T21021-CD-000-HSE-PLN-001
HSE PLAN
TABLE OF CONTENT
1. PROJECT OVERVIEW
1.1. TITLE
HEALTH, SAFETY AND ENVIRONMENTAL PLAN
2.1. Introductions
This plan addresses the Contractor’s project teams to successfully manage
HSE throughout the project’s life cycle to achieve the goal of zero Fatality
and zero Lost Time Injury (LTI) during the execution of the project. In the
event of conflicts between Project HSE Plan, Contractor standards, and
applicable government rules & regulations, further discussion shall be
conducted with Owner (government rules and regulations over rules the
other requirements).
Boundaries of EHS implementation covers construction of facilities for nickel
mining and supporting activities located near Bahodopi, including the
following Departments:
The purpose of Project HSE Plan is a specific plan to ensure all job activities
in this project has complied with Owner standards, Contractor standards,
and applicable to government rules and regulations in order to get the best
quality for Health, Safety, and Environmental to prevent the adverse
(human, property, and environment) incident. In addition, Project HSE Plan
described the detail of HSE schedule (based on project requirements) to
support all of project activities.
The scope Mine of Bahodopi Blocks 2-3 (MBB 2-3) are:
• Quarry Development
• Utilities
2.4. Reference
Contractor shall implement HSE Management System refer to Government
Regulations, National & International Standard, Rules, and others
Regulation, such as but not limited:
1. Law No. 1/1970 regarding Occupational HSE (Consists of Health and
Safety)
2. Law No. 23/1992 regarding Occupational Health
3. Regulation of Indonesian Government No 22 / 2021 Implementation of
Environmental Protection and Management
4. Law No. 24/2011 regarding Social Security Organizing Body
5. Regulation of Indonesian Government No. 50 / 2012 regarding
Implementation of Occupational Health and Safety Management
System Law No. 1/1970 regarding Occupational Health
6. Regulation of Indonesian Government No. 101 / 2014 regarding
Hazardous Waste Management
7. Minister of Labour and Transmigration No. PER/01/MEN/1980
regarding Work Safety at Construction
8. Regulation of Indonesian Government No. 81 / 2012 regarding
Management of Household Waste and Similar to Household Waste.
Doc. No. T21021-CD-000-HSE-PLN-001
1. Prequalification Phase
The subcontractor shall fulfill the HSE completeness according to the HSE
questionnaire that we provided, after the Subcontractor fulfills the
completeness of the HSE file we evaluate the assessment file based on the
job category according to the work offered to the subcontractor, then our
team will make a visit to the vendor's work area to assess the HSE
implementation category in the field, after the subcontractor is declared to
have passed the evaluation, the subcontractor will get a certificate of
passing the HSE prequalification evaluation.
2. Technical Phase
When the subcontractor has received a HSE Prequalification Certificate that
has passed the evaluation in the prequalification phase and is included in
our subcontractor list, the subcontractor shall follow the technical process,
the subcontractor will asked to complete the ITB HSE requirements
document and then we will evaluate the fulfillment of the work according to
the scope of work offered.
3. Readiness Phase
PJSM evaluation (Pre Job safety meeting) will be carried out to
subcontractors after the technical phase to ensure the readiness of the HSE
aspect of the subcontractor, work permits in the work area will only be
released to subcontractors who have completed and passed the PJSM.
Each subcontractor involved has obtained approval from the PTVI Project
Manager.
The contractor ensures that the subcontractor implements the HSSEC
program in the execution of its work.
Any violation of the subcontractor will be the responsibility of the main
contractors.
MEASUREMENT /
NO ITEM KPI TARGET REMARKS
RECORD
Project Induction to
Contractor Employees,
4 Weekly 100% No Exception
Vendors, Sub-
Contractors and Visitors.
Adherence to CAR
5 Monthly 100% No Exception
requirements
MEASUREMENT /
NO ITEM KPI TARGET REMARKS
RECORD
SubContractors and
Vendors.
Environmental Incident
report raised and
11 contained within 24 Weekly 100% No Exception
hours, closed out within
three (3) days.
