Ensure that only authorized / certified operator will operate the equipment
Serious
physical
Hit by moving equipment 3 5 A Inspect the equipment prior to start the work 1 5 D
injury /
Fatality
Barricade and signage should be put in place to warn the public
Minor Barricade and signage should be put in place to warn the public
Personal injury (Eye, head, foot, body) physical 2 3 C 1 3 D
injury Safety briefing and vigilant monitoring
Wear proper personal protective equipment such as, hand gloves, long sleeve,
safety shoes, hard hat including safety goggles
Barricade and signage should be put in place to warn the public
Minor
Slip / Tripping hazard physical 2 3 C Maintain good housekeeping on working area 1 3 D
injury
Proper segregation of materials on working area
Provide appropriate resting shelter and drinking station intended to the workers
Serious involved with the tasks
physical
Heat stroke / Heat stress 2 3 C Standby first aider on working area for possible emergency 1 3 D
injury /
Fatality
Safety awareness regarding heat stroke / heat stress should be discuss prior to
start the work
F. Surveying works Barricade and signage should be put in place to warn the public
Install all the safety / warning devices prior to start the work
Ensure all safety devices are install on the concrete mixer; must be inspect prior to
Serious work
physical
Hit by moving concrete mixer 3 5 B Assign spotter / flagman to assist the operator in maneuvering of the equipment 1 5 D
injury /
Fatality
Ensure that only authorized / certified operator will operate the concrete mixer
Use lifeline to hold the nozzle of the pump Crete to avoid unnecessary movement or
accident
Minor
Wear proper personal protective equipment such as, hand gloves, long sleeve,
Hit by the nozzle of Pump Crete physical 2 3 C 1 3 D
safety shoes, hard hat including safety goggles
injury
Ensure only authorized / certified operator to operate the pump Crete.
Standby fire extinguishers and fire watchers during concrete pouring works in
Property anticipation of engine fire breakdown due to overheating
Fire hazard 2 3 C 1 3 D
damage Ensure all machines are in good condition and properly inspected prior to use at the
work place
Remove all unnecessary / scattered materials stowed on the ground working place
Wear proper personal protective equipment such as, hand gloves, long sleeve,
safety shoes, hard hat including safety goggles
Minor Wear ear defender such as, ear plug or ear muffs
Noise hazard physical 2 3 C 1 3 D
injury Unauthorized personnel should not allow to work on working area
Minor In case of bad weather condition / heavy rains, work should be stop immediately.
Bad weather condition physical 2 3 C 1 3 D
injury Always update / monitor the weather condition
Remove all unnecessary / scattered materials stowed on the ground working place
Provide planks or any hard plate for the access when installing rebar’s
Minor In case of bad weather condition / heavy rains, work should be stop immediately
Bad weather condition physical 2 2 D 1 2 E
injury Always update / monitor the weather condition
Minor In case of bad weather condition / heavy rains, work should be stop immediately
Bad weather condition physical 2 3 C 1 3 D
injury Always update / monitor the weather condition
Inspect all power tools and cables prior to start the work
Minor Safety briefing regarding work safely before commencing the job
G. Anchor Bolt physical
Setting Inhalation of welding Fumes 2 3 C Unauthorized personnel should not allow to work on working area 1 3 D
injury
Use dust mask / respirator during carpentry works
Ensure the area is free from any obstruction prior to start the work
Minor In case of bad weather condition / heavy rains, work should be stop immediately
Bad weather condition physical 2 3 C 1 3 D
injury Always update / monitor the weather condition
Ensure all safety devices are install on the concrete mixer; must be inspect prior to
Serious work
physical
Hit by moving concrete mixer 3 5 B Assign spotter / flagman to assist the operator in maneuvering of the equipment 1 5 D
injury /
Fatality
Ensure that only authorized / certified operator will operate the concrete mixer
Use lifeline to hold the nozzle of the pump Crete to avoid unnecessary movement or
accident
Minor
Wear proper personal protective equipment such as, hand gloves, long sleeve, safety
Hit by the nozzle of Pump Crete physical 2 3 C 1 3 D
shoes, hard hat including safety goggles
injury
Ensure only authorized / certified operator to operate the pump Crete.
Standby fire extinguishers and fire watchers during concrete pouring works in
Property anticipation of engine fire breakdown due to overheating
Fire hazard 2 3 C 1 3 D
damage Ensure all machines are in good condition and properly inspected prior to use at the
work place
Minor
Slip / tripping hazard 2 2 D Remove all unnecessary / scattered materials stowed on the ground working place 1 2 E
physical
Maintain good housekeeping at the work site area
injury Barricade and signage should be put in place to warn the public
Wear proper personal protective equipment such as, hand gloves, long sleeve, safety
shoes, hard hat including safety goggles
Minor Wear ear defender such as, ear plug or ear muffs
Noise hazard physical 2 3 C 1 3 D
injury Unauthorized personnel should not allow to work on working area
Minor In case of bad weather condition / heavy rains, work should be stop immediately.
