP MCB - 3 set
6 A SP MCB - 5 set
16 A DP Switch - 4 set
7.7 100A TPN 4 pole manual chnageover switch within metal
enclosure set 1
8 Telephone system
#REF!
###
RATE
S.No. DESCRIPTION OF WORKS UNIT QUANTITY AMOUNT
In Figure In Word
8.1 Supply of materials and wiring in NS approved 10 kg cm2 HDP
conduit concealed without any joint in middle of the span as per
drawing, specification all complete
{a} Telephone points with 3 Pair UTP Telephone cable point 6
8.2 Supply, installation and interconnection of Telephone/TV CDF
with 8 way Power pass booster, splitter for Coaxial and Solder
less crone for RJ-11 as per drawing, specifications all complete
with require power supply for Amplifier
#REF!
###
RATE
S.No. DESCRIPTION OF WORKS UNIT QUANTITY AMOUNT
In Figure In Word
10.1 Supply, Installation, testing, commissioning and erection of
Fully Enclosed type 40 KVA, 400 Volt, 3 Phase, 50 Hz standby
Diesel Generator set of approved make with all ancillary
equipments [base frame coupling, coupling guard, AMF,
Control panel, exhaust pipe with arrangements, Piping system,
Day tank, canopy, battery its charger RCC Pad & dampers etc.]
for the DG set
set 1