Management System –
14 Weekly 100% No Exception
Compliance
MEASUREMENT /
NO ITEM KPI TARGET REMARKS
RECORD
Supervisor to
attend Manager
Safety Talk Weekly 100%
1x/month
Director 2x/year
Supervisor and
Manager to
HSER Meeting Monthly 100%
attend Director
2x/year
Director to
HSER Contractor Forum Monthly 100%
attend
Inspection, Behavior
16
Dialog (SOI) & JCC
Supervisor to
attend Manager
K3L Weekly 100%
1x/month
Director 2x/year
MEASUREMENT /
NO ITEM KPI TARGET REMARKS
RECORD
7x/month
Director 4x/year
No Exception,
all finding shall
Routine/Preventive
As per SOP 100% be closed within
inspection
as per agreed
schedule
Supervisor to
attend Manager
House keeping Daily 100% 1x/month
Director 4x/year
for inspection
Occupational Medical
17 Monthly 0.44%
Absenteeism
Adherence to weekly
18 Weekly 100%
meetings
Adherence to CAR
19 Weekly 100%
routine inspections
No Exception,
EPC to provide
Adherence to training Training need
20 Monthly 100%
Compliance analysis
required to all
resources
The progress of KPI and program will be review regularly. Contractor will submit, on a
weekly basis, a formal report summarizing Contractor and Subcontractors HSE
performance to the Company representative. The report will be including total man-hours,
Doc. No. T21021-CD-000-HSE-PLN-001
leading, and lagging indicator as stated on HSE Objectives, Target, Programs, and any
related additional data.
The EPC Contractor will prepare and designate a candidate for PJO after receiving
the contract. The process of presentation and validation of the PJO must be
conducted before the mobilization.
Doc. No. T21021-CD-000-HSE-PLN-001
6.3.10 Subcontractor/Supplier/Vendor
6.3.11 Workers
Their responsibilities include, but not limit to:
• Workers shall report to work in a fit and proper condition to perform their
job in a safe and competent manner.
• Workers shall observe and follow all established site HSE rules and
Contractor Safety Program. They shall adhere to all work directives and
procedures for the tasks assigned (whether provided orally or in writing).
• Workers have ‘STOP Work Authority’ when they observe unsafe
situation.
• Always uses personal protective equipment (PPE) in good working
condition where it is required.
• Workers shall use any tools and equipment without modification.
Others Task-specific training which are mandatory as per job position shall be
completed within 1 month after that person got the ID badge. Contractor &
Subcontractor Site Manager shall be responsible to arrange their employee to
comply with this requirement.
Every site worker must be given a suitable site induction. The induction
should be site specific and highlight any particular risks and control
measures that those working on the project need to know about. The
following issues should be considered:
• First-aid arrangements;
• Emergency call and route
• Accident and incident reporting arrangements;
• Arrangements for briefing workers on an ongoing basis, e.g. toolbox
talks;
• Arrangements for consulting the workforce on health and safety
matters;
• Individual worker's responsibility for health and safety.
Site inductions should also be provided to those who do not regularly
work on the site, but who visit it on an occasional or once-only basis
(e.g. students). The inductions should be proportionate to the nature of
the visit. Inductions provided to escorted visitors need not have the
detail that unescorted visitors should have. Escorted visitors only need
to be made aware of the main hazards they may be exposed to and the
control measures.
8 HSER COMMUNICATION
8.1 HSE Co-Ordination Meetings
The contractor will conduct periodic HSE coordination to ensure the
implementation of the HSE program and action plan goes according to plan.
According to the PNR-000067 Health, Safety and Environment Management
Procedure for Vale Contractors.
The contractor will establishes different regular safety meetings both internally
and with the PTVI - IGP project parties with minimum references for safety
meeting activities as below for each type of safety meeting and level of position
of the supervisory function.
Doc. No. T21021-CD-000-HSE-PLN-001
8.2 KICK OFF MEETING AND PRE JOB ACTIVITY (PRE- MOBILIZATION)
Contractor ensure that through pre-mobilization briefings and adequate on-
the-job supervision. Project manager and HSE manager will ensure for
scheduling this meeting.
