Avance Valorizacion Abril
Avance Valorizacion Abril
PROYECTO: “MEJORAMIENTO DE VIVIENDA RURAL EN LOS CENTROS POBLADOS HUALCA Y KANAKATA - DISTRITO DE OCORURO; CENTROS POBLADOS AJOYANI CENTRA, CHAQUEYLLA Y
OTROS - DISTRITO DE PALLPATA - PROVINCIA DE ESPINAR - DEPARTAMENTO DE CUSCO”
UBICACIÓN:
Localidad: AJOYANI CENTRAL, CHAQUEYLLA, JARUMA CHAQUELLA, JARUMA SALLANI, JARUMA SORA, PRADO ESPERANZA, HUALCA, KANAKATA
Distrito: PALLPATA, OCORURO
Provincia: ESPINAR
Depart.: CUSCO
ENTIDAD: MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO
PROGRAMA NACIONAL DE VIVIENDA RURAL
PROYECTISTA: ING. GONZALO VICENTH HUARCAYA PORTILLA TO N° VIVIENDAS: 63
DESCRIPCION METRADOS
MEDIDAS
ITEM
ELEMENTO / L
No PLANO EJES DETALLE Nº VECES MET. X MET. TOTAL
/AREA A H No VIV
/CANT VIVIENDA
01. 01. 01. LIMPIEZA Y DESINFECCION DEL CENTRO DE TRABAJO glb 1.00 1.00
Por plazo de ejecucion 1.00 1.00 1.00
01. 01. 02. EVALUACION DE LAS CONDICIONES DE SALUD DEL TRABAJOR PREVIO AL INICIO A OBRA glb 1.00 1.00
Por plazo de ejecucion 1.00 1.00 1.00
01. 01. 04. SENSIBILIZACION DE LA PREVENCION DEL CONTAGIO EN EL CENTRO DE TRABAJO glb 1.00 1.00
Por plazo de ejecucion 1.00 1.00 1.00
01. 02. 01. PROCESO PARA INICIO DEL TRABAJO glb 1.00 1.00
Por plazo de ejecucion 1.00 1.00 1.00
02. 01. 02. EXCAVACION DE ZANJA HASTA H=1.00m (APORTE) m3 6.77 426.61
E-01 A Longitud de excavación de zanja 1.00 5.63 0.40 0.60 1.35 63.00 85.05
E-01 A' Longitud de excavación de zanja 1.00 3.01 0.40 0.60 0.72 63.00 45.51
E-01 B Longitud de excavación de zanja 1.00 5.63 0.40 0.60 1.35 63.00 85.05
E-01 C Longitud de excavación de zanja 1.00 3.02 0.40 0.60 0.72 63.00 45.59
E-01 1 Longitud de excavación de zanja 1.00 3.78 0.40 0.60 0.91 63.00 57.15
E-01 2 Longitud de excavación de zanja 1.00 3.38 0.40 0.60 0.81 63.00 51.11
E-01 3 Longitud de excavación de zanja 1.00 3.78 0.40 0.60 0.91 63.00 57.15
01. 05. 02. SUMINISTRO DE PIEDRA MEDIANA (APORTE) glb 2.26 142.20
E-01 A Longitud de nivelacion de cama de piedra para muro 1.00 5.63 0.40 0.20 0.45 63.00 28.35
E-01 A' Longitud de nivelacion de cama de piedra para muro 1.00 3.01 0.40 0.20 0.24 63.00 15.17
E-01 B Longitud de nivelacion de cama de piedra para muro 1.00 5.63 0.40 0.20 0.45 63.00 28.35
E-01 C Longitud de nivelacion de cama de piedra para muro 1.00 3.02 0.40 0.20 0.24 63.00 15.20
E-01 1 Longitud de nivelacion de cama de piedra para muro 1.00 3.78 0.40 0.20 0.30 63.00 19.05
E-01 2 Longitud de nivelacion de cama de piedra para muro 1.00 3.38 0.40 0.20 0.27 63.00 17.04
E-01 3 Longitud de nivelacion de cama de piedra para muro 1.00 3.78 0.40 0.20 0.30 63.00 19.05
03. 01. 03. NIVELACION RELLENO Y APISONADO DE CAMA DE PIEDRA MEDIANA ( APORTE) m3 2.26 142.20
E-01 A Longitud de nivelacion de cama de piedra para muro 1.00 5.63 0.40 0.20 0.45 63.00 28.35
E-01 A' Longitud de nivelacion de cama de piedra para muro 1.00 3.01 0.40 0.20 0.24 63.00 15.17
E-01 B Longitud de nivelacion de cama de piedra para muro 1.00 5.63 0.40 0.20 0.45 63.00 28.35
E-01 C Longitud de nivelacion de cama de piedra para muro 1.00 3.02 0.40 0.20 0.24 63.00 15.20
E-01 1 Longitud de nivelacion de cama de piedra para muro 1.00 3.78 0.40 0.20 0.30 63.00 19.05
E-01 2 Longitud de nivelacion de cama de piedra para muro 1.00 3.38 0.40 0.20 0.27 63.00 17.04
E-01 3 Longitud de nivelacion de cama de piedra para muro 1.00 3.78 0.40 0.20 0.30 63.00 19.05
DESCRIPCION METRADOS
MEDIDAS
ITEM
ELEMENTO / L
No PLANO EJES DETALLE Nº VECES MET. X MET. TOTAL
/AREA A H No VIV
/CANT VIVIENDA
E-01 3: C-A' Longitud de sobrecimiento para muro 1.00 3.22 0.25 0.35 0.28 63.00 17.75
PLANILLA DE METRADOS
PROYECTO: “MEJORAMIENTO DE VIVIENDA RURAL EN LOS CENTROS POBLADOS HUALCA Y KANAKATA - DISTRITO DE OCORURO; CENTROS POBLADOS AJOYANI CENTRA, CHAQUEYLLA Y
OTROS - DISTRITO DE PALLPATA - PROVINCIA DE ESPINAR - DEPARTAMENTO DE CUSCO”
UBICACIÓN:
Localidad: AJOYANI CENTRAL, CHAQUEYLLA, JARUMA CHAQUELLA, JARUMA SALLANI, JARUMA SORA, PRADO ESPERANZA, HUALCA, KANAKATA
Distrito: PALLPATA, OCORURO
Provincia: ESPINAR
Depart.: CUSCO
ENTIDAD: MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO
PROGRAMA NACIONAL DE VIVIENDA RURAL
PROYECTISTA: ING. GONZALO VICENTH HUARCAYA PORTILLA TO N° VIVIENDAS: 63
DESCRIPCION METRADOS
MEDIDAS
ITEM
ELEMENTO / L
No PLANO EJES DETALLE Nº VECES MET. X MET. TOTAL
/AREA A H No VIV
/CANT VIVIENDA
04. 01. 03. ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 COLUMNAS kg 11,521.44
E-01 Calculo de Acero Corrugado 1.00 182.88 63.00 11,521.44
04. 02. 03. ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 PARA VIGAS kg 5,632.20
E-01 Calculo de Acero Corrugado 1.00 89.40 63.00 5,632.20
06. 02. 00. CUMBRERA CALAMINA 0.30 mm, 11 CANALES INCL PINTADO m 6.15 387.64
PLANILLA DE METRADOS
PROYECTO: “MEJORAMIENTO DE VIVIENDA RURAL EN LOS CENTROS POBLADOS HUALCA Y KANAKATA - DISTRITO DE OCORURO; CENTROS POBLADOS AJOYANI CENTRA, CHAQUEYLLA Y
OTROS - DISTRITO DE PALLPATA - PROVINCIA DE ESPINAR - DEPARTAMENTO DE CUSCO”
UBICACIÓN:
Localidad: AJOYANI CENTRAL, CHAQUEYLLA, JARUMA CHAQUELLA, JARUMA SALLANI, JARUMA SORA, PRADO ESPERANZA, HUALCA, KANAKATA
Distrito: PALLPATA, OCORURO
Provincia: ESPINAR
Depart.: CUSCO
ENTIDAD: MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO
PROGRAMA NACIONAL DE VIVIENDA RURAL
PROYECTISTA: ING. GONZALO VICENTH HUARCAYA PORTILLA TO N° VIVIENDAS: 63
DESCRIPCION METRADOS
MEDIDAS
ITEM
ELEMENTO / L
No PLANO EJES DETALLE Nº VECES MET. X MET. TOTAL
/AREA A H No VIV
/CANT VIVIENDA
DESCRIPCION METRADOS
