1.

Piping and
instrumentation
Diagrams

P&ID’s
2.
PLOT PLAN

APPROVED BY

CHIEF INSPECTOR

EXPLOSIVES
3.
NO OBJECTION
CERTIFICATES

A. CIE
B. DCO
C. EPA
D. MOD
E. District
4.

MECHANICAL
CONSTRUCTION
CERTIFICATES

By Contractor
Endorsed By
Owner
5.
Compliance
certificate by OMC

A. NEQS
B. MOD NOC
6.
Piping &
Equipments
Layouts

A. Product Piping
B. F.W Dist.
C. F.W Cover
D. Foam System
E. Oily Water
Drainage
7.
E & I Layouts

A. Fire Detection
B. Lighting Detect
C. Plant Op. &
Emergency
Shutdown
Philosophy
D. SLD
E. Power Cable
Routes
F. Earthing layout
G. Hazard Area
H. Arch. Drawing
of Control Syst
I. Facility Lighting
8.
Drawings

A. G.A of Tanks
B. Tanks
Fabrication/ Shop
Drawings
9.
Designs
Specifications

A. Piping
Including Hoses
B. Fire Water
C. Fab of Tanks
D. E&I Installation
works
E. Power &
Earthing
10.
Plant Piping

A. Inspection &
Testing Reports
B. NDT
C. WPS
D. WQT’s
11.
MTC’s

Storage TANKS
13.
Data Sheets

Manufacturers
Literature

A. Pumps & Motors


B. ESDV
C. Loading Arms
D. Flow Meters
E. E&I Area
F. Components
G. TRV’s, PRV’s
14.
Functional Test
Reports

A. Fire Water System


B. E&I System
15.
Manuals

A. Safety Manual
including ERP
B. O&M
C. SOP
D. Enoironmental &
Social Impact
Assessment
Report
16.
List

Electrical
&Instrumentation
Equipment List
17.
Calibration / Test
Reports

A. Earth
Resistance
B. Instruments
(TRV’s, PRV’s)