BREWHOUSE
b. No. of tanks 30
NEW BREWERY
CAPACITY CALCULATION
b. No. of tanks 8
b. No. of tanks 18
NEW BREWERY
CAPACITY CALCULATION
2. Second set 1,000 8 1,340 3 1.314 90% 4,752 1.43 6,789 54,314 597,452
3. Third set 3,600 18 1,340 2 1.314 90% 3,168 1.43 4,526 81,471 896,178
FILTRATION
c. No. of tanks 4
NEW BREWERY
CAPACITY CALCULATION
c. No. of tanks 6
c. No. of tanks 6
NEW BREWERY
TABULATED SUMMARY - BRIGHT BEER TANKS
Gross Tank No. Hl PackagedHl PackagedHl Packaged Hl Packaged
Bright Beer Tanks Capacity Utilization of Beer Beer Beer Beer
(hl) Tanks per Day per Week per Month per Year
1. First set 3,750 90% 4 13,500 74,250 319,275 3,512,025
PACKAGING
NEW BREWERY
CAPACITY CALCULATION
PACKAGING
2. CANNING LINE
PACKAGING
NEW BREWERY
CAPACITY CALCULATION
PACKAGING
PACKAGING
2. Canning Line 0.330 30,000 cans 85% 16 5.5 4.3 84 1,346 7,405 31,842 350,266
3. Keg Racking Line 50 60 kegs 90% 16 5.5 4.3 27 432 2,376 10,217 112,385
4. Liter Line 4 1.000 30,000 bot. 85% 16 5.5 4.3 255 4,080 22,440 96,492 1,061,412
5. Multi-Product Line 5 0.330 30,000 bot. 80% 16 5.5 4.3 79 1,267 6,970 29,969 329,662
REFRIGERATION PLANT
STEAM PLANT
SUMMARY OF CAPACITIES
Capacity
AREAS (Hl packaged
beer per year)
a. Brewhouse 3,296,938
b. Fermenters 5,601,111
c. Filtration 3,013,992
e. Packaging 2,205,364
f. Refrigeration 4,613,253
Assumptions:
SUBSTATION
n. No. of Units 3
p. Primary voltage, kV 69