Instruction and guidance are provided to ensure that they are: Fully conversant
with the working conditions at the work site, the hazards and risks associated
with the work and roles and standards relating to the environment, including
the handling of waste and hazardous material (If available).
Fully understand our emergency response plan and conduct bridging
document to overcome the gap that may exist in two different documents.
Fully aware that they are expected to bring to the immediate notice of their
Supervisor all health, safety and environmental risks which they believe to not
be under adequate control, so that action may be taken to prevent potential
injuries or other losses.
TBM could be done per group to make it effective and efficient. For example,
TBM for civil group, TBM for mechanical group, etc.
Talk will be divided into several big group at several workplaces or every week
General Safety will be scheduled to attended by different Sub-contractors.
HSE Information Boards will be used to display HSE Policy, slogans and other
information as statistics, awards, etc.
10. DOCUMENTATION
To controlling and monitoring safety man hours, man power, etc, Contractor will
submit, on a weekly and monthly basis, a formal report in a format to summarizing
Contractor and Subcontractor’s HSE Performance to Company. HSE reporting
system are consist of, but not limited to:
a. HSE Weekly Report
Doc. No. T21021-CD-000-HSE-PLN-001
Upon the vehicle‟s demobilization from the project, the appropriate Vehicle
Pass shall be returned to security gate personnel.
Prior to the visitor arriving on site the host is responsible for advising the
visitor of the minimum PPE requirements for entering the areas of site
relevant to their visit.
All Contractor(s) employees shall ensure all its personnel attend an
approved safety induction course (GIP – General Induction Program, SIP –
Security Induction Program, SSIP – Site Specific Induction Program –
Project site).
- Examination health for worker that carrying out high risk activity.
Drug and Alcohol test will be carried out randomly. However, employee at
high risk activities will be the priority to participate in the test.
This program is designed to minimize the potential of someone conducting
work under the influence of drugs and/or alcohol and ensures employees
and Contractor are aware of the dangers of conducting such work. It
established this by conducting random, suspicious, and post-incident
testing, as well as educational requirements
11.3 NIGHT WORKS
Contractor shall ensure that the lighting provided is adequate for the work
and personnel guideline
Contractor shall ensure that bulbs in light fixtures are protected from
breakage (as designed by the manufacturer or as required by regulating
agencies). Lighting fixtures shall be positioned to prevent
Doc. No. T21021-CD-000-HSE-PLN-001
employees from coming into / contact with the fixtures during work
operations. Lighting supply cords and cables shall be installed and
maintained in a manner consistent with good electrical wiring
practices and not in paths or roads where they can be damaged.
Contractor shall ensure that all points of exit, pathways and muster points
are clearly illuminated and marked. Ladder access and egress areas shall
be clearly illuminated.
Contractor shall ensure that area lighting is located to avoid glare and
spaced to provide adequate illumination for the areas covered.
Contractor shall ensure that temporary lighting strings consist of non-
conductive lamp sockets and connections are permanently molded to the
conductor insulation. Bulbs attached to extension cords
and lighting strings shall be protected by lamp guards.
Contractor shall ensure no one is allowed to work alone in the night.
Night works are only allowed to be performed by written approval from
PTVI/IGP and which will be based on the Contractor risk assessment to
activities being performed.
HSE requirement is recommended prior start of work during night activities.
As with other health and safety hazards, the greater exposure to shift work
and extended hours, the more likely the risk of some harm. The risk of
working with shifts and the amount of night work can undermine long term
shifts and long hours of work and safety, those who work them. For that
there are several mitigations that need to be considered among others but
not limited to:
a. Plan an appropriate and varied workload.
b. Offer a choice of permanent or rotating shifts and try to avoid
permanent night shifts.
c. Limit shifts to 12 hour including overtime.
d. Encourage workers to take regular breaks and allow some
choice as to when they are taken.
e. Consider the needs of vulnerable workers, such as young or
aging workers.
Doc. No. T21021-CD-000-HSE-PLN-001
• Keep all necessary documents on the work front, such as: ART, PTS
and equipment checklist, evidence of training (badge/passport, etc.)
and others relevant to this type of activity.
• Install a containment basin next to the drilling equipment powered by
a diesel engine, whose components are used with lubricating oils and
greases, subject to leakage during its operation, to mitigate a
possible impact.
