COST OF MATERIALS AT SITE


District Rate For F.Y. 2079/2080

Location :- Kathmandu
Cost of
Rate of materials Vat @ 13% materials
S.N. Description Unit Remarks
with VAT
(Nrs.) (Nrs.) (Nrs.)
A Labour
1 Skill Manpower md 1185.00 0.00 1185.00 District Rate of Kathmandu
2 Unskill Manpower md 870.00 0.00 870.00 District Rate of Kathmandu
3 Carpenter md 1185.00 0.00 1185.00 District Rate of Kathmandu
4 Head Carver md 2550.00 0.00 2550.00 DOA
5 Carver md 2414.00 0.00 2414.00 DOA

B Capping layer granular soil Cum 594.00 77.22 671.22 District Rate of Kathmandu

C Water ltr 0.28 0.00 0.28 District Rate of Kathmandu

D Machine Made Brick


का.म.न.पा. No. 16.85 2.19 19.04 District Rate of Kathmandu

G Cement
OPC Cement Bag 700.00 91.00 791.00 District Rate of Kathmandu

H Stone
का.म.न.पा. cum 2365.77 307.55 2673.32 District Rate of Kathmandu

I Sand
का.म.न.पा. cum 3319.14 431.49 3750.63 District Rate of Kathmandu

J 6-10 mm Aggregate
का.म.न.पा. cum 3389.76 440.67 3830.43 District Rate of Kathmandu

K 10-20 mm Aggregate
का.म.न.पा. cum 3319.14 431.49 3750.63 District Rate of Kathmandu

L 20-40 mm Aggregate
का.म.न.पा. cum 3566.31 463.62 4029.93 District Rate of Kathmandu

N Water Ltr. 0.28 0.00 0.28 District Rate of Kathmandu

O TMT Bar
1 8 mm Dia. kg 99.00 12.87 111.87 District Rate of Kathmandu
2 10,12,16,20 mm Dia. kg 98.00 12.74 110.74 District Rate of Kathmandu
3 Binding Wire kg 106.00 13.78 119.78 District Rate of Kathmandu

व भ न साईजको कला काँट kg 132.00 17.16 149.16 District Rate of Kathmandu


2 of 21

Governement of Bagamati Province


Ministry of Culture and Tourism
Tourism Development Project, Unit Office Kathmandu
Kathmandu

COST OF MATERIALS AT SITE


District Rate For F.Y. 2079/2080

Location :- Kathmandu
Cost of
Rate of materials Vat @ 13% materials
S.N. Description Unit Remarks
with VAT
(Nrs.) (Nrs.) (Nrs.)
Q Painting
समे ट ाईमर से तो Kg 288.00 37.44 325.44 District Rate of Kathmandu
लाि टक इम सन पे ट Ltr 693.00 90.09 783.09 District Rate of Kathmandu
वासेवल ड टे पर Ltr 231.00 30.03 261.03 District Rate of Kathmandu

S Wood Item
६' स मको सालकाठ cum 207622.80 26990.96 234613.76 District Rate of Kathmandu
६' दे िख ८' स मको सालकाठ cum 215037.90 27954.93 242992.83 District Rate of Kathmandu
८' दे िख १२' स मको सालकाठ cum 231704.22 30121.55 261825.77 District Rate of Kathmandu
१२' फट दे िख मा थको साल cum 244698.30 31810.78 276509.08 District Rate of Kathmandu
उतीसको काठ (कु-काठ) cum 23587.08 0.00 23587.08 District Rate of Kathmandu

याल ढोकामा योग हुने


T
फ सचरह
पेच क ला No. 1.00 0.13 1.13 District Rate of Kathmandu
हो ड पा ट No. 21.14 2.75 23.89 District Rate of Kathmandu
ाि डल (साधारण) No. 34.00 4.42 38.42 District Rate of Kathmandu

Carved tudal works


U कँ ु दएको टुँ डाल(3"x8") No. 13500.00 1755.00 15255.00 District Rate of Kathmandu
DUDBC NORMS
5 3fF; sf6\g] To;sf] h/f lemSg], l9:sf] k'm6fpg] / n]en u/L :yn ;kmf ug]{ ;a} jf]sgL ;d]t
A3
b/ ljZn]if0fsf] nflu ! j=ld= lnOPsf]
k|To]s ;|f]t
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd
;fwgsf] hDdf

>lds Hofld 0.023 hjfg 870.00 20.01 20.01

jf:tljs b//]6 20.01

!%Ü 7]s]bf/sf] cf]e/x]8 0

b/ k|lt j=dL=sf] hDdf b/ /]6 20.01


?= 20.01 k}=

10 g/d k|sf/sf] Sn] / l;N6L df6f]df ;j} lsl;dsf] vGg] sfd !) dL6/
B1 ;Dd jf]sgL l8:kf]hn / !=% dL6/;Dd lnˆ6 ;d]t
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|f]t
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd
;fwgsf] hDdf
>lds Hofld 0.70 hjfg 870.00 609.00 609.00