MEDIDAS
ITEM
ELEMENTO / L
No PLANO EJES DETALLE Nº VECES MET. X MET. TOTAL
/AREA A H No VIV
/CANT VIVIENDA
08. 02. 00. SUMINISTRO E INSTALACION DE POLIESTIRENO DE 1" DENSIDAD 10 m2 54.53 3,435.38
Area total interior 2.00 3.60 1.95 14.04 63.00 884.52
2.00 3.60 1.95 14.04 63.00 884.52
2.00 3.68 1.95 14.35 63.00 904.18
2.00 2.07 1.95 8.07 63.00 508.60
6.00 0.78 0.86 4.02 63.00 253.56
0.00
08. 03. 00. BRUÑAS DE MUROS DE LADRILLO m 284.96 17,952.62
Longitud total de bruñas m x m2 7.00 2.04 1.95 27.85 63.00 1,754.30
7.00 2.04 1.95 27.85 63.00 1,754.30
7.00 1.56 1.95 21.29 63.00 1,341.52
7.00 0.78 0.86 4.70 63.00 295.82
7.00 2.45 1.95 33.44 63.00 2,106.88
7.00 1.25 1.95 17.06 63.00 1,074.94
7.00 0.78 0.86 4.70 63.00 295.82
7.00 1.25 1.95 17.06 63.00 1,074.94
7.00 1.36 1.95 18.56 63.00 1,169.53
7.00 1.33 1.95 18.15 63.00 1,143.73
7.00 1.23 1.95 16.79 63.00 1,057.74
7.00 0.78 0.86 4.70 63.00 295.82
7.00 1.56 1.95 21.29 63.00 1,341.52
7.00 1.00 2.76 19.32 63.00 1,217.16
7.00 1.00 2.76 19.32 63.00 1,217.16
7.00 1.00 0.72 5.04 63.00 317.52
7.00 1.00 0.56 3.92 63.00 246.96
7.00 1.00 0.56 3.92 63.00 246.96
09. 00. 00. REVOQUES
09. 01. BOTA AGUA EN VANO DE VENTANA CON CORTA GOTERA. CON MORTERO 1:4 E= 1.5 CM m2 0.70 44.23
Bota agua en vanos de ventana 3.00 0.78 0.3 0.70 63.00 44.23
DESCRIPCION METRADOS
MEDIDAS
ITEM
ELEMENTO / L
No PLANO EJES DETALLE Nº VECES MET. X MET. TOTAL
/AREA A H No VIV
/CANT VIVIENDA
A-01, D-03 C: 2-4 Area interior -Dormitorio 02 5.38 1.00 5.38 63.00 338.94
11. 03. 00. PISO DE CEMENTO PULIDO E:4" ACAB. CON OCRE INC. BRUÑADO m2 19.90 1,253.70
A-01, D-02 C: 2-3 Area interior -espacio social 1.00 9.51 9.51 63.00 599.13
A-01, D-02 C: 2-3 Area interior -Dormitorio 01 5.01 1.00 5.01 63.00 315.63
A-01, D-03 C: 2-4 Area interior -Dormitorio 02 5.38 1.00 5.38 63.00 338.94
12
### 0 0 VEREDAS
12. 01. 00. NIVELACION, RELLENO Y APISONADO INTERIOR C/MAT PROPIO (APORTE) m2 2.40 151.20
A-01 2-3:A-B Area exterior frontal para vereda 1.00 2.40 1.00 2.40 63.00 151.20
12. 02. 0 VEREDA DE CONCRETO SIMPLE F'C=140 KG/CM2 E= 10 CM ACABADO FROTACHADO INCLUYE BRUÑADO m2 2.40 151.20
A-01 2-3:A-B Area exterior frontal para vereda 1.00 2.40 1.00 2.40 63.00 151.20
13. 02. 00. CONTRAZOCALO DE MADERA CON RODON, DE 5.80 CM X 1.90 CM X 2.40 M m 16.92 1,065.96
Long dorm 01 8.26 8.26 63.00 520.38
Long dorm 02 8.66 8.66 63.00 545.58
14. PUERTAS
14. 01. 00. PUERTA MACHIHEMBRADA DE 0.90X2.10 M. INCLUYE. INSTALACION und 1.00 63.00
A-01, D-08 Puerta Exterior P1, incl instalacion. Según lo indicado en planos 1.00 1.00 1.00 63.00 63.00
14. 02. 00. PUERTA MACHIHEMBRADA DE 0.90X2.10 M. INCLUYE. INSTALACION und 1.00 63.00
A-01, D-09 Puerta Interior P2 , incl instalacion. Según lo indicado en planos 1.00 1.00 1.00 63.00 63.00
14. 03. 00. PUERTA CONTRAPLACADA DE 0.90X2.10 M. INCLUYE. INSTALACION und 2.00 126.00
A-01, D-10 Puerta Interior P3, incl instalacion. Según lo indicado en planos 2.00 1.00 2.00 63.00 126.00
15. VENTANAS
15. 01. 00. VENTANA DE ALUMINIO DE 0.78 X 1.08 M INC/VIDRIO, CON CONTRAVENTANA DE MADERA und 3.00 189.00
Ventana de aluminio, incl instalacion. Según lo indicado en planos 3.00 1.00 3.00 63.00 189.00
###
17. 00. 00. EVACUACION AGUAS PLUVIALES
17.### 01. 0 SISTEMA DE EVACUACION DE AGUAS PLUVIALES und 2.00 126.00
Sistema de evacuacion de aguas pluviales (Canaleta y montante) 2.00 2.00 63.00 126.00
17.### 03. 0 CONCRETO SIMPLE f'c=100 kg/cm2 PARA DADOS DE PROTECCION m3 2.76
Volumen de dados de concreto 2.00 0.25 0.25 0.35 0.04 63.00 2.76
19. ACARREOS
19. 01. ACARREO DE MATERIAL EXCEDENTE Y LIMPIEZA DE OBRA FINAL (APORTE) 0 1.00 63.00
Global 1.00 1.00 63.00 63.00
20 0 0 FLETES
20 01. 0 FLETE Y TRANSPORTE DE MATERIALES
20. 01. 01. FLETE TERRESTRE TRANSP. MATERIALES DEL PROVEEDOR AL ALMACEN (INCL. CARGA-DESCARGA) glb 1.00 1.00
Ver calculo de flete de materiales. El valor de este metrado se debera dejar como 1, solo se modifica el P.U 1.00 1.00 1.00 1.00 1.00
20. 01. 02. FLETE TERRESTRE TRANSP. MATERIALES DE ALMACEN A PUNTA DE CARRETERA (INCL. CARGA-DESCARGA) glb 1.00 1.00
Ver calculo de flete de materiales. El valor de este metrado se debera dejar como 1, solo se modifica el P.U 1.00 1.00 1.00 1.00 1.00
20. 01. 03. FLETE RURAL DE MATERIALES PUNTA DE CARRETERA A VIVIENDA (APORTE) glb 1.00 1.00
Ver calculo de flete de materiales. El valor de este metrado se debera dejar como 1, solo se modifica el P.U 1.00 1.00 1.00 1.00 1.00
20. 01. 04. ACOMPAÑAMIENTO, CARGA Y DESCARGA TRANSP. DE MATERIALES PUNTA DE CARRETERA A VIVIENDA (APORTE) glb 1.00 1.00
Ver calculo de flete de materiales. El valor de este metrado se debera dejar como 1, solo se modifica el P.U 1.00 1.00 1.00 1.00 1.00
20. 02. 02. FLETE TERRESTRE TRANSP. PIEDRA DE CANTERA A PUNTA DE CARRETERA (INCL. CARGA-DESCARGA) 0.00 1.00
Ver calculo de flete de agregados y piedra. El valor de este metrado se debera dejar como 1, solo se modifica el P.U 1.00 1.00 1.00 1.00 1.00
20. 02. 03. FLETE TERRESTRE TRANSP. DE AGREGADO Y PIEDRA DE PUNTA DE CARRETERA A VIVIENDA (APORTE) glb 1.00
Ver calculo de flete de agregados y piedra. El valor de este metrado se debera dejar como 1, solo se modifica el P.U 1.00 1.00 1.00 1.00 1.00
20. 02. 04. ACOMPAÑAMIENTO, CARGA Y DESCARGA TRANSP. DE AGREGADO Y PIEDRA DE PUNTA DE CARRETERA A VIVIENDA (A glb 1.00
Ver calculo de flete de agregados y piedra. El valor de este metrado se debera dejar como 1, solo se modifica el P.U 1.00 1.00 1.00 1.00 1.00
PRESUPUESTO
PARTIDA DESCRIPCIÓN
Unid. Metrado P.Unit. S/.
OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD
01
Y SALUD
01.01.02 EVALUACION DE LAS CONDICIONES DE SALUD DEL TRABAJOR glb 1.00 250.00
PREVIO AL INICIO A OBRA
02 MOVIMIENTO DE TIERRAS
02.01 EXCAVACIONES
CORTE Y EXPLANACIÒN DE TERRENO NORMAL MANUAL
02.01.01 m3 1310.59 22.79
(APORTE)
m3 426.61 22.79
02.01.02 EXCAVACION DE ZANJA HASTA H=1.00m (APORTE)
m3 142.20 32.50
03.01.02 SUMINISTRO DE PIEDRA MEDIANA (APORTE)
m3 142.20 37.39
03.01.03 NIVELACION RELLENO Y APISONADO DE CAMA DE PIEDRA MEDIA
03.02 SOBRECIMIENTOS
m3 110.57 159.30
03.02.01 SOBRECIMIENTOS MEZCLA CEMENTO-HORMIGON 1:8 + 30% PM
m2 1078.37 23.63
03.02.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO h=0.35m
04 CONCRETO ARMADO
04.01 COLUMNAS
m3 80.68 318.52
04.01.01 CONCRETO COLUMNAS f'c=175 kg/cm2
m2 902.95 31.53
04.01.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS
kg 11521.44 4.98
04.01.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 COLUMNAS
04.02 VIGAS
m3 99.09 282.06
04.02.01 CONCRETO VIGAS f'c=175 kg/cm2
m2 1030.26 36.46
04.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS
kg 5632.20 4.98
04.02.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 PARA VIGAS
05 TIJERALES Y RETICULADOS
p2 3996.06 6.96
05.01 CORREAS DE MADERA 2"X2"
p2 482.28 7.72
05.01 FRISO DE MADERA DE 1 1/2" X 2 1/2"
m2 2585.65 41.89
06.01 COBERTURA DE PLANCHA CORRUGADA GALVANIZADA
m 387.64 21.78
06.01 CUMBRERA CALAMINA 0.30 mm, 11 CANALES INCL PINTADO
07 CIELO RASOS
CIELORASO CON PLACA DE YESO LAMINADO CON VINYL Y FOIL
07.01 DE ALUMINIO 0.61x0.61 e=6MM / INC. ACCESORIOS E m 1135.26 55.00
INSTALACION
08 MUROS
m2 4599.00 52.17
08.01 MURO DE LADRILLO TIPO PANDERETA MEDIDAS SEGUN PLANO
m2 3435.38 13.60
08.02 SUMINISTRO E INSTALACION DE POLIESTIRENO DE 1" DENSIDAD
m 17952.62 1.56
08.03 BRUÑAS DE MUROS DE LADRILLO
09 REVOQUES
BOTA AGUA EN VANO DE VENTANA CON CORTA GOTERA. CON
09.01 m2 44.23 25.77
MORTERO 1:4 E= 1.5 CM
10 ENLUCIDO DE YESO
m2 3860.10 17.17
10.01 ENLUCIDO DE YESO EN MURO DE LADRILLO
m 1979.46 9.42
10.02 DERRAMES DE VANOS CON YESO E=1.5CM
11 PISOS
m2 1253.70 4.73
11.01 BASE DE TIERRA MATERIAL PROPIO COMPACTADO/NIVELADO E=
m2 1253.70 9.04
11.02 ACERO DE TEMPERATURA
m2 1253.70 27.24
11.03 PISO DE CEMENTO PULIDO E:4" ACAB. CON OCRE INC. BRUÑADO
12 VEREDAS
m2 151.20 4.73
12.01 NIVELACION, RELLENO Y APISONADO INTERIOR C/MAT PROPIO (A
VEREDA DE CONCRETO SIMPLE F'C=140 KG/CM2 E= 10 CM
12.02 m2 151.20 32.27
ACABADO FROTACHADO INCLUYE BRUÑADO
m2 44.13 22.98
12.03 ENCOFRADO Y DESENCOFRADO DE VEREDAS
13 ZOCALOS Y CONTRAZOCALOS
ZOCALO DE CEMENTO SOBRE MURO EXTERIOR H=58 CM E= 2
13.01 m2 720.20 25.17
CM INCLUYE BRUÑAS
m 1065.96 8.41
13.02 CONTRAZOCALO DE MADERA CON RODON, DE 5.80 CM X 1.90 CM X
0.00
14 PUERTAS
15 VENTANAS
VENTANA DE ALUMINIO DE 0.78 X 1.08 M INC/VIDRIO, CON
15.01 und 189.00 348.53
CONTRAVENTANA DE MADERA
m2 44.10 24.67
17.02 ENCOFRADO Y DESENCOFRADO DE DADOS DE CONCRETO.
m3 2.76 218.05
17.03 CONCRETO SIMPLE f'c=100 kg/cm2 PARA DADOS DE PROTECCION
18 MITIGACION Y LIMPIEZA
0.00
19 ACARREOS
20 FLETES
465.00 0
250.00 0
1,740.00 0
2,940.00 0
8,625.00 0
473.32 0
5,915.70 0
1,677.06 0
454.86 0
2,835.00 0
9,722.44 345.27 20.31 27.08 27.08 27.08 20.31 20.31 20.31 27.08 20.31 27.08
36,134.29 0
4,621.50 0
5,316.86 0
0.00
17,613.80 0
25,481.88 0
0.00
0.00
25,698.19 0
28,470.01 0
57,376.77 0
0.00
27,949.33 0
37,563.28 0
28,048.36 0
0.00
56,420.28 0
27,812.58 0
3,723.20 0
0.00
108,312.88 0
8,442.80 0
0.00
62,439.30 0
0.00
239,929.83 0
46,721.17 0
28,006.09 0
0.00
1,139.81 0
0.00
66,277.92 0
18,646.51 0
0.00
5,930.00 0
11,333.45 0
34,150.79 0
0.00
715.18 0
4,879.22 0
1,014.11 0
0.00
18,127.43 0
8,964.72 0
0.00
39,693.15 0
27,797.49 0
39,214.98 0
0.00
65,872.17 0
18,697.14 0
0.00
22,630.23 0
0.00
36,237.60 0
1,087.95 0
601.82 0
0.00
8,617.14 0
0.00
17,234.91 0
0.00
0.00
83,881.62 0.2
17,192.30 0.1
23,291.26 0
14,728.95 0
41,540.62 0.1
10,359.14 0
62,974.69 0.5
39,008.32 0
NDIENTE AL MES DE MARZO DEL 2021
ACUMULADO
ACUMULADO
V S D L M M MENSUAL SALDO
TOTAL
ACTUAL
26 27 28 29 30 31
1.00
0.00 0.00
1.00
0.00 0.00
1.00
0.00 0.00
1.00
0.00 0.00
0.00
0.00 0.00
1.00
0.00 0.00
0.00
0.00 0.00
1.00
0.00 0.00
0.00
0.00
499.07 0.00
2621.18
0.00
0.00
63.00
0.00 0.00
63.00
0.00 0.00
63.00
0.00 0.00
63.00
0.00 0.00
0.00
0.00
0.00
0.00
187.39
62.40 1123.20
-263.93
20.31 20.31 20.31 27.08 20.31 345.27 690.54
0.00
0.00
0.00
0.00
284.41
0.00 0.00
142.20
0.00 0.00
142.20
0.00 0.00
0.00
0.00 0.00
110.57
0.00 0.00
1078.37
0.00 0.00
0.00
0.00 0.00
0.00
0.00 0.00
80.68
0.00 0.00
902.95
0.00 0.00
11521.44
0.00 0.00
0.00
0.00 0.00
99.09
0.00 0.00
1030.26
0.00 0.00
5632.20
0.00 0.00
0.00
0.00 0.00
252.00
0.00 0.00
3996.06
0.00 0.00
482.28
0.00 0.00
0.00
0.00 0.00
2585.65
0.00 0.00
387.64
0.00 0.00
0.00
0.00 0.00
0.00 1135.26