Before entering the confined space (sewer, drain, manhole, vessel, tank,
or other enclosed area with restricted entry and exit), workers must be
trained and have an Entry into Confined Space Permit.
Contractor shall identify the position(s) or person(s) responsible to
coordinate entry operations and permitting for the site(s). These people
and their responsibilities shall be shown on the Confined Space list. As a
minimum confined space activity should have these following position (s)
or role (s):
• Authorized entrants.
• Standby Man/Person.
• Authorize Gas Tester.
• Entry Supervisor.
Standby Man/Person responsibilities are:
• To monitor entrants during the job and during entry & exit to ensure
their safety.
• The standby person may not abandon his post for any reason while
personnel are in the space. In case he/she need to leave, he/she
MUST contact their supervisor/foreman to be replaced by another
trained standby person.
• Sign the entry log when entering or exiting the confined space.
• Will evacuate the space when any of the following conditions occur:
• An order to evacuate is given by the standby person
• Entrant recognizes a warning indication of hazard exposure
• The evacuation alarm is sounded
• To assure that the space has been adequately ventilated, isolated,
emptied, or otherwise made safe for entry.
• To immediately exit a space, without question, upon word of the
standby person, no matter what the reason.
• To follow all HSE rules and procedures that applies to the job.
All workers involved in confined space entry must be adequately trained to
acquire the understanding, knowledge, and skills necessary for the safe
performance of the duties and to ensure that safe work procedures are
followed.
Contractor shall identify the training required to comply with this procedure
and provide training to ensure employees have the necessary
understanding, knowledge, and skills to safely perform Confined Space
duties.
This training as a minimum shall:
LEL: <1% AND Toxic vapors ≤ LEL: >1% but <10% AND/OR
3 50% Toxic
of PEL vapors > 50% of PEL
6. Continuous ventilation.
7. PPE & Tools.
8. Rescue Plan (for high risk confined space activity based on Risk
Assessment).
9. Permit to Work.
A competent Rescue Team shall be available and on alert for high risk
confined space entries (based on Risk Assessment). Rescue Team
members should have ready access to Breathing Apparatus sets or
airlines, harnesses, line rescue and any other equipment necessary for
safely retrieving injured or collapsed personnel from the confined space.
The Rescue Team response time must be considered during the Risk
Assessment and Planning stages of the job preparation.
Specific Confined Space procedure with project site condition shall be
provided to ensure all Confined Space activities can be carried out safely.
• The storage area must be at least 50 feet from any ignition source (e.g.
open fire, workshop area where grinding tools, or flame cutting
equipment is used).
• Storage indoors - ideally, storage of flammable and combustible liquids
should be in a separate isolated building. If this is not possible, they
should be stored in a special room with fire resistant walls, doors,
ceilings, and floors.
• The storage indoor should be protected with an automatic fire-
protection system (sprinklers, foam, and carbon dioxide). The room
should be well ventilated, be equipped with explosion proof lighting
and electrical fixtures and have a warning sign at the entrance
indicating that no smoking or naked lights are permitted.
Any storage area, whether in the open or indoors, should have a portable
fire extinguisher (approved for Class B fires) available outside the
entrance. This extinguisher may be of the foam type, carbon dioxide type,
dry chemical type. Personnel must be trained in the use of the
extinguisher.
During flammable liquids are transferred from one container to another,
there is a possibility of static electricity build-up which is a dangerous
ignition source. To prevent build-up of static electricity, following
requirements are required during handling of flammable liquids:
NO EQUIPMENT CERTIFICATION
NO EQUIPMENT CERTIFICATION
• Guards and safe protection of the devices must remain in place and
in operable condition on all tools. Wooden handles on tools must be
free of cracks or other defects. Tape or other coverings that will hide
defects are not to be placed on these handles.
• The colour code must be posted on the device to determine the
condition of the equipment (Good or Not Good).
• Damaged or defects tools should not be used and removed from
site. Re-inspection should be done for these tools after repair.
• Daily checks shall be done by tools user to ensure that tools are in
good condition and safe.
• Always use appropriate tools for every job. Do not use improvised
or modified tools.
