Professional Documents
Culture Documents
Desligar o GC-MS
Desligar o GC-MS
STEP 1: Perform an autotune (and air and water check for some models) and print
the report.
When ready to restart, turn the carrier gas tank, power on the GC and computer,
loosen completely the analyser set screws, open the MS vent valve, remove the
blank column nut from the transfer line, reinstall the column into the transfer line;
and follow MS pump down procedure.
https://community.agilent.com/knowledge/gcms-portal/w/gcms-knowledgebase/
6928/how-to-vent-shut-down-the-gc-msd---ei---masshunter#:~:text=In%20the
%20Instrument%20Control%20view,display%20the%20Vacuum%20Control
%20dialog.&text=Follow%20the%20instructions%20presented%20on,software
%20into%20Instrument%20Control%20view.
Reference:
Agilent Technologies: GCMS Steps to Shut Down, March 2020