0.00
0.00
0.00 0.00
4599.00
0.00 0.00
3435.38
0.00 0.00
17952.62
0.00 0.00
0.00
0.00 0.00
0.00 44.23
0.00
0.00
0.00 0.00
3860.10
0.00 0.00
1979.46
0.00 0.00
0.00
0.00 0.00
1253.70
0.00 0.00
1253.70
0.00 0.00
1253.70
0.00 0.00
0.00
0.00 0.00
151.20
0.00 0.00
0.00 151.20
0.00
44.13
0.00 0.00
0.00
0.00 0.00
0.00 720.20
0.00
1065.96
0.00 0.00
0.00
0.00 0.00
63.00
0.00 0.00
63.00
0.00 0.00
126.00
0.00 0.00
0.00
0.00 0.00
0.00 189.00
0.00
63.00
0.00 0.00
0.00
0.00 0.00
63.00
0.00 0.00
0.00
0.00 0.00
126.00
0.00 0.00
44.10
0.00 0.00
2.76
0.00 0.00
0.00
0.00 0.00
63.00
0.00 0.00
0.00
0.00 0.00
63.00
0.00 0.00
0.00
0.00 0.00
0.00
0.00 0.00
0.00 1.00
0.00
0.00 1.00
0.00
0.00
0.00 0.00
0.00 1.00
0.00
0.00 1.00
0.00
PRESUPUESTO
PARTIDA DESCRIPCIÓN
Unid. Metrado P.Unit. S/.
OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y
01
SALUD
02 MOVIMIENTO DE TIERRAS
02.01 EXCAVACIONES
CORTE Y EXPLANACIÒN DE TERRENO NORMAL MANUAL
02.01.01 m3 1310.59 22.79
(APORTE)
m3 426.61 22.79
02.01.02 EXCAVACION DE ZANJA HASTA H=1.00m (APORTE)
03.01 CIMIENTOS
CIMIENTO CORRIDO DE CONCRETO CICLOPEO MEZCLA
03.01.01 m3 284.41 127.05
CEMENTO HORMIGON 1:10 + 50% P.G.
m3 142.20 32.50
03.01.02 SUMINISTRO DE PIEDRA MEDIANA (APORTE)
m3 142.20 37.39
03.01.03 NIVELACION RELLENO Y APISONADO DE CAMA DE PIEDRA MEDIAN
03.02 SOBRECIMIENTOS
m3 110.57 159.30
03.02.01 SOBRECIMIENTOS MEZCLA CEMENTO-HORMIGON 1:8 + 30% PM
m2 1078.37 23.63
03.02.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO h=0.35m
04 CONCRETO ARMADO
04.01 COLUMNAS
m3 80.68 318.52
04.01.01 CONCRETO COLUMNAS f'c=175 kg/cm2
m2 902.95 31.53
04.01.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS
kg 11521.44 4.98
04.01.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 COLUMNAS
04.02 VIGAS
m3 99.09 282.06
04.02.01 CONCRETO VIGAS f'c=175 kg/cm2
m2 1030.26 36.46
04.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS
kg 5632.20 4.98
04.02.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 PARA VIGAS
05 TIJERALES Y RETICULADOS
und 252.00 223.89
05.01 TIJERAL DE MADERA DE 2"X4"
p2 3996.06 6.96
05.01 CORREAS DE MADERA 2"X2"
p2 482.28 7.72
05.01 FRISO DE MADERA DE 1 1/2" X 2 1/2"
07 CIELO RASOS
CIELORASO CON PLACA DE YESO LAMINADO CON VINYL Y FOIL DE
07.01 m 1135.26 55.00
ALUMINIO 0.61x0.61 e=6MM / INC. ACCESORIOS E INSTALACION
08 MUROS
m2 4599.00 52.17
08.01 MURO DE LADRILLO TIPO PANDERETA MEDIDAS SEGUN PLANO
m2 3435.38 13.60
08.02 SUMINISTRO E INSTALACION DE POLIESTIRENO DE 1" DENSIDAD 10
m 17952.62 1.56
08.03 BRUÑAS DE MUROS DE LADRILLO
09 REVOQUES
BOTA AGUA EN VANO DE VENTANA CON CORTA GOTERA. CON
09.01 m2 44.23 25.77
MORTERO 1:4 E= 1.5 CM
10 ENLUCIDO DE YESO
m2 3860.10 17.17
10.01 ENLUCIDO DE YESO EN MURO DE LADRILLO
m 1979.46 9.42
10.02 DERRAMES DE VANOS CON YESO E=1.5CM
11 PISOS
m2 1253.70 4.73
11.01 BASE DE TIERRA MATERIAL PROPIO COMPACTADO/NIVELADO E= 10
m2 1253.70 9.04
11.02 ACERO DE TEMPERATURA
m2 1253.70 27.24
11.03 PISO DE CEMENTO PULIDO E:4" ACAB. CON OCRE INC. BRUÑADO
12 VEREDAS
m2 151.20 4.73
12.01 NIVELACION, RELLENO Y APISONADO INTERIOR C/MAT PROPIO (AP
VEREDA DE CONCRETO SIMPLE F'C=140 KG/CM2 E= 10 CM
12.02 m2 151.20 32.27
ACABADO FROTACHADO INCLUYE BRUÑADO
m2 44.13 22.98
12.03 ENCOFRADO Y DESENCOFRADO DE VEREDAS
13 ZOCALOS Y CONTRAZOCALOS
ZOCALO DE CEMENTO SOBRE MURO EXTERIOR H=58 CM E= 2 CM
13.01 m2 720.20 25.17
INCLUYE BRUÑAS
m 1065.96 8.41
13.02 CONTRAZOCALO DE MADERA CON RODON, DE 5.80 CM X 1.90 CM X 2
0.00
14 PUERTAS
und 63.00 630.05
14.01 PUERTA MACHIHEMBRADA DE 0.90X2.10 M. INCLUYE. INSTALACION
und 63.00 441.23
14.02 PUERTA CONTRAPLACADA DE 0.90X2.10 M. INCLUYE. INSTALACION
und 126.00 311.23
14.03 PUERTA CONTRAPLACADA DE 0.80X2.10 M. INCLUYE. INSTALACION
15 VENTANAS
VENTANA DE ALUMINIO DE 0.78 X 1.08 M INC/VIDRIO, CON
15.01 und 189.00 348.53
CONTRAVENTANA DE MADERA
und 63.00 296.78
15.02 VENTANA CENITAL
16 INSTALACIONES ELECTRICAS
glb 63.00 359.21
16.01 INSTALACION ELECTRICA EN MÓDULO
18 MITIGACION Y LIMPIEZA
glb 63.00 136.78
18.01 MITIGACION DEL IMPACTO AMBIENTAL (APORTE)
0.00
19 ACARREOS
glb 63.00 273.57
19.01 ACARREO DE MATERIAL EXCEDENTE Y LIMPIEZA DE OBRA FINAL (A
20 FLETES
0
124.83 166.44 166.44 166.44 124.83 124.83
3,800.71 0 873.81 1267.02
0.00 0
0.00
0.00
0.00
0.00 0
0.00 0
62,439.30 0 0.00 0.00
0.00 0
1,139.81 0.00 0.00
0.00 0
0.00
5,930.00 0 0.00 0.00
0.00
0
18,127.43 0 0.00 0.00
0
65,872.17 0.00 0.00
0.2
0.00% 0.00%
0.00 0.00
0.00% 0.00%
0.00 0.00
0.00% 0.00%
0.00 0.00
0.00% 0.00%
0.00 0.00
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
33.33% 31.74%
62.4 83.2 62.4 83.2 62.4 62.4 416.00 9480.64
33.33% 31.74%
20.31 27.08 20.31 27.08 20.31 20.31 135.40 3085.77
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
0.00% 0.00%
0.00 0.00
0.00% 0.00%
0.00 0.00
0.00% 0.00%
0.00 0.00
#DIV/0! #DIV/0!