• Non-spark, explosion proof or intrinsically safe tools are mandatory
to be used at several hazardous or flammable area.
• Impact surfaces of tools including, but not limited to, hammers,
wrenches, drift pins, chisels must be kept free of mushroomed
heads.
Doc. No. T21021-CD-000-HSE-PLN-001
Eye and face protection All eye and face protection shall meet the requirements
set out
in EN 166, ANSI Z87.1 – 2003
Hearing protection All hearing protection shall meet the requirements set
out in ANSI S3.19 – 1974, all type of hearing protective
shall be used
Doc. No. T21021-CD-000-HSE-PLN-001
Hand protection All hand protection shall meet the requirements set out
in BS
EN 420:2003 + A1 2009 and Super Duty gloves for
specific activity
Foot protection All foot protection shall meet the requirements set out
in BS EN
345, 1993 ANSI Z.41
Fall protection All fall protection shall meet the requirements refer to
ANSI
A10.14
• Before assembling the system, check all hoses for cuts, breaks,
and loose
• connections.
• Blow out all hoses before hooking up the equipment. If the
connector has a rubber seal. Remove it before (and replace it
after) blowing.
• When possible, run air lines through areas with little traffic. If
possible, avoid laying lines across roads. Protect air lines or
hoses against trucks and pedestrians either by building runways
over the hose or suspending the hose overhead with the lowest
part of the hose at least 7 feet (2 meters) above the ground.
• Tighten hammer-joint connections with a hammer. Do not tighten
them by hand. Hoses equipped with special connections require
special tightening techniques or equipment. One example is
hammer-union connections, which must be tightened with a
hammer. Another example is spanner-wrench connections, who
must be tightened with a spanner wrench. Do not tighten these
connections by hand.
• Do not turn on air valves until the hose connections are secure.
• Do not point an open-air hose at anyone.
• Compressed air shall not be used for cleaning purposes except
where reduced to less than 30 psi, and then only with effective
chip guarding and proper personal protective equipment.
• Unless the equipment has quick change connectors (with internal
check valves), shut off the air at the air supply valve ahead of the
hose before breaking the connection.
must be securely fixed to the floor to prevent them from walking when in
operation.
11.8.25 SCAFFOLDING
• Installation, modification, and demolition of scaffolding shall be done
by competent persons (as common, in a team at least one person as
a certified Scaffolder) and inspected by certified Scaffolding Inspector
(DEPNAKER Certificate)
• Employees shall not access scaffolds that have not been inspected
and properly tagged.
Doc. No. T21021-CD-000-HSE-PLN-001
• Open sides and ends of platform 6 feet (1.8 meters) or more above
will be guarded by top rails, mid rails, and toe boards with the top
railing 42 inches (1.1 meters) above the platform levels.
• Scaffolds must be erected plumb and on a solid foundation. Loose
bricks, boxes, concrete block, scrap lumber, etc. must not be used to
level or support scaffolds or planks.
• All scaffolds must have an inspection tag placed at the point of
access/egress by a competent person.
• Employees, materials, and tools must not ride on mobile scaffolds.
11.8.26 SIMOPS
SIMOPS is define as execution of 2 or more operations with potential
interaction that could lead to an increase of risk or introduction of new
hazards to each other’s.
SIMOPS procedure and SIMOPS matrix should be established as a
guideline to identify and manage simultaneous activities.
Construction will provide the SIMOPS procedure and SIMOPS matrix
with the participation of HSE and other required discipline.
Where there are major interfaces between Contractor, Sub-
contractors, and Operations, these shall be managed by the
Construction Management representative to ensure agreement and
clarity on SIMOPS.
Contractor need to arrange following but not limited to this meeting:
Doc. No. T21021-CD-000-HSE-PLN-001
The following section identifies program / plan relevant for the project
in order to control the risk that may be exist on HSE aspects of
activities to be carried out during execution of the works. Risk
assessment is refer to Attachment HIRADC Procedure. Contractor
had identified initial hazard during the project through HIRA form. HIRA
consist of step of activity, initial risk ranking, mitigation based on
hazard hierarchy of control and residual risk.
Job Safety Analysis (JSA) will be required for all jobs performed at site.