Bad weather condition physical 2 3 C 1 3 D
injury Always update / monitor the weather condition
Install all safety / warning to prohibited unauthorized entry into the stripping area
Serious
physical Barricade and signage should be put in place to warn the public
Hit by the materials 3 5 B 1 5 D
injury / Conduct training / safety briefing to all the workers involved in this particular activity
fatality prior to start the work
Unauthorized person should not allow to work on working area
Minor
Horse play 2 3 C Safety briefing to all personnel prior to start the work 1 3 D
physical
injury Assign personnel to continuous monitoring on working area
Minor In case of bad weather condition / heavy rains, work should be stop immediately
Bad weather condition physical 2 3 C 1 3 D
injury Always update / monitor the weather condition
Horse playing at work should not be permitted nor tolerated and therefore strictly
Minor
prohibited
J. Grouting Horse play physical 2 3 C 1 3 D
injury Assign personnel to continuous monitoring on working area
Ensure all manpower should follow the proper manual handling procedure for the
Minor erection of steel structure
Got hit by the tools and materials physical 2 3 C 1 3 D
injury Barricade and signage should be put in place to warn the public
Wear proper personal protective equipment such as, hand gloves, long sleeve, safety
shoes, hard hat including safety goggles
Proper orientation / training to the involve personnel prior to start the work
Ensure the area is barricaded and install signage to warn the public
K. Steel Structure Wear proper personal protective equipment such as, hand gloves, long sleeve, safety
Erection ( Column shoes, hard hat including safety goggles
Erection, Girder
Install all safety / warning devices on the equipment
Erection)
Barricade and signage should be put in place to warn the public
Serious
physical Conduct training / safety briefing to all the workers involved in this particular activity
Hit by moving equipment 3 5 B prior to start the work 1 5 D
injury /
fatality
Assign spotter / flagman in maneuvering and in operation of the equipment
Use tagline to control the movement of the materials being lift and to avoid accident
Serious Use of radio Communication for proper interaction of operator and rigger
physical
Hit / struck by the materials that being lift 3 5 B Unauthorized person should not allow to work on working area 1 5 D
injury /
fatality
Only authorized / certified operator should operate the equipment
Wear proper personal protective equipment such as; hand gloves, long sleeve, safety
shoes, hard hat including safety goggles
Inspect the equipment prior to start the lifting works
Property
Collapse of equipment 3 5 B Only authorized / certified operator should operate the equipment 1 5 D
damage
Place the equipment on the firm and stable ground prior to start the work
Proper planning should be initiated prior to start the work
Inspect the hand tools prior to start the work in erection of steel structure
Minor
Hit / struck by hand tools physical 2 3 C Follow the proper procedure on manual handling of hand tools 1 3 D
injury
Wear proper personal protective equipment such as, hand gloves, long sleeve, safety
shoes, hard hat including safety goggles
Bad weather condition Minor 2 2 D In-case of bad weather condition / heavy rains, work should be stop immediately 1 2 E
physical
Always update / monitor the weather condition
injury
Use / wear appropriate eye protection in painting works such as, safety goggles /
rubber goggles
Minor
Eye injury physical 2 3 C 1 3 D
Unauthorized personnel should not allow to work on working area
injury
Provide eye wash station for possible eye injury
Use / wear appropriate personal protective equipment on painting works such as;
Minor
rubber/chemical gloves, long sleeve, safety shoes, hard hat including safety goggles
Skin irritation physical 2 3 C 1 3 D
injury Unauthorized personnel should not allow to work on working area
Use proper platform in high risk work
Minor Use body harness in working at height
Fall Hazard physical 2 3 C 1 3 D
injury Follow the proper use of ladder (ladder safety)
Incase if the wall and ceiling is not too high use stick on the paint roller in painting the
wall and ceiling
Horse playing at work should not be permitted nor tolerated and therefore strictly
Minor
prohibited
Horse play physical 2 3 C 1 3 D
injury Assign personnel to continuous monitoring on working area
Only certified Installer should be install the roof for the building
Property
damage / Inspect all lifting gears prior to start the work
Serious
Fall Hazard 2 3 C Proper planning should be initiated prior to start the work 1 3 D
physical
injury /
fatality Inspect the equipment prior to start the lifting works
Minor Wear proper personal protective equipment such as; hand gloves, long sleeve, safety
Personal injury (Eye, head, foot, body) physical 2 3 C shoes, hard hat including safety goggles 1 3 D
injury Unauthorized personnel should not allow to work on working area
Minor Safety briefing to all personnel prior to start the work
Horse play physical 2 3 C 1 3 D
injury Assign personnel to continuous monitoring on working area
Minor In case of bad weather condition / heavy rains, work should be stop immediately
Bad weather condition physical 2 3 C 1 3 D
injury Always update / monitor the weather condition
Inspect the condition of the cables and machines prior to start the work
bitten by bee, insect, snake and other Serious Safety briefing should be initiated prior to start the work regarding the safe work on D
2 3 C 1 3
venomous animals physical the working area during night / overtime works
Advice all personnel working at overtime / night works to rest only on the designated
resting shelter
injury /
Inspect the working area for possible beehive to avoid insects bites
Fatality
Wear proper personal protective equipment such as, hand gloves, long sleeve,
safety shoes, hard hat including safety goggles
Remove all unnecessary / scattered materials stowed on the ground working place
Wear proper personal protective equipment such as, hand gloves, long sleeve,
safety shoes, hard hat including safety goggles
Wear appropriate personal protective equipment during removal and disposal of
waste materials.
Minor
O. Housekeeping and physical Disposal of material should be coordinated to the concerned department.
disposal of waste Improper disposal of waste materials injury / 2 3 C 1 3 D
Proper segregation of waste materials should be initiated and these will be disposed
materials Environme
into a designated landfill area authorized by the client.
ntal hazard
Schedule of waste disposal will be Monday, Wednesday and Friday
Likely
4 8 12 16 20
4
Probable
3 6 9 12 15
3
Occasional
2 4 6 8 10
2
Unlikely
1 2 3 4 5
1
Likelihood
Very Low Low Moderate High Very High
1 2 3 4 5
Consequence
16 - 25 Unacceptable / Intolerable A
10 - 15 Substantial B
3-5 Tolerable D
1-2 Acceptable E