oflGqs pks/0f Hofldsf] Hofnfsf] #Ü n] 18.27

jf:tljs b//]6 627.27

!%Ü 7]s]bf/ cf]e/x]8 0


b/ k|lt 3=dL=sf] hDdf b/ /]6 627.27
?= 627.27 k}=

13 ;fdfGo df6f]n] k'g]{ sfd !%, !% ;]=dL= sf] txdf km}nfpg], kfgL 5g]{ / Hofldåf/f sDk}S6 ug]{ sfd ;d]t !) dL= b"/Laf6 9'jfgL
B2 ug]{ ;fy} l/Ë/f]8;Ddsf] df6f]sf] d"No ;d]t
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|f]t
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd
;fwgsf] hDdf
>lds Hofld 0.50 hjfg 870.00 435.00 435.00
df6f] 1.50 3=dL= 671.22 1006.83
lgdf{0f ;fdu|L
kfgL 5.00 nL6/ 0.28 1.40 1008.23
jf:tljs b//]6 1443.23
b/ k|lt 3=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 0
?= 1443.23 k}= hDdf b/ /]6 1443.23
DUDBC NORMS
3fF; sf6\g] To;sf] h/f lemSg], l9:sf] k'm6fpg] / n]en u/L :yn ;kmf ug]{ ;a} jf]sgL ;d]t
24 e'O{tNnfdf d]lzgåf/f agfOPsf] O{6f pknAw ug]{,
C1 l;d]G6 d;nf -!M$_ tof/ u/L uf/f] nufpg]
sfd #) dL6/;Dd 9'jfgL ;lxt
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|f]t
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd
;fwgsf] hDdf
s_ l;kfn' 1.50 hjfg 1185.00 1777.50
>lds v_ HofdL 2.20 hjfg 870.00 1914.00
u_ HofdL 0.20 hjfg 870.00 174.00 3865.50

O{6f 530 uf]6f 19.04 10090.26


lgdf{0f ;fdu|L l;d]G6 0.10 d]=6= 791.00 79.10
afn'jf vf]nfsf] 0.27 3=dL= 3750.63 1012.66
kfgL 120.00 nL6/ 0.28 33.60 11215.62
v6sf] ;ffdfg -u_ sf] #Ü n] 5.22
jf:tljs b//]6 15086.34
b/ k|lt 3=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 0
?= 15086.34 k}= hDdf b/ /]6 15086.34

46 hu leQf kvf{ndf l;d]G6 s+lqm6 ug]{ sfd dfn;fdfg pknAw ug]{ #) dL6/;Dd 9'jfgL ;lxt
D1 -lk=;L=;L= !M#M^_
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|f]t
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd
;fwgsf] hDdf
s_ l;kfn' 1 hjfg 1185.00 1185.00
>lds
v_ HofdL 4 hjfg 870.00 3480.00 4665.00

l;d]G6 0.22 d]=6= 791.00 174.02


$) dL=dL=9'+uf -qm;\8_ /f]8f 0.65 3=dL= 4029.93 2619.45
lgdf{0f ;fdu|L @) dL=dL=9'+uf -qm;\8_ /f]8f 0.24 3=dL= 3750.63 900.15
v;|f] afn'jf vf]nfsf] 0.47 3=dL= 3750.63 1762.79
kfgL 120.00 nL6/ 0.28 33.60 5490.01

jf:tljs b//]6 10155.01


b/ k|lt 3=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 0
?= 10155.01 k}= hDdf b/ /]6 10155.01
DUDBC NORMS
3fF; sf6\g] To;sf] h/f lemSg], l9:sf] k'm6fpg] / n]en u/L :yn ;kmf ug]{ ;a} jf]sgL ;d]t
49 ;'k/ :6«Sr/, 8]s :n]a ljdx?df l;d]G6 s+lqm6 ug]{ sfd
D2 dfn;fdfg pknAw ug]{ #) dL6/;Dd
! 9'jfgL ;d]t
-lk=;L=;L= ! M ! ÷@ M #_
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|f]t
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd
;fwgsf] hDdf
s_ l;kfn' 0.80 hjfg 1185.00 948.00
>lds
v_ HofdL 7.00 hjfg 870.00 6090.00 7038.00

l;d]G6 0.40 d]=6= 791.00 316.40


@) dL=dL=9'+uf -qm;\8_ /f]8f 0.57 3=dL= 3750.63 2137.85
lgdf{0f ;fdu|L !) dL=dL=9'+uf -qm;\8_ /f]8f 0.29 3=dL= 3830.43 1110.82
v;|f] afn'jf 0.425 3=dL= 3750.63 1594.01
kfgL 200.00 nL6/ 0.28 56.00 5215.08

jf:tljs b//]6 12253.08


b/ k|lt 3=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 0
?= 12253.08 k}= hDdf b/ /]6 12253.08

58 cf/=;L=;L= nflu kmnfd] 808L sf6\g], df]8\g] gS:ff cg';f/ 7fpFdf /fvL afFWg] sfd #) dL6/;Dd 9'jfgL ;lxt
D9
b/ ljZn]if0fsf] nflu ! Df]=6= lnOPsf]
k|To]s ;|f]t
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd
;fwgsf] hDdf
s_ l;kfn' 12.00 hjfg 1185.00 14220.00
>lds
v_ HofdL 12.00 hjfg 870.00 10440.00 24660.00

lgdf{0f ;fdu|L 808L 1.05 d]=6= 110740.00 116277.00


hL=cfO{=afFWg] tf/ 10.0 s]=hL= 119.78 1197.80 117474.80

jf:tljs b//]6 142134.80


b/ k|lt d]=6=sf] !%Ü 7]s]bf/ cf]e/x]8 0
?= 142134.80 k}= hDdf b/ /]6 142134.80
DUDBC NORMS
3fF; sf6\g] To;sf] h/f lemSg], l9:sf] k'm6fpg] / n]en u/L :yn ;kmf ug]{ ;a} jf]sgL ;d]t
sf7df kmdf{ agfpg] sfd, dfn;fdfgsf] pknlAw, 5gf}6 ug]{, gS;f cg';f/ kmdf{ /fVg] lsnf / cGt/ nufpg]
kmdf{ lemSg], x6fpg] #) ld6/;Dd 9'jfgL ;lxt
59
kmz{ / :n]j h:tf sfd
b/ ljZn]if0fsf] nflu !) j=ld= lnOPsf]
k|To]s ;|f]t
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd
;fwgsf] hDdf
s_ l;kfn' 1.72 hjfg 1185.00 2038.20
>lds
v_ HofdL 2.57 hjfg 870.00 2235.90 4274.10

lgdf{0f ;fdu|L :yfgLo s'–sf7 0.070 3=dL= 3931.18 275.18


lsnf 2.50 s]=hL= 149.16 372.90 648.08

jf:tljs b//]6 4922.18


b/ k|lt j=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 0
4922.18 ?= 492.21 k}= hDdf b/ /]6 4922.18
10
gf]6 M ^ k6s;Dd k|of]u ug{ ;lsg] To; kl5 kmdf{sf] d"No @%Ü afFls /xg] lx;fj ul/Psf] -)=&% X )=%@^Ö)=)& 3=dL=_

86 cu|fv sf7sf] jLd blng cflb agfO{ hf]8g\ ] .


