You are on page 1of 5

simulation quiz

Due
Nov 11 at 3:35pm
Points
22
Questions
11
Available
Nov 11 at 2:35pm - Nov 11 at 3:35pm
1 hour
Time Limit
60 Minutes

Instructions
Read, understand, and analyze the problems carefull. Provide supporting solutions; No Solution, No Points.

Save all solutions as one pdf file and follow the required file name format (section lastname firstname midterm
exam solutions.pdf - for example, a111  cruz juan simulation quiz solution.pdf).

Submit/upload solution file thru the assignment comments of this quiz.

NOTE:  Table solutions should be handwritten.  It must have your name, section, and signature on it.

This quiz was locked Nov 11 at 3:35pm.

Attempt History
Attempt Time Score
LATEST Attempt 1
53 minutes 20 out of 22


Correct answers are no longer available.

Score for this quiz:


20 out of 22
Submitted Nov 11 at 3:29pm
This attempt took 53 minutes.

Native Scarves will open several new production facilities next year. Each new
facility is designed to have one quality inspector who checks the knitting of the
wool scarves before shipping it to retailers. The arrival of hand-knit wool scarves to
the quality inspection department is variable over the 24-hour workday (three 8-
hour shifts). A concern is raised that inspection may delay the shipment of scarves
to retailers during busy periods. This concern prompted the firm to undertake a
study of the flow of scarves into the quality inspection department as a waiting line.
Its general manager wants to determine whether one quality inspector per shift at
each facility will suffice. He established service guidelines stating that the average
delay waiting for quality inspection should be no more than one minute. Note that
each scarf can be viewed as a customer since scarves are the flow unit passing
through the system. Its minimum arrival time is 1, while maximum arrival time is 5
minutes.  What will you recommend to the general manager based on the results
of your analysis?

Inter- Service Time


Random Arrival Waiting Service Completion
client arrival start in
number time time time time
time time system

1 0.15         2.10    

2 0.55         1.85    

3 0.47         3.00    

4 0.23         2.00    

5 0.5         3.00    

6 0.41         1.75    

7 0.35         1.60    

8 0.26         2.15    

9 0.50         2.20    

10 0.2         1.80    

  Total              

  Average              

Question 1 2
/ 2 pts

what is the average time the customer waits in line?


0.20

Question 2 2
/ 2 pts

compute the total service time

21.45

Question 3 2
/ 2 pts

determine the total time in system

23.45

Incorrect 2
/ 2 pts
Question 4

calculate the total waiting time

2.00

Question 5 2
/ 2 pts
how many customers are waiting in line?

Question 6 2
/ 2 pts

determine the end of simulation

26.68

Incorrect 2
/ 2 pts
Question 7

what do you recommend to the general manager?

Based on the findings, the probability of waiting is only 40%, the average wait time for

Incorrect 2
/ 2 pts
Question 8

what is the probability of the customer waits in line?

40.00%
Question 9 2
/ 2 pts

calculate the utilization rate ( round off to four decimal places)

93.34%

Incorrect 0
/ 2 pts
Question 10

what is the average time the customer spends in the system?

2.15

Question 11 2
/ 2 pts

how many customers are in the system?

10