Simulation Quiz - MANAGEMENT SCIENCE (1B)
Simulation Quiz - MANAGEMENT SCIENCE (1B)
Due
Nov 11 at 3:35pm
Points
22
Questions
11
Available
Nov 11 at 2:35pm - Nov 11 at 3:35pm
1 hour
Time Limit
60 Minutes
Instructions
Read, understand, and analyze the problems carefull. Provide supporting solutions; No Solution, No Points.
Save all solutions as one pdf file and follow the required file name format (section lastname firstname midterm
exam solutions.pdf - for example, a111 cruz juan simulation quiz solution.pdf).
NOTE: Table solutions should be handwritten. It must have your name, section, and signature on it.
Attempt History
Attempt Time Score
LATEST Attempt 1
53 minutes 20 out of 22
Correct answers are no longer available.
Native Scarves will open several new production facilities next year. Each new
facility is designed to have one quality inspector who checks the knitting of the
wool scarves before shipping it to retailers. The arrival of hand-knit wool scarves to
the quality inspection department is variable over the 24-hour workday (three 8-
hour shifts). A concern is raised that inspection may delay the shipment of scarves
to retailers during busy periods. This concern prompted the firm to undertake a
study of the flow of scarves into the quality inspection department as a waiting line.
Its general manager wants to determine whether one quality inspector per shift at
each facility will suffice. He established service guidelines stating that the average
delay waiting for quality inspection should be no more than one minute. Note that
each scarf can be viewed as a customer since scarves are the flow unit passing
through the system. Its minimum arrival time is 1, while maximum arrival time is 5
minutes. What will you recommend to the general manager based on the results
of your analysis?
1 0.15 2.10
2 0.55 1.85
3 0.47 3.00
4 0.23 2.00
5 0.5 3.00
6 0.41 1.75
7 0.35 1.60
8 0.26 2.15
9 0.50 2.20
10 0.2 1.80
Total
Average
Question 1 2
/ 2 pts
Question 2 2
/ 2 pts
21.45
Question 3 2
/ 2 pts
23.45
Incorrect 2
/ 2 pts
Question 4
2.00
Question 5 2
/ 2 pts
how many customers are waiting in line?
Question 6 2
/ 2 pts
26.68
Incorrect 2
/ 2 pts
Question 7
Based on the findings, the probability of waiting is only 40%, the average wait time for
Incorrect 2
/ 2 pts
Question 8
40.00%
Question 9 2
/ 2 pts
93.34%
Incorrect 0
/ 2 pts
Question 10
2.15
Question 11 2
/ 2 pts
10
Quiz Score:
20 out of 22