F19 b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|f]t
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd
;fwgsf] hDdf
s_ l;kfn' 17.65 hjfg 1185.00 20915.25
>lds
v_ HofdL 1.76 hjfg 870.00 1531.20 22446.45

lgdf{0f ;fdu|L cu|fv sf7 1.05 3=dL= 261825.77 274917.05


lsnf cGbfhL s]=hL= – 60.00 274977.05

jf:tljs b//]6 297423.50


b/ k|lt 3=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 0
?= 297423.50 k}= hDdf b/ /]6 297423.50

88 cu|fv sf7sf] s}+rL -6«;_ agfO{ hf]8\g] sfd .


F21 b/ ljZn]if0fsf] nflu !) Jf=ld= lnOPsf]
k|To]s ;|f]t
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd
;fwgsf] hDdf
s_ l;kfn' 1.43 hjfg 1185.00 1694.55
>lds
v_ HofdL 0.143 hjfg 870.00 124.41 1818.96

lgdf{0f ;fdu|L cu|fv sf7 0.275 3=dL= 261825.77 72002.08


lsnf cGbfh – 60.00 72062.08
jf:tljs b//]6 73881.04
b/ k|lt j=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 0
73881.04 ?= 7388.10 k}= hDdf b/ /]6 73881.04
10
DUDBC NORMS
3fF; sf6\g] To;sf] h/f lemSg], l9:sf] k'm6fpg] / n]en u/L :yn ;kmf ug]{ ;a} jf]sgL ;d]t

cu|fv sf7sf] rf}s; agfO hf]8g\ ] sfd .


89
G1 b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|f]t
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd
;fwgsf] hDdf
s_ l;kfn' 34.00 hjfg 1185.00 40290.00
>lds
v_ HofdL 3.40 hjfg 870.00 2958.00 43248.00
cu|fv sf7 1.10 3=dL= 207622.80 228385.08
lgdf{0f ;fdu|L xf]N8 kmf:6 92.00 uf]6f 23.89 2198.01
k]r lsnf 184.00 uf]6f 1.13 207.92 230791.01
jf:tljs b//]6 274039.01
b/ k|lt 3=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 0
?= 274039.01 hDdf b/ /]6 274039.01

119 %) dL=dL= -@Æ_ afSnf] l;d]G6 s+qmL6 -!M@M$_ ˆnf]/ 9nfg u/L l;d]G6 3f]6L tof/ ug]{ .
!!–! Uf
H1 b/ ljZn]if0fsf] nflu !) j=dL= lnOPsf]
k|To]s ;|f]t
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd
;fwgsf] hDdf
s_ l;kfn' 1.25 hjfg 1185.00 1481.25
>lds
v_ HofdL 2.50 hjfg 870.00 2175.00 3656.25
l;d]G6 0.17 d]=6= 791.00 134.47
lgdf{0f ;fdu|L jfn'jf 0.23 3=dL= 3750.63 862.64
@) dL=dL /f]8f 0.46 3=dL= 3750.63 1725.28 2722.39
jf:tljs b//]6 6378.64
b/ k|lt j=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 0
6378.64 ?= 637.86 k}= hDdf b/ /]6 6378.64
10

136 ;'Vvf 9+'uf 5fKg] sfd .


H 16 b/ ljZn]if0fsf] nflu ! 3=dL= lnOPsf]
k|To]s ;|f]t
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd
;fwgsf] hDdf
s_ l;kfn' 1.00 hjfg 1185.00 1185.00
>lds
v_ HofdL 3.50 hjfg 870.00 3045.00 4230.00
9'+uf -kmf]?jf_ 1.10 3=dL= 2673.32 2940.65
lgdf{0f ;fdu|L
jfn'jf vf]nfsf] 0.71 3=dL= 3750.63 2662.94 5603.59
jf:tljs b//]6 9833.59
b/ k|lt 3=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 0
9833.59 ?= 9833.59 k}= hDdf b/ /]6 9833.59
1
DUDBC NORMS
3fF; sf6\g] To;sf] h/f lemSg], l9:sf] k'm6fpg] / n]en u/L :yn ;kmf ug]{ ;a} jf]sgL ;d]t
194 tof/L Knfli6s Odn\;g k]G6 b'O{ sf]6 nufpg] .-Ps sf]6 c:t/ ;lxt_
J5 b/ ljZn]if0fsf] nflu !)) j=dL= lnOPsf]
k|To]s ;|f]t
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd
;fwgsf] hDdf
s_ l;kfn' 12.00 hjfg 1185.00 14220.00
>lds
v_ HofdL 8.00 hjfg 870.00 6960.00 21180.00

c:t/ 8.10 nL= 325.44 2636.06


lgdf{0f ;fdu|L
tof/L /+u 16.00 nL= 783.09 12529.44 15165.50
jf:tljs b//]6 36345.50
b/ k|lt j=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 0
36345.50 ?= 363.45 k}= hDdf b/ /]6 36345.50
100