JSA is a technique that focuses on job tasks as a way to identify
hazards before they occur. It focuses on the relationship between the
worker, the task, the tools, and the work environment. JSA is tool to
communicate the hazard and risks associated with a certain job to
those who will perform the work along with the necessary procedures
and controls to mitigate the risk and the Personal Protective
Equipment (PPE) and permits required to perform the work.
Break the job down into sequential steps, and document them. To
facilitate risk identification, the description of these steps shall be
discussed and well understood. Everyone should understand what is
taking place and where; what people are required; what equipment or
plant is in use; and any other components involved.
List against each step the potential hazards that could reasonably
cause damage. Consider:
- Weather conditions
- Day or night
Doc. No. T21021-CD-000-HSE-PLN-001
- Experience of operators
project JSA form. The JSA is reviewed and signed by each worker
member, and signature approval is provided by the Supervisor.
JSA prepared on the job are best done close in time and location to
the work to be done and by the people doing the job. Controls resulting
from such JSA are normally based on procedures or work instructions,
as this is all that is available to the people conducting them. This is
acceptable provided there are no High-Risks involved.
The main strength of JSA prepared on the job is their ability to focus
on unique risks (current conditions, resources, experience of workers,
impact with other jobs or people, etc.) of a job at a particular point in
time. The JSA also can be a valuable construction planning tool, as
well as a tool for training new employees in the steps required to
perform their jobs safely.
Discipline Supervisors are responsible to develop the JSA for each job
within their responsibility. Contractor HSE will review the JSA prior to
issuing to Contractor Construction Manager for final approval.
Contractor will maintain a register all of JSAs throughout the life of the
project. Developing of JSA shall be refer to HIRA (Hazard Identification
& Risk Assessment) as a preliminary identification.
Doc. No. T21021-CD-000-HSE-PLN-001
b) To ensure that all emergency tools and equipment have been checked
regularly and maintained well
e) Gathering and ensure the validity of the information from the reporter
g) Continually monitor the emergency situation and give some advice and
direction through ERT coordinator
h) To ensure that the evacuation and rescue have been conducted well
and if any victims they have got adequate treatment
b) To ensure that all emergency tools and equipment have been checked
regularly and maintained well
j) To ensure that the evacuation and rescue have been conducted well
and if any victims they have got adequate treatment
k) Communicate and lead the ERT to do their each roles and continually
coordination with them to get the updated information
c) Ensure all emergency equipment are put in the prominent location and
free from obstacle materials
d) Improve the knowledge and skill about fire prevention and response
a) Involve in maintain the first aid kit which is provided in each location and
join in the inspection if required
c) Support emergency team coordinator to check and ensure all area have
been clear and all employee were on assembly point area
d) Control and supervise for the possibility of rob, thief that may exist when
emergency situation occurred
e) Support emergency team or first aid team to secure the victim to the
safe place
PT PP junison@ptpp.c
Junison HSE Manager 081268277668
o.id
EMT Jakarta A A A C A A A
Company
A A A D A A A
Reps
Fire Brigade A A A
Hospital A A A C B A
Local
A
Authority
Police D A A D A A
Notification Legend
A Immediate Notice
TBA - - -
TBA - - -
TBA - - -
. Bomb Threats
a) Murder
b) Serious Assault
c) Sabotage
d) Fighting
e) Possession of offensive weapons
f) Interfering with HSSE equipment
g) Theft and/or Robbery
Doc. No. T21021-CD-000-HSE-PLN-001
Early warning and accurate storm tracking are crucial and the site
should have access to weather service information from radio or
television about the path of severe storms and tornadoes.
Person Action
Person Action
Early warning of flood is crucial and the site should have access to
weather service information from radio or television about flood
watches and warnings.
Person Action
Earthquakes
Person Action
On-scene not attempt to drive off road. If the site access roads are
blocked or damages, consider another route.
Person
• If up-tower, personnel should remain in place and take
cover.
• If in a vehicle (onsite or roads), stop the vehicle and do not
leave it during the earthquake.
Do not stop on a bridge, at an underpass, or in a tunnel,
and keep away from buildings at the side of the road
(danger of collapse).