0.00% 0.00%
0.00 0.00
0.00% 0.00%
0.00 0.00
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
0.00% 0.00%
0.00 0.00
0.00% 0.00%
0.00 0.00
0.00% 0.00%
0.00 0.00
#DIV/0! #DIV/0!
0.00% 0.00%
0.00 0.00
0.00% 0.00%
0.00 0.00
0.00% 0.00%
0.00 0.00
#DIV/0! #DIV/0!
0.00% 0.00%
0.00 0.00
0.00% 0.00%
0.00 0.00
0.00% 0.00%
0.00 0.00
#DIV/0! #DIV/0!
0.00% 0.00%
0.00 0.00
0.00% 0.00%
0.00 0.00
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
0.00% 0.00%
0.00 0.00
0.00% 0.00%
0.00 0.00
0.00% 0.00%
0.00 0.00
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
0.00% 0.00%
0.00 0.00
0.00% 0.00%
0.00 0.00
#DIV/0! #DIV/0!
0.00% 0.00%
0.00 0.00
0.00% 0.00%
0.00 0.00
0.00% 0.00%
0.00 0.00
#DIV/0! #DIV/0!
0.00% 0.00%
0.00 0.00
0.00% 0.00 0.00 0.00%
0.00% 0.00%
0.00 0.00
#DIV/0! #DIV/0!
0.00% 0.00%
0.00 0.00
#DIV/0! #DIV/0!
0.00% 0.00%
0.00 0.00
0.00% 0.00%
0.00 0.00
0.00% 0.00%
0.00 0.00
#DIV/0! #DIV/0!
0.00% 0.00%
0.00 0.00
#DIV/0! #DIV/0!
0.00% 0.00%
0.00 0.00
#DIV/0! #DIV/0!
0.00% 0.00%
0.00 0.00
0.00% 0.00%
0.00 0.00
0.00% 0.00%
0.00 0.00
#DIV/0! #DIV/0!
0.00% 0.00%
0.00 0.00
#DIV/0! #DIV/0!
0.00% 0.00%
0.00 0.00
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
1.00
VALORIZACIÓN DE AVANCE
PRESUPUESTO
PARTIDA DESCRIPCIÓN
Unid. Metrado
COSTO DIRECTO
COSTO INDIRECTO
COSTO TOTAL
FORMATO N° 11
VALORIZACIÓN DE AVANCE DE OBRA N° 01 DEL 15 DE MARZO AL 31 DE MARZO DEL 2021
CORRESPONDIENTE AL MES DE :
PRESUPUESTO AVANCE
ANTERIOR ACTUAL
Valorizado Valorizado
P.Unit. S/. Presup. Metrado % Metrado %
S/. S/.
0.00
465.00 465.00 0.00 0.00 0.00% 0.00 0.00 0.00%
250.00 250.00 0.00 0.00
0.00 0.00% 0.00 0.00%
1,740.00 1,740.00 0.00 0.00 0.00% 0.00 0.00 0.00%
2,940.00 2,940.00 0.00 0.00
0.00 0.00% 0.00 0.00%
1,981,523.24
ENTE AL MES DE : MARZO DEL 2021
SALDO
ACUMULADO
Valorizado Valorizado
Metrado % Metrado %
S/. S/.
0.00
0.00 0.00 0.00% 1.00 465.00 100.00%
0.00 250.00
0.00 0.00% 1.00 100.00%
0.00 0.00 0.00% 1.00 1,740.00 100.00%
0.00 2,940.00
0.00 0.00% 1.00 100.00%
0.00 36,134.29
0.00 0.00% 284.41 100.00%
0.00 0.00 0.00% 142.20 4,621.50 100.00%
0.00 0.00 0.00% 142.20 5,316.86 100.00%
FECHA DE PRESENTACIÓN:
VALORIZACIÓN DE AVANCE
PRESUPUESTO
PARTIDA DESCRIPCIÓN
Unid. Metrado
COSTO DIRECTO
COSTO INDIRECTO
COSTO TOTAL
FORMATO N° 11
VALORIZACIÓN DE AVANCE DE OBRA N° 01 DEL 15 DE MARZO AL 31 DE MARZO DEL 2021
CORRESPONDIENTE AL MES DE :
Valorizado Valorizado
P.Unit. S/. Presup. Metrado % Metrado %
S/. S/.