221 Ps sf]6 k|fO{d/ ;lxt b'O{ sf]6 tof/L jf;]jn l8:6]Dk/ nufpg] sfd .
J 26 b/ ljZn]if0fsf] nflu !)) j=dL= lnOPsf]
k|To]s ;|f]t
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ b/ k|lt PsfO{ /sd
;fwgsf] hDdf
s_ l;kfn' 5.80 hjfg 1185.00 6873.00
>lds
v_ HofdL 5.80 hjfg 870.00 5046.00 11919.00

lgdf{0f ;fdu|L c:t/ 8.0 nL= 325.44 2603.52


jf;]jn l8:6]Dk/ 16.00 nL= 261.03 4176.48 6780.00
jf:tljs b//]6 18699.00
b/ k|lt j=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 0
18699.00 ?= 186.99 k}= hDdf b/ /]6 18699.00
100

319 % ls=dL= ;Ddsf] b'/L # 6g Sofkfl;6Ls] 6«såf/f vlg elTs cfPsf tyf sfd gnfUg] a:t' tyf ;fdfg yGsfpg] sfd .
8.04.01
Fuel rate (Disel) F NRs 98
Mini Truck Rent(Per
Hour/3cum) R NRs300 NRs100/cum
Unskilled man LR NRs 375
valley V1 20km/hour v1
disposal site D1 5 km d1
Formula
T=2*d1/v1 2x5/20 0.5
Labour 0.4xL R 0.4x375 150
Fuel(Disel) 3.2xTx F 3.2xTx98 156.8
Equipment 0.4(T+0.75)*100 50
Total Rate for 10km/cum 356.80
15% overheadcharge 0
b/ k|lt 3=dL= sf] 356.80
Source Norms for rate Analysis as per Standard Spcification for Road And Bridge works GoN.M.P.P.and Works Department of Road

X;dfKtX
DOA NORMS
Item : Salwood wooden works
Norms No : Item no:9 Unit: 1 cum

Particular Description Unit Quantity Rate Amount Remarks


Labour Carpenter 17.65 md 1,185.00 20,915.25
Labour 1.76 md 870.00 1,531.20
Material Salwood beam 1.05 m3 261,825.77 274,917.06
Nails 0.50 kg 149.16 74.58 cum
Total 297,438.09
297,438.09

Carved salwood lattice(jali) of carved window(second type) including wood

Norms No : DOA(Item no 65) Unit 0.92sqm


Particular Description Quantity Unit Rate Amount Remarks
Labour Head carver 3.00 md 2,550.00 7,650.00
Carver 6.00 md 2,414.00 14,484.00
Carpenter 5.00 md 1,185.00 5,925.00
Unskill 1.00 md 870.00 870.00
Material Salwood 0.04 cum 234,613.76 8,631.08
Total 37,560.08
40,826.17 Sqm

Item : Salwood wooden planks works


Norms No : Item no:19(DOA) Unit: 100 Sqm.

Particular Description Unit Quantity Rate Amount Remarks


Labour Skill 14.30 md 1,185.00 16,945.50
Unskill 1.43 md 870.00 1,244.10
Material Salwood beam 2.75 mt 261,825.77 720,020.86
Nails 20.00 kg 149.16 2,983.20
Total 741,193.66
7,411.94 Sqm
10 of 22

k|b]z ;/sf/
;+:s[lt tyf ko{6g dGqfno
ko{6g ljsf; cfof]hgf
O{sfO{ sfof{no, sf7df08f}
afudtL k|b]z
sfo{s|dsf] gfdM /ftf] s'df/L dlGb/ kl/;/df ef}lts k'jf{wf/ lgdf{0f -cGo ;fj{hlgs lgdf{0f_, sf7df8f}F
pkef]Qmf ;ldltsf] gfdM
:yfgM sf7df8f}F dxfgu/kflnsf j8f g !!, sf7df8f}F
s[=g+=M !!=^=@%=&(
Summary of Rate
Item No Description Unit Unite Rate Remarks
1 Site clearance before and after completion of work Sqm 20.01
Earth work in exacavation by manual means including
2 removal of deleterious matter all complete as per drawing cum 627.27
and Technical Specifications
Backfill of earthwork for at required place and compacting all
3 cum 1,443.23
complete as per instruction of the site incharge
Providing and laying stone soling in level and line as per
4 cum 9,833.59
drawings, specification & instruction of site engineer.
Plain cement concret PCC(1:3:6) in foundation, floors etc. with
cement, sand and crussed aggregate of 10 mm to 38mm gauge
5 including mixing with mixture machine & compaction by vibrator, cum 10,155.01
laying in line & level with curing all type of works complete as
per specifications & instructions
RCC work: RCC work in PCC (1:1.5:3) in foundation, floors,
columns, beams, slabs, etc. with cement,sand and crussed
aggregate of 10 mm to 38mm gauge including mixing with
6 cum 12,253.08
mixture machine & compaction by vibrator, laying in line & level
with curing all type of works complete as per specifications &
instructions
Tor /TMT Reinforcement work for R.C.C work including supply,
straighting, cutting, bending, binding and laying of different
7 mt 142,134.80
diameter steel rod in all types of R.C.C work as per design,
drawing, specification and instruction all complete work
Flooring work with 1:2:4 cement sand mortar (50mm thick
8 Sqm 637.86
kora masino)
Providing and laying machine made brick work above
9 ground floor (1:4) cement sand mortar all complete as per cum 15,086.34
drawing and instruction of the site engineer.
Providing and applying two coats of weather proof exterior
emulsion paint of approved brand and color on the external
facade with one coat of primer including preparation of surface
10 through cleaning as per specification and making good all small Sqm 363.45
holes of nails, open joints and minor defects of every kind after
application of primer coat as per specification and instruction of
Site Engineer
Providing and Coloring with two coat distemper paint with one
11 coat primer to give uniform coloring after rendering the surface Sqm 186.99
all complete as per instruction of the site engineer.
12 Agrakh Timber work for beam, joist, column etc Cum 297,423.50
1" thick Nepali Sal wood planking works
13 sqm 7,411.94
for Flooring and Roof Cover