• Secure the incident scene / do not disturb accident /
incident area.
• Coordinate with the local community’s emergency
response plan / emergency responders, and assistance for
Deputy SERT site personnel who need transportation.
Commander • Contact everyone on Emergency Channel and notify them
of the emergency and assign a person to meet the
emergency service at the meeting location.
Doc. No. T21021-CD-000-HSE-PLN-001
Work crews not yet deployed need to stand-by until “all clear” is
communicated. Note - Site HSE and site supervision can make a
determination based upon the direction of the storm if it is safe to
deploy the technicians.
Personnel are not likely to have time to leave worksite area and
must immediately proceed to one of the safe zones in the worksite
area. Don’t stand near the trees because tree can conduct the
electricity from lightning.
30/30 Rule
If you are not able to receive instructions from the site supervision /
HSE on the location and direction of the thunderstorm, use the
30/30 Rule to decide on emergency actions:
Person Action
➢ Never grab the person or pull the person off the current with
your hands; you might become part of the circuit and
become injured as well.
➢ Use a dry wood broom, leather belt, plastik rope, or
somthing similar that is non-conductive such as wood or
plastic cane with hook on the end to free the casualty from
energy source.
➢ Administer first aid; if you have trained or call the trained
personnel
4. Burn victim first-aid steps:
➢ If the casualty’s clothing is on fire, roll the person on the
groud to smother the falme
➢ Cool the burn with water for a few minutes or until the skin
returns to normal temperature, do not attempt to remove
clothig that is stuck to a burn
➢ Call the paramedic, first aider, or HSE Officer as soon as
possible.
c. Vehicle accident
In case of vehicle accident happened, if you are witness of vehicle
accident you have to:
1. Call the SERT Commander, Paramedic, or HSE that an
vehicle accident has occured.
2. Give the information regarding:
a. The kind of vehicle that got an accident (type, vehicle
number, etc)
b. The location of accident
c. Estimation for number of passangers
d. Condition of passanger
Doc. No. T21021-CD-000-HSE-PLN-001
3. Evacuate the spill area with oil spill kit (oil boom, dispersant,
and/or absorbent) to minimize the spill area.
4. If the spill can’t controll by local oil spill handler, SERT must
call the external parties to handle the spill incident.
d. Man lost / Manover Board
Upon notification of a “Man Lost / Manover Board” incident, the
SERT Commander shall immediately initiate the following:
1. Active the Rescue & Evacuation Team and have the Medical
& Stretcher Team standby.
2. Asking the victims work partner, the supervisor, or security
officer, when & where the last casualty was seen.
3. When the casualty has beed covered, bring him/her to site
clinic and if medical evacuation is needed follow the medical
evacuation procedure.
4. Notify CAR, Project Management Team about the incident
and/or if assistance is required.
5. If the casualty is not recovered, the search will be continued
and assistance from Government under Company permission.
6. Authorities such as Search & Rescue National (SAR),
Indonesian Navy, etc. May be required.
7. SERT Commander will coordination with SAR and/or
Indonesian Navy.
2. Evacuate the spill area with oil spill kit (oil boom, dispersant,
and/or absorbent) to minimize the spill area.
3. If the spill can’t controll by local oil spill handler, SERT must
call the external parties to handle the spill incident.
f. Fire and Explosion
The counter measures to be perform during fire are:
1. Sound the emergency alarm (if available), or shout “Fire...
Fire... Fire....” so that personnel around know the fire case
happened.
2. If possible, separate the flammable and/or combustable
materials from the fire area.
3. Call the Fire Fighter, HSE officer, or Security officer.
4. Use fire extinguisher to extinguish the fire if possible.
5. In case of fire is enlarged, SERT Commander must call the
Fire Brigade to help extinguish the fire.
g. Radioactive Exposure
Radioactive source is used in our operations for a number of
reasons, e.g. NDT (Non-Destructive Testing), liquid level
measurement etc. Operations involving radioactive source shall
require a permit-to-work and such operation shall be closely
monitored to endure that all requirements of the permit are stricty
adhered to.