5,395.00 1,079.00
465.00 465.00 0.20 93.00 20.00% 0.20 93.00 20.00%
250.00 250.00 50.00 50.00
0.20 20.00% 0.20 20.00%
1,740.00 1,740.00 0.20 348.00 20.00% 0.20 348.00 20.00%
2,940.00 2,940.00 588.00 588.00
0.20 20.00% 0.20 20.00%
129.79%
ENTE AL MES DE : MARZO DEL 2021
0.00 0.00
0.00% 0.00% 0.00 23,291.26 0.0000000000000
0.00 0.00
0.00% 0.00% 0.00 14,728.95 0.0000000000000
0.00 0.0000000000000
0.00 0.00
0.00% 0.00% 0.00 41,540.62 0.0000000000000
0.00 0.00
0.00% 0.00% 0.00 10,359.14 0.0000000000000
0.00 0.00
0.00% 0.00% 0.00 62,974.69 0.0000000000000
0.00 0.00
0.00% 0.00% 0.00 39,008.32 0.0000000000000
29.32% S/. 236,935.17 14.05%
CORRESPONDIENTE AL MES DE :
FECHA DE PRESENTACIÓN:
CONVENIO N° 318-2020-CUS/VMVU/PNVR
PROYECTO “MEJORAMIENTO DE VIVIENDA RURAL EN LOS CENTROS POBLADOS HUALCA Y KANAKATA - DISTRIT
FECHA 3/10/2021
Programado 473.32
3.00 TRABAJOS PRELIMINARES 473.32
Ejecutado
Programado
8.00 CONCRETO ARMADO 205,105.94
Ejecutado
TIJERALES Y Programado
9.00 87,956.06
RETICULADOS
Ejecutado
COBERTURA DE PLANCHA Programado
10.00 CORRUGADA 116,755.68
GALVANIZADA Ejecutado
Programado
11.00 CIELO RASOS 62,439.30
Ejecutado
Programado
12.00 MUROS 314,657.09
Ejecutado
Programado
13.00 REVOQUES 1,139.81
Ejecutado
Programado
14.00 ENLUCIDO DE YESO 84,924.43
Ejecutado
Programado
15.00 PISOS 51,414.24
Ejecutado
Programado
16.00 VEREDAS 6,608.51
Ejecutado
ZOCALOS Y Programado
17.00 27,092.15
CONTRAZOCALOS
Ejecutado
Programado
18.00 PUERTAS 106,705.62
Ejecutado
Programado
19.00 VENTANAS 84,569.31
Ejecutado
INSTALACIONES Programado
20.00 22,630.23
ELECTRICAS
Ejecutado
Programado
22.00 MITIGACION Y LIMPIEZA 8,617.14
Ejecutado
Programado
23.00 ACARREOS 17,234.91
Ejecutado
Programado
24.00 FLETE 292,976.90
Ejecutado
Programad 14,965.09 14,492.32 7,961.49
COSTO DIRECTO 1,686,690.46
Ejecutado 0.00 0.00 0.00
P = PROGRAMADO 0.89% 0.86% 0.85%
AVANCE SEMANAL (%)
E = EJECUTADO 0.00% 0.00% 0.00%
AVANCE ACUMULADO P = PROGRAMADO 0.89% 1.75% 2.60%
(%) E = EJECUTADO 0.00% 0.00% 0.00%
37,418.90
FORMATO N° 23
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA
UALCA Y KANAKATA - DISTRITO DE OCORURO; CENTROS POBLADOS AJOYANI CENTRA, CHAQUEYLLA Y OTROS - DISTRITO DE PALLPATA - PR
5,277.36 5,277.36
1,751.50 1,751.40
39,332.14 39,332.14 39,332.14 31,465.71 7,866.41 23,599.28 23,599.28
8,492.44 8,492.44
3,084.85 3,084.85
118,487.98 78,991.98
PRESUPUESTO TOTAL :
4,753.80 4,753.79
95,496.94
AMPLIACION DE PLAZO
FECHA Nº DIAS PLAZO VIGENTE FIN DE OBRA
S/. 1´249,535.59
S/. 1´034,346.59
8,625.00
0.00
473.32
0.00
3,800.71
0.00
10,882.62
0.00
39,590.79
0.00
89,168.33
0.00
10,363.42 2,339.02 2,339.02 2,339.02 2,339.02
205,105.94
0.00
4,397.80 2,198.90 2,198.90 2,198.90 2,198.91
87,956.06
0.00
8,756.68 8,756.68 8756.67583 8756.67583 8,756.68 5,837.78 5,837.78
116,755.68
0.00
4,682.95 6,243.93 6,243.93 6,243.93 6,243.93 3,121.97 3,121.97
62,439.30
0.00
9,439.71
314,657.09
0.00
199.47 199.47 199.47 199.47 341.95
1,139.81
0.00
4,246.21
84,924.43
0.00
1,542.43 2,570.71 2,570.71 2,570.71 2,570.72 5,141.42 5,141.42
51,414.24
0.00
1,321.70 1,321.70 1,321.70 1321.70408 1,321.70
6,608.51
0.00
543.82 3,162.40 4,370.90 5,267.37 5,267.37 3,585.88
27,092.15
0.00
17,784.27 35,568.54 35,568.54 17,784.27
106,705.62
0.00
14,094.89 28,189.77 28,189.77 14,094.89
84,569.31
0.00
2,828.78 2,828.78 5,657.56 5,657.56 5,657.56
22,630.23
0.00
4,740.92 9,481.84 9,481.84 9,481.84 4,740.93
37,927.37
0.00
2,154.29 4,308.57 2,154.29
8,617.14
0.00
4,308.73 8,617.46 4,308.73
17,234.91
0.00
292,976.90
0.00
44,080.92 34,707.79 40,657.21 76,110.55 114,452.73 106,433.52 52,443.34
0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.89% 2.06% 2.41% 4.51% 13.10% 3.11% 100.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
74.81% 76.87% 79.28% 83.79% 96.89% 100.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
19.56% 265,928.28 15.77% 158,876.86 9.42% 100.00%
N DE PLAZO
OBSERV.
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000 341.95
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
0.0000000000
1,686,690.46
PROYECTO:
“MEJORAMIENTO DE VIVIENDA RURAL EN LOS CENTROS POBLADOS HUALCA Y KANAKATA - DISTRITO DE OCORURO; CENTROS POBLADOS AJOYANI CENTRA, CHAQUEYLLA Y OTROS - DISTRITO DE PALLPATA - PROVINCIA DE ESPINAR - DEPARTAMENTO DE CUSCO”
01. OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD 0.00 0.00 29,176.65 29,176.65 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
01. 01. PLAN PARA LA VIGILANCIA, PREVENCION Y CONTROL DE COVID-19 5,395.00 5,395.00 100.00%
01. 01. 01. LIMPIEZA Y DESINFECCION DEL CENTRO DE TRABAJO glb 1.00 465.00 465.00 1.00 465.00 100.00%
01. 01. 03. LAVADO Y DESINFECCION DE MANOS glb 1.00 1,740.00 1,740.00 1.00 1,740.00 100.00%
01. 02. PROCEDIMIENTO OBLIGATORIO PARA INICIO DE LOS TRABAJOS 8,625.00 8,625.00 100.00%
01. 02. 01. PROCESO PARA INICIO DEL TRABAJO glb 1.00 8,625.00 8,625.00 1.00 8,625.00 100.00%
01. 03. TRABAJOS PRELIMINARES 0.00 473.32 473.32 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
01. 01. 01. CARTEL DE OBRA DE 4.00 X 2.50 und 1.00 473.32 473.32 1.00 473.32 100.00% 0.00 0.00 0.00 0.00 0.00 0.00
01. 04. TRAZO NIVELES Y REPLANTEO PRELIMINAR 0.00 0.00 0.00 3,800.71 0.00 3,800.71 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00%
01. 02. 01. TRAZOS, NIVELES (REPLANTEO PRELIMINAR) m2 2,621.18 1.45 3,800.71 2,621.18 3,800.71 100.00% 0.00 0.00 0.00 0.00 0.00 0.00
01. 05. SEGURIDAD Y SALUD 0.00 0.00 0.00 10,882.62 0.00 10,882.62 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00%
01. 03. 01. EQUIPO DE SEGURIDAD INDIVIDUAL glb 63.00 93.90 5,915.70 63.00 5,915.70 100.00% 0.00 0.00 0.00 0.00 0.00 0.00