User Committe Prepared by Checked By Approved By


Sushil Shah Dinesh Kunwar Dorn Bikram Karki
Sub-Engineer Engineer Unit Chief
11 of 22

k|b]z ;/sf/
;+:s[lt tyf ko{6g dGqfno
ko{6g ljsf; cfof]hgf
O{sfO{ sfof{no, sf7df08f}
afudtL k|b]z
sfo{s|dsf] gfdM /ftf] s'df/L dlGb/ kl/;/df ef}lts k'jf{wf/ lgdf{0f -cGo ;fj{hlgs lgdf{0f_, sf7df8f}F
pkef]Qmf ;ldltsf] gfdM
:yfgM sf7df8f}F dxfgu/kflnsf j8f g !!, sf7df8f}F
s[=g+=M !!=^=@%=&(
Summary of Rate
Item No Description Unit Unite Rate Remarks
Providing Salwood chaukhat frames for door and windows
14 having 3"*4" sizes all complete work including preparing and cum 274,039.01
fixing.
Providing highly carved second type lattice window using well
15 sqm 40,826.17
seasoning and poisning salwood.
Providing and fixing Salwood works for beam joist column
16 cum 297,438.09
batten rafter on the roof
17 Carved Tudal fixing and placing of (3*8 inch sizes) Nos 15,255.00 Kathmandu District Rate

User Committe Prepared by Checked By Approved By


Sushil Shah Dinesh Kunwar Dorn Bikram Karki
Sub-Engineer Engineer Unit Chief
12 of 23

k|b]z ;/sf/
;+:s[lt tyf ko{6g dGqfno
ko{6g ljsf; cfof]hgf
O{sfO{ sfof{no, sf7df08f}
afudtL k|b]z
sfo{s|dsf] gfdM /ftf] s'df/L dlGb/ kl/;/df ef}lts k'jf{wf/ lgdf{0f -cGo ;fj{hlgs lgdf{0f_, sf7df8f}F
pkef]Qmf ;ldltsf] gfdM
:yfgM sf7df8f}F dxfgu/kflnsf j8f g !!, sf7df8f}F
s[=g+=M !!=^=@%=&(
Detail Quantity Estimation of Rato Kumari building
S.No. Particulars Nos Length Breadt Height Qty Units Remarks
h
1 Site clearance before and after completion of A3
work
Site Clearence 1 6.10 4.88 29.73

Total Quantity of Site Clearence 29.73 Sqm


2 Earth work in exacavation by manual B1
means including removal of deleterious
matter all complete as per drawing and
Technical Specifications
-
Foundation 12 1.50 1.50 1.73 46.58
Below Brickwork under GL
Longer Side 3 5.49 0.23 0.15 0.57
Shorter Side 4 4.88 0.23 0.15 0.67
Deduction
Footing
Longer Side -3 4.80 0.23 0.15 -0.50
Shorter Side -4 3.30 0.23 0.15 -0.46

Total Quantity of Excavation 46.86 Cum


3 Backfill of earthwork for at required place B2
and compacting all complete as per instruction
of the site engineer
upto GL
Foundation 12 2.22 26.64
GL to Plinth 1 5.49 4.88 0.08 2.01

Total Quantity of Backfilling 28.65 cum


4 Providing and laying stone soling in H 16
level and line as per drawings,
specification & instruction of site engineer

Foundation 12 1.50 1.50 0.15 4.05


Below Brickwork under GL
Longer Side 3 5.49 0.23 0.15 0.57
Shorter Side 4 4.88 0.23 0.15 0.67
Deduction
Columns -12 0.3 0.3 0.15 -0.16
Ground Floor 1 4.88 4.42 0.15 3.23
Deduction
Columns -2 0.3 0.3 0.15 -0.03
Beams
Longer Side -1 4.57 0.23 0.15 -0.16
Shorter Side -2 4.01 0.23 0.15 -0.28

Total Quantity of Stone Soling 7.90 Cum

User Committe Prepared by Checked By Approved By


Sushil Shah Dinesh Kunwar Dorn Bikram Karki
Sub-Engineer Engineer Unit Chief
13 of 23

k|b]z ;/sf/
;+:s[lt tyf ko{6g dGqfno
ko{6g ljsf; cfof]hgf
O{sfO{ sfof{no, sf7df08f}
afudtL k|b]z
sfo{s|dsf] gfdM /ftf] s'df/L dlGb/ kl/;/df ef}lts k'jf{wf/ lgdf{0f -cGo ;fj{hlgs lgdf{0f_, sf7df8f}F
pkef]Qmf ;ldltsf] gfdM
:yfgM sf7df8f}F dxfgu/kflnsf j8f g !!, sf7df8f}F
s[=g+=M !!=^=@%=&(
Detail Quantity Estimation of Rato Kumari building
S.No. Particulars Nos Length Breadt Height Qty Units Remarks
h
5 Plain cement concret PCC (1:3:6) in D1
foundation, floors etc. with cement, sand and
crussed aggregate of 10 mm to 38mm gauge
including mixing with mixture machine &
compaction by vibrator, laying in line & level
with curing all type of works complete as per
specifications & instructions

Foundation 12 1.50 1.50 0.075 2.03


Below Brickwork under GL
Longer Side 3 5.49 0.23 0.075 0.28
Shorter Side 4 4.88 0.23 0.075 0.34
Deduction
Columns -12 0.3 0.3 0.075 -0.08
Ground Floor 1 4.88 4.42 0.08 1.62
Deduction
Columns -2 0.3 0.3 0.08 -0.01
Beams
Longer Side -1 4.57 0.23 0.08 -0.08
Shorter Side -2 4.01 0.23 0.08 -0.14