If there is incident regarding use of radioactive source, the steps
to be follow are:
1. Ensure that the area involved is barricade and no other
personnel shall be within the area except those who are
involved in emergency operation.
2. Alert SERT to take necessary actions to control the incident.
Doc. No. T21021-CD-000-HSE-PLN-001
Assembly points will be set at each point of work, if there are several
work points in an area, it will be agreed and marked as a flag with the
initial’s "A" indicating the assembly point. Workers and guests will be
directed to the nearest muster point.
Doc. No. T21021-CD-000-HSE-PLN-001
Contractor shall provide and socialize to all employee the location of Assembly Point,
Muster Point and Windsock. These location (map) shall be informed at HSE Notice board
located at site and office area.
The result of the medical check-up (MCU) will be reviewed by Site Paramedic to determine
the fitness by considering to the job required by his/her supervisor. Only Fit to Work person
shall be obtained ID badges and enter the plant for work.
To be in line with Project HSE Policy, Contractor must conduct drug and alcohol test for
the employee. At minimum 1% of total number of employees per month shall be the target
for the test.
Daily random check will conduct in daily basis by Site Paramedic to ensuring health
condition of worker with some condition as follows :
- Examination health for worker that carrying out high risk activity.
Drug and Alcohol test will be carried out randomly. However, employee at high risk
activities will be the priority to participate in the test.
15.3 HOUSEKEEPING
All personnel with potential exposure greater than the action noise level, will
be enrolled in the medical surveillance program and undergo a baseline
Doc. No. T21021-CD-000-HSE-PLN-001
When a Standard Threshold Shift (STS) is noted between the last valid
baseline and the annual audiogram, the following steps will be taken:
15.8 PANDEMY/OUTBREAK
Contractor shall provide site specific procedure to govern any pandemic and/or
outbreak which occur during the project and potential to affect the project.
Contractor specific pandemic and/or outbreak procedure shall in line with
government and Company protocol.
17.5 INSPECTIONS
All work area, critical equipment, and other HSE equipment shall be
appropriate with the risk in the site. This shall include the provision,
maintenance and regular inspection of the HSE equipment such as fire
prevention and fire-fighting equipment which was furnished by Contractor
for all facilities and work locations where fire anticipated.
HSE Work Area Inspection
HSE Inspection Patrol is conducted daily by HSE Coordinator as
walkthrough inspection to identify unsafe condition and unsafe action in
Contractor’s premises. Immediate correction action will be taken for any
unsafe observation.
Safety joint inspection also will be conducted by weekly with involvement of
Company representative, HSE Manager Site of Contractor, and
Subcontractor management level.
HSE Equipment Inspection
Doc. No. T21021-CD-000-HSE-PLN-001
Contractor shall provide fire and safety system which can be sufficient
enough to cover the entire area of shore base. All firefighting system shall
be certified and regularly inspected.
Contractor shall provide Fire Blanket, Eye wash, Emergency shower, and
first aid box. Emergency drill related fire prevention shall be conduct at least
once per three months. Below is schedule plan for fire prevention and HSE
equipment.
CONDUCTED
NO EQUIPMENT FREQUENCY REMARKS
BY
FREQUENC CONDUCTED
NO EQUIPMENT REMARKS
Y BY
Pre-mob*; Or as per
Crane and
1 HSE Inspector Company
Forklift Monthly required
Pre-mob*; Or as per
2 Trailer/truck HSE Inspector Company
Monthly required
Hand Power
3 Monthly HSE Inspector
tools equipment
Doc. No. T21021-CD-000-HSE-PLN-001
Pre-use; Driver;
6 Light Vehicle
Monthly HSE Officer
Scaffolding Scaffolding
7 Bi-Weekly
equipment Inspector
HSE Inspector
9 Machinery Monthly
Electrician
meeting, induction, training, PTW, JSA, etc) and others. HSE weekly report is
intended for internal of Contractor as a tool to monitor the on going work activities.
HSE MONTHLY REPORT
HSE Monthly Report are const of the HSE Performance statistic (i.e safe man
hours work, a number of nearmiss cases, first aid cases, medical treatment cases,
Loss Time Injury, etc). Contractor will submit to Company the summary of HSE
Activities, HSE monthly achievement, etc.