Professional Documents
Culture Documents
A B C
0.50 4.50
tip of parapet
tip of parapet
0.50
COVER WITH LOUVER
AT AIRWELL
1.00
CONCRETE FIREWALL
2.00
2.00
flat roof line
0.30
flat roof line CONCRETE FLAT ROOF
top of roof beam
top of roof beam
A ceiling line
ceiling line I
3.00
R
UNIT 04
3.00
W UNIT 02 D
8.20
E 2
8.20
L
L
HALLWA second floor line
second floor line
A ceiling line
ceiling line I
3.00
R
BEDROOM LIVING
3.00
W
E 02 AREA
L
L
finish floor line
0.20
finish floor line ngl.
0.20
5 4 3 2 1 5 4 3 2 1
0.50
0.50
2.00
1.20
2.00
1.20
0.30
0.30
3.00
3.00
D
W
UNIT 02 D
3
KIT. KIT.
D
3 UNIT 01 2
8.20
6
8.20
ceiling line
3.00
3.00
D
LIVING AREA
D D
3 2 2
W
2
0.20
ngl.
0.20
PRC REG. NO. 0017799 PROJECT TITLE OWNER DESIGNED BY SHEET CONTENT SHEET NO
VALIDITY 11/23/2024 CADD BY JEF
PTR NO. 5484220 TWO(2)-STOREY RESIDENCE DATE 05/17/2022
AR. MAY ROSE C. CARREON DATE 01/30/2022 MR. BASILIO FALISONG PLACE
AS SHOWN A
BAGUIO CITY
LA TRINIDAD, BENGUET
ARCHITECT
PLACE BAGUIO CITY LOCATION CHECKED BY MRCC 3
TIN 928-861-787 SHILAN, LA TRINIDAD, BENGUET APPROVED BY