You are on page 1of 1

A B A B

11.20 11.20
7.70 3.15 7.70 3.15 8.85 1.08
6.10 2.90 2.00 6.10 2.90 2.00

STOCK ROOM
2.00 TOILET 1.70
(1.7m X 2.9m)
(2.0m X 2.0m) 2.00 ROOF APEX

1 1

8.00 8.00
FINISH FLOOR LINE
FIREWALL

NAT.GRADE LINE

FIREWALL
REAR ELEVATION
17.56

2 19.50 2 19.50

7.35 7.35
ROOF APEX

3 3
2.15 2.15

ROOF PLAN FINISH FLOOR LINE

NAT.GRADE LINE

FLOOR PLAN REFLECTED CEILING PLAN RIGHT SIDE ELEVATION

ROOF APEX ROOF APEX

QUICK DRYING ENAMEL, APPLIED


ON 6" Ø G.I. PIPE

SEMI-GLOSS
LATEX PAINT WITH PLEXIBOND,
APPLIED ON RC CANOPY

BRICK ON 0.3m x 0.3m


R.C. COLUMN

100mm CHB WALL, SEMI-GLOSS


LATEX PAINT FINISH ON 25mm
CEMENT PLASTER
FINISH FLOOR LINE FINISH FLOOR LINE

NAT.GRADE LINE NAT.GRADE LINE

FRONT ELEVATION LEFT SIDE ELEVATION

DESIGNED BY: THIS DRAWING IS ISSUED FOR:


FROM THE OFFICE OF: PRC. NO. : 0047520 SEAL PROJECT TITLE SHEET CONTENTS: AS BUILT ESTIMATE SHEET NO.

DRAFTED BY: BIDDING FABRICATION


VALIDITY : 12/11/2020 PROJECT OWNER:
BUILDING PERMIT OWNER'S APPROVAL

PTR. NO. : 3057147


PROPOSED CARWASH SHED CATHERINE N. HAZELTON
DATE:
CONSTRUCTION PRESENTATION A
JANZEN R. ENCABO DATE : 01/03/20 IMPORTANT : MEASUREMENTS ARE VERIFIED ON SITE AND ALL DISCREPANCIES
SHOULD BE REPORTED TO THE ARCHITECT. 2 2
THIS DRAWING ACTING AS INSTRUMENT OF SERVICE IS THE INTELLECTUAL PROPERTY
ADDRESS : LURAY II, TOLEDO CITY, CEBU T.I.N. : 338-343-647 LOCATION: PAJAC, LAPU-LAPU CITY, CEBU ADDRESS : BAYSWATER SUBDIVISION, BRGY. AGUS, LAPU-LAPU CITY, CEBU OF THE ARCHITECT & CANNOT BE REPRODUCED WITHOUT THEIR WRITTEN CONSENT.