You are on page 1of 7

Job Number Sheet

Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

Continuous Beam: (Code of Practice : Eurocode 2 - 2004)


1/15/2022 12:20:31 PM C01

Input Tables
fck(MPa) 18
fy (MPa) 450
fyv (MPa) 250
% Redistribution 0
Downward/Optimized redistr. D
Cover to centre top steel(mm) 25
Cover to centre bot.steel(mm) 25
Dead Load Factor 1.35
Live Load Factor 1.5
Density of concrete (kN/m3) 24
% Live load permanent 30
Ø (Creep coefficient) 2
Ecs (Free shrinkage strain) 300E-6

Sec Bw D Bf-top Hf-top Bf-bot Hf-bot Y-offset Web Flange


No. (mm) (mm) (mm) (mm) (mm) (mm) (mm) offset offset

1 225 350

Span Section Sec No Sec No


No Length(m) Left Right

1 3 1
2 3.4 1
3 1.5 1
4 4 1
5 1.2 1

Sup Code Column Below Code Column above Code


No. C,F F,P F,P
D(mm) B(mm) H(m) D(mm) B(mm) H(m)
1
2 225 225 3.7
3 225 225 3.7 225 225 3 P
4 225 225 3.7
5 225 225 3.7
6 225 225 3.7

Case Span Wleft Wright a b P a M a Load


D,L (kN/m) (kN/m) (m) (m) (kN) (m) (kNm) (m) Description

D 1 8
2 8 10 2.4
3 8
4 8 34 .85
5 8

L 1 12.5
2 12.5
3 12.5
4 12.5 6 .85
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

Case Span Wleft Wright a b P a M a Load


D,L (kN/m) (kN/m) (m) (m) (kN) (m) (kNm) (m) Description

5 12.5

Span M left M right


(kNm) (kNm)

Sections

225

350

SECTION 1

Beam Elevation

1 SPAN 1 2 SPAN 2 3 SPAN 3 4 SPAN 4 5SPAN 56

Live
12.50 6.00

Dead+
Own W 9.89 10.00 34.00

3.000 3.400 1.500 4.000 1.200


Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

Deflection, Shear, Moment and Steel diagrams. Spans 1-5

Elastic Deflections (Alternate spans loaded) Def max = 1.837mm @ 9.75m


1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.0

11.0

12.0

13.0
.500

1.00

1.50

Long-term Deflections (All spans loaded - using entered reinforcement) Def max = 7.712mm @ 9.75m
1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.0

11.0

12.0

13.0
2.00

4.00

6.00

SHEAR: X-X V max = 110.4kN @ 7.90m


100
80.0
60.0
40.0
1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.0

11.0

12.0

13.0
20.0

-20.0
-40.0
-60.0

MOMENTS: X-X M max = -57.94kNm @ 7.90m


-60.0

-40.0

-20.0
1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.0

11.0

12.0

13.0

20.0

Shear Steel: X-X Asv max = .6948mm²/mm @ 7.90m


.700
.600
.500
.400
.300
.200
.100
1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.0

11.0

12.0

13.0

Bending Steel: X-X As max = -514.7mm2 @ 7.90m

-400

-200
1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.0

11.0

12.0

13.0

200
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

COLUMN REACTIONS

Support Dead Load(kN) Live Load(kN) Dead + Live(kN) Ultimate(kN)

1 10.57 14.00 24.57 38.42


2 40.35 46.83 87.17 124.71
3 19.14 22.52 41.67 92.00
4 66.16 45.09 111.25 168.57
5 45.25 46.36 91.61 130.63
6 -7.91 -5.05 -12.96 -30.24

---------------------------------------------------------------------

COLUMN MOMENTS (Ultimate limit state)

Columns below

Support Bending Moment(kNm) Shear Force (kN)


No. Min. Max. Min. Max.

1 0.00 0.00 0.00 0.00


2 -3.47 1.99 -1.41 0.81
3 1.65 4.95 0.67 2.01
4 -7.27 -3.21 -2.95 -1.30
5 1.63 4.54 0.66 1.84
6 -1.96 -0.54 -0.80 -0.22

Columns above

Support Bending Moment(kNm) Shear Force (kN)


No. Min. Max. Min. Max.

