M/T “ EXCELSIOR BAY “

STANDARD OPERATION PROCEDURE

ODME SIMULATION TEST

1.GENERAL PARTICULARS

ODME –Oil Discharge Monitoring and Discharge Control System


- Make / Model: VAF OILCON MARK 6M
- Range: 0 -1000 ppm
Main Control Unit with printer ODME Box-In front of AccommodationSkid Assembly /Sampling pump

ODME unit Foam room-Fresh Water supply -Air Valves(Air supply)

Solenoid valvesCCR (Automatic Hydraulic valves, Slop Port C0016


Overboard valve C0017 )

Main Switch

1
M/T “ EXCELSIOR BAY “
STANDARD OPERATION PROCEDURE

ODME SIMULATION TEST

2.LINE SET UP /DIAGRAM


PURGE PIPE

SLOP PORT(C0016)

ANEX II (Overboard) Orifice Plate

Sample out

ANEX I(Overboard)C0017Sample in

Flow Meter
Sample in
Differential Pressure Transmitter

Sample out

ODME BOX
IN FRONT OFF
ACCOMMODATION
MANUAL VALVE

AUTOMATIC VALVE FWPress.Regulation valve

FLANGE WITH BLANKE

Equalization valve Sample in

Small manual valveSample out

Small manual valveFresh water in

Drain Valves

FW Press.Regulation valve

2
M/T “ EXCELSIOR BAY “
STANDARD OPERATION PROCEDURE

ODME SIMULATION TEST

3.ODME SIMULATION TEST

3.1Before Test ensure the following conditions are met

-control air supply is on.


-fresh water supply is on.
-electrical supplies are on.
-main control unit is switched on.
-electro pneumatic unit is switched on.
-starter box is switched on.
-all manual valves in the system are open.
-cargo pump is on stand by .

3.1.1 Testing ODME

1. Open FW valve- Foam room(one valve).


2. Open air inlet (two) -Foam room.
3. Sample out valve - Slop port ball valve open.
4. Sample in valve - on overboard line,ball valve close.
5. ODME transmitter box- all 3 valves close as well on overboard line 3 flow rate ball valve close.
6. In front accommodation ODME box,( sample out valve open‘’drain valve’’).
7. All drain valves close - on sample out line/sample in line.
8. Turn ON ODME monitor in CCR –Switch in CTRL pos.(This ODME as per maker instruction before use must be reset)
9.Reset ODME (take paperclip, make sure that power is on than press gentle and shortly the reset button).
10.Check that ODME printer is working/confirm with bridge position,UTC time, speed of the vessel.
11.Follow procedure from manual for testing.ALWAYS TESTING ODME IN MANUAL MODE
During decanting operation ODME must use on AUTO MODE
3.1.2 Test and check out procedure

/Reset ODME.

*not conc.alarm.Conc alarm to be set

More than oil conc.indication 999ppm

3
M/T “ EXCELSIOR BAY “
STANDARD OPERATION PROCEDURE

ODME SIMULATION TEST

4
M/T “ EXCELSIOR BAY “
STANDARD OPERATION PROCEDURE

ODME SIMULATION TEST

X 2 times.

X 2 times

5
M/T “ EXCELSIOR BAY “
STANDARD OPERATION PROCEDURE

ODME SIMULATION TEST

6
M/T “ EXCELSIOR BAY “
STANDARD OPERATION PROCEDURE

ODME SIMULATION TEST

7
M/T “ EXCELSIOR BAY “
STANDARD OPERATION PROCEDURE

ODME SIMULATION TEST

x 2 times

(conc. Alarm).

8
M/T “ EXCELSIOR BAY “
STANDARD OPERATION PROCEDURE

ODME SIMULATION TEST

9
M/T “ EXCELSIOR BAY “
STANDARD OPERATION PROCEDURE

ODME SIMULATION TEST

For Further Reference or any doubts, referred to ODME manual