Total Quantity of PCC Works 3.95 Cum


6 RCC work: RCC work in PCC (1:1.5:3) in D2
foundation, floors, columns, beams, slabs, etc.
with cement,sand and crussed aggregate of 10
mm to 38mm gauge including mixing with
mixture machine & compaction by vibrator,
laying in line & level with curing all type of
works complete as per specifications and
instructions

Foundation
Below Trapezoidal Portion 12.00 1.5 1.5 0.2 3.60
Trapezoidal Portion 12.00 0.26 3.12
Column
below GL 12 0.30 0.30 1.22 4.39
above GL 12 0.30 0.30 0.08 0.27
Plinth Beam
Longer Side 3 5.49 0.23 0.23 0.16
Shorter Side 4 4.88 0.23 0.23 0.21

Total Quantity of RCC Works 11.75 Cum

User Committe Prepared by Checked By Approved By


Sushil Shah Dinesh Kunwar Dorn Bikram Karki
Sub-Engineer Engineer Unit Chief
14 of 23

k|b]z ;/sf/
;+:s[lt tyf ko{6g dGqfno
ko{6g ljsf; cfof]hgf
O{sfO{ sfof{no, sf7df08f}
afudtL k|b]z
sfo{s|dsf] gfdM /ftf] s'df/L dlGb/ kl/;/df ef}lts k'jf{wf/ lgdf{0f -cGo ;fj{hlgs lgdf{0f_, sf7df8f}F
pkef]Qmf ;ldltsf] gfdM
:yfgM sf7df8f}F dxfgu/kflnsf j8f g !!, sf7df8f}F
s[=g+=M !!=^=@%=&(
Detail Quantity Estimation of Rato Kumari building
S.No. Particulars Nos Length Breadt Height Qty Units Remarks
h
7 Tor /TMT Reinforcement work for D9
R.C.C work including supply, straighting,
cutting, bending, binding and laying of
different diameter steel rod in all types of
R.C.C work as per design
,drawing ,specification and instruction all
complete work

Footing
Longitudinal 12mm @ 150mm c/c 120.00 1.50 0.89 159.84
Transverse 12mm @ 150mm c/c 120.00 1.50 0.89 159.84
Column
Longitudinal 12mm 96.00 3.23 0.89 275.35
Transverse 8mm tie @100mm c/c 216.00 1.76 0.39 149.96
Plinth Beam
Longitudinal 12mm
Longer Side 12 6.69 0.89 71.25
Shorter Side 16 6.08 0.89 86.34
Transverse 8mm tie @100/150mm c/c 269.00 0.86 0.39 91.63

Total Quantity of RCC Works 994.21 kg


0.99 ton

8 Flooring work with 1:2:4 cement sand H1


mortar (50mm thick kora masino)
Ground Floor 1 4.88 4.42 Area 21.55
Deduction
Columns -2 0.3 0.3 Area -0.18

Total Quantity of Flooring Works 21.37 Sqm

9 Providing and laying machine made brick C1


work in (1:4) cement sand mortar all
complete as per drawing and
instruction of the site engineer.
From GL to Plinth level
Longer wall 3 4.57 0.23 0.23 0.73
Shorter wall 4 4.42 0.23 0.23 0.94
From Plinth to 1st Floor Level
Longer wall (back wall) 1 4.88 0.23 2.18 2.45
Shorter wall (side wall) 2 4.65 0.23 2.18 4.67
From 1st Floor to Roof Level
Longer wall (back wall) 1 4.88 0.23 2.18 2.45
Shorter wall (side wall) 2 4.65 0.23 2.18 4.67
Deduction
Windows -7 1.17 0.23 1.47 -2.77
Peti
Right Side 1 4.88 0.61 0.46 1.36

Total Quantity of Brick Works 14.49 Cum

User Committe Prepared by Checked By Approved By


Sushil Shah Dinesh Kunwar Dorn Bikram Karki
Sub-Engineer Engineer Unit Chief
15 of 23

k|b]z ;/sf/
;+:s[lt tyf ko{6g dGqfno
ko{6g ljsf; cfof]hgf
O{sfO{ sfof{no, sf7df08f}
afudtL k|b]z
sfo{s|dsf] gfdM /ftf] s'df/L dlGb/ kl/;/df ef}lts k'jf{wf/ lgdf{0f -cGo ;fj{hlgs lgdf{0f_, sf7df8f}F
pkef]Qmf ;ldltsf] gfdM
:yfgM sf7df8f}F dxfgu/kflnsf j8f g !!, sf7df8f}F
s[=g+=M !!=^=@%=&(
Detail Quantity Estimation of Rato Kumari building
S.No. Particulars Nos Length Breadt Height Qty Units Remarks
h

User Committe Prepared by Checked By Approved By


Sushil Shah Dinesh Kunwar Dorn Bikram Karki
Sub-Engineer Engineer Unit Chief
16 of 23

k|b]z ;/sf/
;+:s[lt tyf ko{6g dGqfno
ko{6g ljsf; cfof]hgf
O{sfO{ sfof{no, sf7df08f}
afudtL k|b]z
sfo{s|dsf] gfdM /ftf] s'df/L dlGb/ kl/;/df ef}lts k'jf{wf/ lgdf{0f -cGo ;fj{hlgs lgdf{0f_, sf7df8f}F
pkef]Qmf ;ldltsf] gfdM
:yfgM sf7df8f}F dxfgu/kflnsf j8f g !!, sf7df8f}F
s[=g+=M !!=^=@%=&(
Detail Quantity Estimation of Rato Kumari building
S.No. Particulars Nos Length Breadt Height Qty Units Remarks
h
10 Providing and applying two coats of weather J5
proof exterior emulsion paint of approved
brand and color on the external facade with
one coat of primer including preparation of
surface through cleaning as per specification
and making good all small holes of nails, open
joints and minor defects of every kind after
application of primer coat as per specification
and instruction of Site Engineer