01. 03. 02. EQUIPO DE SEGURIDAD COLECTIVA glb 63.00 26.62 1,677.06 63.00 1,677.06 100.00% 0.00 0.00 0.00 0.00 0.00 0.00
01. 03. 03. SEÑALIZACION TEMPORAL DE SEGURIDAD glb 63.00 7.22 454.86 63.00 454.86 100.00% 0.00 0.00 0.00 0.00 0.00 0.00
01. 03. 04. CAPACITACION EN SALUD Y SEGURIDAD glb 63.00 45.00 2,835.00 63.00 2,835.00 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00%
02. MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 39,590.79 0.00 39,590.79 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00%
02. 01. EXCAVACIONES 0.00 0.00 0.00 39,590.79 0.00 39,590.79 100.00% 0.00 0.00 0.00 0.00 0.00 0.00
02. 01. 01. CORTE Y EXPLANACIÒN DE TERRENO NORMAL MANUAL (APORTE) m3 1,310.59 22.79 29,868.35 1,310.59 29,868.35 100.00% 0.00 0.00 0.00 0.00 0.00 0.00
02. 01. 02. EXCAVACION DE ZANJA HASTA H=1.00m (APORTE) m3 426.61 22.79 9,722.44 426.61 9,722.44 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00%
03. OBRAS DE CONCRETO SIMPLE 0.00 0.00 0.00 89,168.33 0.00 49,786.82 55.83% 0.00 39,381.51 44.17% 0.00 0.00 0.00% 0.00 0.00 0.00%
03. 01. CIMIENTOS 0.00 0.00 0.00 46,072.65 0.00 36,858.12 80.00% 0.00 9,214.53 0.20 0.00 0.00 0.00 0.00
03. 01. 02. SUMINISTRO DE PIEDRA MEDIANA (APORTE) m3 142.20 32.50 4,621.50 113.76 3,697.20 80.00% 28.44 924.30 20.00% 0.00 0.00 0.00% 0.00 0.00 0.00%
03. 02. SOBRECIMIENTOS 0.00 0.00 0.00 43,095.68 12,928.70 30.00% 30,166.98 70.00% 0.00 0.00
03. 02. 01. SOBRECIMIENTOS MEZCLA CEMENTO-HORMIGON 1:8 + 30% PM m3 110.57 159.30 17,613.80 33.17 5,284.14 30.00% 12,329.66 70.00% 0.00 0.00
03. 02. 02. ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO h=0.35m m2 1,078.37 23.63 25,481.88 323.51 7,644.56 30.00% 17,837.32 70.00% 0.00% 0.00 0.00 0.00%
04. CONCRETO ARMADO 0.00 0.00 205,105.94 0.00 0.00 0.00% 0.00 106,149.8 51.75% 98,956.17 48.25% 0.00 0.00 0.00% 0.00 0.00
04. 01. COLUMNAS 0.00 0.00 111,544.97 0.00 0.00 0.00% 0.00 78,081.48 70.00% 33,463.49 30.00% 0.00 0.00 0.00 0.00
04. 01. 01. CONCRETO COLUMNAS f'c=175 kg/cm2 m3 80.68 318.52 25,698.19 0.00 0.00 0.00% 56.48 17,988.73 70.00% 24.20 7,709.46 30.00% 0.00 0.00
04. 01. 02. ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 902.95 31.53 28,470.01 0.00 0.00 0.00% 632.07 19,929.01 70.00% 270.89 8,541.00 30.00% 0.00
04. 01. 03. ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 COLUMNAS kg 11,521.44 4.98 57,376.77 0.00 0.00 0.00% 8,065.01 40,163.74 70.00% 3,456.43 17,213.03 30.00% 0.00
04. 02. VIGAS 0.00 0.00 93,560.97 0.00 0.00 0.00% 0.00 28,068.29 30.00% 65,492.68 70.00% 0.00 0.00 0.00%
04. 02. 01. CONCRETO VIGAS f'c=175 kg/cm2 m3 99.09 282.06 27,949.33 0.00 0.00 0.00% 29.73 8,384.80 30.00% 69.36 19,564.53 70.00% 0.00 0.00 0.00%
04. 02. 02. ENCOFRADO Y DESENCOFRADO EN VIGAS m2 1,030.26 36.46 37,563.28 0.00 0.00 0.00% 309.08 11,268.98 30.00% 721.18 26,294.30 70.00% 0.00 0.00 0.00%
04. 02. 03. ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 PARA VIGAS kg 5,632.20 4.98 28,048.36 0.00 0.00 0.00% 1,689.66 8,414.51 30.00% 3,942.54 19,633.85 70.00% 0.00 0.00 0.00%
05. TIJERALES Y RETICULADOS 0.00 0.00 0.00 87,956.06 0.00 0.00 0.00% 0.00 0.00 0.00% 52,773.64 60.00% 0.00 35,182.42 40.00% 0.00 0.00%
05. 01. TIJERAL DE MADERA DE 2"X4" und 252.00 223.89 56,420.28 0.00 0.00 0.00 0.00 0.00% 151.20 33,852.17 60.00% 100.80 22,568.11 40.00% 0.00 0.00 0.00%
05. 02. CORREAS DE MADERA 2"X2" p2 3,996.06 6.96 27,812.58 0.00 0.00 0.00 0.00 0.00% 2,397.64 16,687.55 60.00% 1,598.42 11,125.03 40.00% 0.00 0.00 0.00%
05. 03. FRISO DE MADERA DE 1 1/2" X 2 1/2" p2 482.28 7.72 3,723.20 0.00 0.00 0.00 0.00 0.00% 289.37 2,233.92 60.00% 192.91 1,489.28 40.00% 0.00 0.00 0.00%
06. COBERTURA DE PLANCHA CORRUGADA GALVANIZADA 0.00 0.00 0.00 116,755.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 58,377.84 50.00% 58,377.84 50.00%
06. 01. COBERTURA DE PLANCHA CORRUGADA GALVANIZADA m2 2,585.65 41.89 108,312.88 0.00 0.00 0.00 0.00 0.00% 1,292.83 54,156.44 50.00% 1,292.83 54,156.44 50.00%
06. 02. CUMBRERA CALAMINA 0.30 mm, 11 CANALES INCL PINTADO m 387.64 21.78 8,442.80 0.00 0.00 0.00 0.00 0.00% 193.82 4,221.40 50.00% 193.82 4,221.40 50.00%
07. CIELO RASOS 0.00 0.00 0.00 62,439.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 18,731.79 30.00% 43,707.51 70.00%
08. MUROS 0.00 0.00 0.00 314,657.09 0.00 0.00 0.00% 0.00 0.00 0.00% 188,794.3 60.00% 0.00 125,862.8 40.00%
PROYECTO:
“MEJORAMIENTO DE VIVIENDA RURAL EN LOS CENTROS POBLADOS HUALCA Y KANAKATA - DISTRITO DE OCORURO; CENTROS POBLADOS AJOYANI CENTRA, CHAQUEYLLA Y OTROS - DISTRITO DE PALLPATA - PROVINCIA DE ESPINAR - DEPARTAMENTO DE CUSCO”
08. 01. MURO DE LADRILLO TIPO PANDERETA MEDIDAS SEGUN PLANO m2 4,599.00 52.17 239,929.83 0.00 0.00 0.00 0.00 0.00% 2,759.40 143,957.90 60.00% 1,839.60 95,971.93 40.00%
08. 02. SUMINISTRO E INSTALACION DE POLIESTIRENO DE 1" DENSIDAD 10 m2 3,435.38 13.60 46,721.17 0.00 0.00 0.00 0.00 0.00% 2,061.23 28,032.70 60.00% 1,374.15 18,688.47 40.00%
08. 03. BRUÑAS DE MUROS DE LADRILLO m 17,952.62 1.56 28,006.09 0.00 0.00 0.00 0.00 0.00% 10,771.57 16,803.65 60.00% 7,181.05 11,202.44 40.00%
09. REVOQUES 0.00 0.00 1,139.81 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 1,139.81 100.00%
10. ENLUCIDO DE YESO 0.00 0.00 84,924.43 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 42,462.22 50.00% 42,462.22 50.00%
10. 01. ENLUCIDO DE YESO EN MURO DE LADRILLO m2 3,860.10 17.17 66,277.92 0.00 0.00 0.00 0.00 0.00% 1,930.05 33,138.96 50.00% 1,930.05 33,138.96 50.00%
10. 02. DERRAMES DE VANOS CON YESO E=1.5CM m 1,979.46 9.42 18,646.51 0.00 0.00 0.00 0.00 0.00% 989.73 9,323.26 50.00% 989.73 9,323.26 50.00%