1 0.00 0.00 0.00 0.00


2 0.00 0.00 0.00 0.00
3 1.53 4.58 0.51 1.53
4 0.00 0.00 0.00 0.00
5 0.00 0.00 0.00 0.00
6 0.00 0.00 0.00 0.00

---------------------------------------------------------------------
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

Reinforcing Tables
Beam type (1-5) 1
Maximum bar length (m) 12
TOP: Minimum bar diameter (mm) 12
Maximum bar diameter (mm) 16
BOTTOM: Minimum bar diameter (mm) 12
Maximum bar diameter (mm) 12
STIRRUP: Minimum diameter (mm) 6
Maximum diameter (mm) 6
Stirrup shape code 60
First bar mark - top A
First bar mark - mid.[optional]
First bar mark - bot.[optional]
Cover to stirrups - top (mm) 25
Cover to stirrups - bot (mm) 30
Cover to stirrups - sides (mm) 25
Minimum stirrups as % of nominal 100
Loose method of detailing (Y/N) N
Exploded elevation (Y/N) Y
Bending schedule scale 1: Auto
Number bars from left to right (Y/N) Y
Middle bar diameter (mm) Auto
Target Padds

Bars Mark SC Span Offset Length Hook Layer


2Y12 A 34 1 0.025 0.675 L T
2Y12 B 34 1 0.025 7.395 L T
2Y12 C 34 1 0.025 8.025 L B
2Y12 D 20 2 -0.700 1.400 L T
2Y12 E 20 3 -0.700 1.400 L T
3Y16 F 20 3 0.600 1.800 L T
2Y12 G 34 4 -0.150 5.438 R B
2Y12 H 34 4 0.230 5.057 R T
1Y12 I 20 4 0.700 2.000 L B
2Y12 J 20 5 -0.700 1.400 L T

Stirrup Section Bar Type + Shape Top Top Bottom


Number Number Diameter Mark Code Offset Flange Flange

1 1 R6 SA 60

Stirrup Length
Number Spacing Span Offset (m)

1 150 1 0.20 2.55


1 150 2 0.21 2.98
1 150 3 0.21 1.05
1 50 4 0.21 0.64
1 150 4 0.95 2.84
1 150 5 0.21 0.75

Section positions
Label Span Offset(m)
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

Section positions
Label Span Offset(m)
B 2 0.4
C 2 1.9
D 3 0.4
E 3 1.0
F 4 0.4
G 4 2.2
H 5 0.4

File name CB.PAD


First span 1
Last span 5
Draw grid lines?(Y/N) Y
Draw columns?(Y/N) Y
Number/Letter of first grid A
Number (U)p or (D)own U
Drawing size?(A4 or A5) A5
Height (normal text) mm 2
Height (title text) mm 2.5
Height (sec. bar mark) mm 1.8
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

Main and Shear Reinforcing diagrams. Spans 1-5

SPAN 1 - 3.000 SPAN 2 - 3.400 SPAN 3 - 1.500 SPAN 4 - 4.000 SPAN 5 - 1.200

2Y12-A 2Y12-D 2Y12-E 3Y16-F 2Y12-J


2Y12-H
2Y12-B

2Y12-G
2Y12-C 1Y12-I

MAIN REINFORCEMENT As max = -603.2mm2 @ 7.90m


-600

-400

-200
1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.0

11.0

12.0

13.0
200

SPAN 1 - 3.000 SPAN 2 - 3.400 SPAN 3 - 1.500 SPAN 4 - 4.000 SPAN 5 - 1.200

18-SA-150 21-SA-150 8-SA-150 14-SA-50 6-SA-150

20-SA-150

SHEAR REINFORCEMENT Asv max = 1.257mm²/mm @ 8.75m


1.20

1.00

.800

.600

.400

.200
1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.0

11.0

12.0

13.0

You might also like