From GL to Plinth level


Longer wall 3 5.49 Area 0.075 1.23
Shorter wall 4 4.88 Area 0.08 1.46
From Plinth to 1st Floor Level
Longer wall (back wall) 1 5.18 Area 2.18 11.32
Shorter wall (side wall) 2 4.19 Area 2.18 18.31
From 1st Floor to Roof Level
Longer wall (back wall) 1 5.18 Area 2.18 11.32
Shorter wall (side wall) 2 4.19 Area 2.18 18.31
Deduction
Windows -7 1.17 Area 1.47 -12.05

Total Quantity of Brick Works 49.91 Sqm

11 Providing and Coloring with two coat J 26


distemper paint with one coat primer to give
uniform coloring after rendering the surface
all complete. As per instruction of site
Engineer
From Plinth to 1st Floor Level
Longer wall (back wall) 1 5.33 Area 2.18 11.65
Shorter wall (side wall) 2 5.44 Area 2.18 23.75
From 1st Floor to Roof Level
Longer wall (back wall) 1 5.33 0.23 2.18 11.65
Shorter wall (side wall) 2 5.44 0.23 2.18 23.75
Deduction
Windows -7 1.17 Area 1.47 -12.05

Total Quantity of Brick Works 58.75 Sqm

12 Agrakh Timber work for beam, joist ,


column etc F19

Column(9"*9") 12 0.23 0.23 2.18 1.39


Beam at 1st floor level(8"*8")
Longer beam 3 4.88 0.20 0.20 0.59
Shorter beam 4 4.65 0.20 0.20 0.74
Floor Beam (80mmx100mm) 9 4.88 0.08 0.10 0.35

User Committe Prepared by Checked By Approved By


Sushil Shah Dinesh Kunwar Dorn Bikram Karki
Sub-Engineer Engineer Unit Chief
17 of 23

k|b]z ;/sf/
;+:s[lt tyf ko{6g dGqfno
ko{6g ljsf; cfof]hgf
O{sfO{ sfof{no, sf7df08f}
afudtL k|b]z
sfo{s|dsf] gfdM /ftf] s'df/L dlGb/ kl/;/df ef}lts k'jf{wf/ lgdf{0f -cGo ;fj{hlgs lgdf{0f_, sf7df8f}F
pkef]Qmf ;ldltsf] gfdM
:yfgM sf7df8f}F dxfgu/kflnsf j8f g !!, sf7df8f}F
s[=g+=M !!=^=@%=&(
Detail Quantity Estimation of Rato Kumari building
S.No. Particulars Nos Length Breadt Height Qty Units Remarks
h
Beam below Ceiling -
Longer beam 3 4.88 0.20 0.20 0.59
Shorter beam 4 4.65 0.20 0.20 0.74

Total Quantity of Timber Works 4.40 Cum

User Committe Prepared by Checked By Approved By


Sushil Shah Dinesh Kunwar Dorn Bikram Karki
Sub-Engineer Engineer Unit Chief
18 of 23

k|b]z ;/sf/
;+:s[lt tyf ko{6g dGqfno
ko{6g ljsf; cfof]hgf
O{sfO{ sfof{no, sf7df08f}
afudtL k|b]z
sfo{s|dsf] gfdM /ftf] s'df/L dlGb/ kl/;/df ef}lts k'jf{wf/ lgdf{0f -cGo ;fj{hlgs lgdf{0f_, sf7df8f}F
pkef]Qmf ;ldltsf] gfdM
:yfgM sf7df8f}F dxfgu/kflnsf j8f g !!, sf7df8f}F
s[=g+=M !!=^=@%=&(
Detail Quantity Estimation of Rato Kumari building
S.No. Particulars Nos Length Breadt Height Qty Units Remarks
h
13 1" thick Nepali Sal wood planking works for
DOA, 19
Flooring and Roof Cover
Flooring
First Floor 1 Area 72.75 72.75
Roof Truss
Smaller Side 1.00 6.10 2.51 15.33
Larger Side 1.00 6.10 3.28 19.97
eaves board 2.00 6.10 0.15 1.83

Total Quantity of Sal Wood Planking Works 109.88 Sqm

14 Windows Frame G1
1st Floor (3"x4") 7 4.98 0.10 0.075 0.26
1st Floor (2"x2") for Lattice Support 7 2.24 0.05 0.05 0.04

Total Quantity of Windows Frame 0.30 Cum

15 Windows Lattice (jali) DOA, 65


1st Floor 7 Area 0.61 0.91 3.90 Sqm

Total Quantity of Windows Frame 3.90 Sqm

16
Providing and fixing Salwood works for beam DOA, 9
joist column batten rafter on the roof
Inclined Rafter At the corner of roof 4.00 5.79 0.10 0.10 0.23
Tie member 1.00 4.88 0.13 0.13 0.08
Rafter 8.00 1.02 0.10 0.10 0.08
King post 4.00 0.38 0.13 0.13 0.02
Wooden Purlin
Along length (both side of roof ) 10.00 6.10 0.10 0.08 0.46
Total Quantity of Salwood 0.87 Cum

17 Carved Tudal fixing and placing of (3*8 inch


7.00 7.00 nos KTM DR
sizes)