11. PISOS 0.00 0.00 0.00 51,414.24 0.00 0.00 0.00% 0.00 0.00 0.00% 10,282.85 20.00% 0.00 41,131.39 80.00% 0.00 0.00%
11. 01. BASE DE TIERRA MATERIAL PROPIO COMPACTADO/NIVELADO E= 10 CM m2 1,253.70 4.73 5,930.00 0.00 0.00 0.00 0.00 0.00% 250.74 1,186.00 20.00% 1,002.96 4,744.00 80.00%
11. 02. ACERO DE TEMPERATURA m2 1,253.70 9.04 11,333.45 0.00 0.00 0.00 0.00 0.00% 250.74 2,266.69 20.00% 1,002.96 9,066.76 80.00%
11. 03. PISO DE CEMENTO PULIDO E:4" ACAB. CON OCRE INC. BRUÑADO m2 1,253.70 27.24 34,150.79 0.00 0.00 0.00 0.00 0.00% 250.74 6,830.16 20.00% 1,002.96 27,320.63 80.00% 0.00 0.00 0.00%
12. VEREDAS 0.00 0.00 6,608.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 6,608.51 100.00%
12. 01. NIVELACION, RELLENO Y APISONADO INTERIOR C/MAT PROPIO (APORTE) m2 151.20 4.73 715.18 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 151.20 715.18 100.00%
12. 03. ENCOFRADO Y DESENCOFRADO DE VEREDAS 0.00 44.13 22.98 1,014.11 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 44.13 1,014.11 100.00%
13. ZOCALOS Y CONTRAZOCALOS 0.00 0.00 27,092.15 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 11,753.13 43.38% 0.00 15,339.02 56.62%
13. 02. CONTRAZOCALO DE MADERA CON RODON, DE 5.80 CM X 1.90 CM X 2.40 M m 1,065.96 8.41 8,964.72 0.00 0.00 0.00 0.00 0.00% 319.79 2,689.42 30.00% 746.17 6,275.30 70.00%
14. PUERTAS 0.00 0.00 106,705.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 21,341.12 20.00% 0.00 85,364.50 80.00%
14. 01. PUERTA MACHIHEMBRADA DE 0.90X2.10 M. INCLUYE. INSTALACION und 63.00 630.05 39,693.15 0.00 0.00 0.00 0.00 0.00% 12.60 7,938.63 20.00% 50.40 31,754.52 80.00%
14. 02. PUERTA CONTRAPLACADA DE 0.90X2.10 M. INCLUYE. INSTALACION und 63.00 441.23 27,797.49 0.00 0.00 0.00 0.00 0.00% 12.60 5,559.50 20.00% 50.40 22,237.99 80.00%
14. 03. PUERTA CONTRAPLACADA DE 0.80X2.10 M. INCLUYE. INSTALACION und 126.00 311.23 39,214.98 0.00 0.00 0.00 0.00 0.00% 25.20 7,843.00 20.00% 100.80 31,371.98 80.00%
15. VENTANAS 0.00 0.00 84,569.31 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 16,913.86 20.00% 0.00 67,655.45 80.00%
PROYECTO:
“MEJORAMIENTO DE VIVIENDA RURAL EN LOS CENTROS POBLADOS HUALCA Y KANAKATA - DISTRITO DE OCORURO; CENTROS POBLADOS AJOYANI CENTRA, CHAQUEYLLA Y OTROS - DISTRITO DE PALLPATA - PROVINCIA DE ESPINAR - DEPARTAMENTO DE CUSCO”
15. 02. VENTANA CENITAL und 63.00 296.78 18,697.14 0.00 0.00 0.00 0.00 0.00% 12.60 3,739.43 20.00% 50.40 14,957.71 80.00%
16. INSTALACIONES ELECTRICAS 0.00 0.00 22,630.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 22,630.23 100.00%
16. 01. INSTALACION ELECTRICA EN MÓDULO glb 63.00 359.21 22,630.23 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 63.00 22,630.23 100.00%
17. EVACUACION AGUAS PLUVIALES 0.00 0.00 37,927.37 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 37,927.37 100.00%
17. 01. SISTEMA DE EVACUACION DE AGUAS PLUVIALES und 126.00 287.60 36,237.60 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 126.00 36,237.60 100.00%
17. 02. ENCOFRADO Y DESENCOFRADO DE DADOS DE CONCRETO. m2 44.10 24.67 1,087.95 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 44.10 1,087.95 100.00%
17. 03. CONCRETO SIMPLE f'c=100 kg/cm2 PARA DADOS DE PROTECCION m3 2.76 218.05 601.82 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 2.76 601.82 100.00%
18. MITIGACION Y LIMPIEZA 0.00 0.00 8,617.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8,617.14 100.00%
18. 01. MITIGACION DEL IMPACTO AMBIENTAL (APORTE) glb 63.00 136.78 8,617.14 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 63.00 8,617.14 100.00%
19. ACARREOS 0.00 0.00 17,234.91 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17,234.91 100.00%
19. 01. ACARREO DE MATERIAL EXCEDENTE Y LIMPIEZA DE OBRA FINAL (APORTE) glb 63.00 273.57 17,234.91 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 0.00% 63.00 17,234.91 100.00%
20. FLETES 0.00 0.00 0.00 292,976.90 0.00 216,035.52 73.74% 0.00 76,941.39 26.26% 0.00 0.00 0.00%
20. 01. FLETE Y TRANSPORTE DE MATERIALES 0.00 0.00 139,094.13 0.00 139,094.13 100.00% 0.00 0.00 0.00% 0.00 0.00 0.00%
20. 02. FLETE Y TRANSPORTE DE PIEDRA Y AGREGADOS glb 0.00 0.00 153,882.77 0.00 76,941.39 50.00% 0.00 76,941.39 50.00% 0.00 0.00
1,686,690.5 334,589.78 19.84% 222,472.66 13.19% 350,806.9 20.80% 371,756.6 22.04% 407,064.5 24.13%
CONTROL "S" DE TIEMPO - AVANCE FISICO - FINANCIERO - SEGUN PRESUPUESTO EXPEDIENTE TECNICO
NE 12
2 DEL 15 DE MARZO AL 31 DE 43,856.70 2.00% 2.00% 64,151.41 2.93% 2.93% 0.00 0.00% 0.00%
MARZO
3 DEL 01 DE ABRIL AL 30 DE 553,426.55 25.28% 27.28% 0.00 0.00% 0.00% 0.00 0.00% 0.00%
ABRIL
4 01 DE MAYO AL 31 DE MAYO 461,262.30 21.07% 48.35% 0.00 0.00% 0.00% 0.00 0.00% 0.00%
5 01 DE JUNIO AL 30 DE JUNIO 399,089.60 18.23% 66.59% 0.00 0.00% 0.00% 0.00 0.00% 0.00%
6 01 DE JULIO AL 31 DE JULIO 494,544.68 22.59% 89.18% 0.00 0.00% 0.00% 0.00 0.00% 0.00%
01 DE AGOSTO AL 13 DE
7 AGOSTO 236,935.17 10.82% 100.00% 0.00 0.00% 0.00% 0.00 0.00% 0.00%
110%
100% 100.00%
% de Avances Acumulados
90% 89.18%
80%
70%
66.59%
60%
50% 48.35%
40%
30%
27.28%
20%
10%
2.93% 2.00%
0% 0.00% 0.00% 0.00%
INICIO DEL 15 DE DEL 01 DE 01 DE MAYO AL 01 DE JUNIO AL 01 DE JULIO AL
MARZO AL 31 ABRIL AL 30 DE 31 DE MAYO 30 DE JUNIO 31 DE JULIO
DE MARZO ABRIL
Meses Valorizados
2.93% 2.00%
0% 0.00% 0.00% 0.00%
INICIO DEL 15 DE DEL 01 DE 01 DE MAYO AL 01 DE JUNIO AL 01 DE JULIO AL
MARZO AL 31 ABRIL AL 30 DE 31 DE MAYO 30 DE JUNIO 31 DE JULIO
DE MARZO ABRIL
Meses Valorizados
_____________________ _____________________
Asistente Administrativo Residente de Obra