User Committe Prepared by Checked By Approved By


Sushil Shah Dinesh Kunwar Dorn Bikram Karki
Sub-Engineer Engineer Unit Chief
19 of 22

k|b]z ;/sf/
;+:s[lt tyf ko{6g dGqfno
ko{6g ljsf; cfof]hgf
O{sfO{ sfof{no, sf7df08f}
afudtL k|b]z
sfo{s|dsf] gfdM /ftf] s'df/L dlGb/ kl/;/df ef}lts k'jf{wf/ lgdf{0f -cGo ;fj{hlgs lgdf{0f_, sf7df8f}F
pkef]Qmf ;ldltsf] gfdM
:yfgM sf7df8f}F dxfgu/kflnsf j8f g !!, sf7df8f}F
s[=g+=M !!=^=@%=&(
Abstract of Cost
S.N Description Unit Quantity Rate Total amount Remarks
1 Site clearance before and after completion of work Sqm 29.73 20.01 594.88
2 Earth work in exacavation by manual means including removal
of deleterious matter all complete as per drawing and Technical Cum 46.86 627.27 29396.16
Specifications
3 Backfill of earthwork for at required place and compacting all
Cum 28.65 1,443.23 41345.69
complete as per instruction of the site incharge
4 Providing and laying stone soling in level and line as per drawings,
Cum 7.90 9,833.59 77677.71
specification & instruction of site engineer.
5 Plain cement concret PCC(1:3:6) in foundation, floors etc. with
cement, sand and crussed aggregate of 10 mm to 38mm gauge
including mixing with mixture machine & compaction by vibrator, Cum 3.95 10,155.01 40159.11
laying in line & level with curing all type of works complete as per
specifications & instructions
6 RCC work: RCC work in PCC (1:1.5:3) in foundation, floors,
columns, beams, slabs, etc. with cement,sand and crussed aggregate
of 10 mm to 38mm gauge including mixing with mixture machine &
Cum 11.75 12,253.08 144019.52
compaction by vibrator, laying in line & level with curing all type of
works complete as per specifications & instructions

7 Tor /TMT Reinforcement work for R.C.C work including supply,


straighting, cutting, bending, binding and laying of different diameter
MT 0.99 142,134.80 141311.91
steel rod in all types of R.C.C work as per design, drawing,
specification and instruction all complete work
8 Flooring work with 1:2:4 cement sand mortar (50mm thick kora
Sqm 21.37 637.86 13633.30
masino)
9 Providing and laying machine made brick work above ground
floor (1:4) cement sand mortar all complete as per drawing and Cum 14.49 15,086.34 218605.17
instruction of the site engineer.
10 Providing and applying two coats of weather proof exterior emulsion
paint of approved brand and color on the external facade with one
coat of primer including preparation of surface through cleaning as
per specification and making good all small holes of nails, open joints sqm 49.91 363.45 18138.02
and minor defects of every kind after application of primer coat as per
specification and instruction of Site Engineer

11 Providing and Coloring with two coat distemper paint with one coat
primer to give uniform coloring after rendering the surface all cum 58.75 186.99 10985.34
complete as per instruction of the site engineer.
12 Agrakh Timber work for beam, joist, column etc Cum 4.40 297,423.50 1307367.44
13 1" thick Nepali Sal wood planking works
Sqm 109.88 7,411.94 814452.54
for Flooring and Roof Cover
14 Providing Salwood chaukhat frames for door and windows having
3"*4" sizes all complete work including preparing and fixing. Cum 0.30 274,039.01 82343.79

15 Providing highly carved second type lattice window using well


Sqm 3.90 40,826.17 159300.76
seasoning and poisning salwood.

User Committe Prepared by Checked By Approved By


Gagan Sharma Dinesh Kunwar Dorn Bikram Karki
Sub-Engineer Engineer Unit Chief
20 of 22

k|b]z ;/sf/
;+:s[lt tyf ko{6g dGqfno
ko{6g ljsf; cfof]hgf
O{sfO{ sfof{no, sf7df08f}
afudtL k|b]z
sfo{s|dsf] gfdM /ftf] s'df/L dlGb/ kl/;/df ef}lts k'jf{wf/ lgdf{0f -cGo ;fj{hlgs lgdf{0f_, sf7df8f}F
pkef]Qmf ;ldltsf] gfdM
:yfgM sf7df8f}F dxfgu/kflnsf j8f g !!, sf7df8f}F
s[=g+=M !!=^=@%=&(
Abstract of Cost
S.N Description Unit Quantity Rate Total amount Remarks
16 Providing and fixing Salwood works for beam joist column batten
Cum 0.87 297,438.09 258879.85
rafter on the roof
17 Carved Tudal fixing and placing of (3*8 inch sizes) Nos 7.00 15,255.00 106785.00

Total Amount 3,464,996.18

User Committe Prepared by Checked By Approved By


Gagan Sharma Dinesh Kunwar Dorn Bikram Karki
Sub-Engineer Engineer Unit Chief
21 of 21

k|b]z ;/sf/
;+:s[lt tyf ko{6g dGqfno
ko{6g ljsf; cfof]hgf
O{sfO{ sfof{no, sf7df08f}
afudtL k|b]z
sfo{sd| sf] gfdM /ftf] s'df/L dlGb/ kl/;/df ef}lts k'jf{wf/ lgdf{0f -cGo ;fj{hlgs lgdf{0f_, sf7df8f}F
pkef]Qmf ;ldltsf] gfdM
:yfgM sf7df8f}F dxfgu/kflnsf j8f g !!, sf7df8f}F
s[=g+=M !!=^=@%=&(
आयोजना र उपभो ाको िज मेवार वाँडफाँड
वकास उपभो ा/जन
.स ववरण ईकाइ प रमाण दर ज मा कैफ यत
योजना म
1 Site clearance before and after completion of
work Sqm 29.73 20.01 594.88 0.00 594.88
2 Earth work in exacavation by manual
means including removal of deleterious
matter all complete as per drawing and
Technical Specifications Cum 46.86 627.27 29396.16 0.00 29396.16
3 Backfill of earthwork for at required place and
compacting all complete as per instruction of
the site incharge Cum 28.65 1443.23 41345.69 0.00 41345.69
4 Providing and laying stone soling in level and
line as per drawings, specification &
instruction of site engineer. Cum 7.90 9833.59 77677.71 0.00 77677.71