The contractor is responsible for all the obligations to be


accomplished according to the Contract and its Exhibits, always in
accordance to the local norms & applicable Law, and the good
practices of the Industry. If any mistake, omission, ambiguity, or any
other inconsistency in the documents and design materials delivered
appears at any stage, the Contractor will have the obligation to
correct them, at its own cost.

Estado:

Sin Observaciones

Con Observaciones
Menores

Con Observaciones
Mayores
Responsable: D.V.V.

Fecha: 18-02-2021

E NS
M

E
RA N

SI
A O
O
P
C I
L R ID UC
VA NST

a
er i
CO

ni
g e
A r e a de I n

CHECK BOX
AS-BUILT FOR INFORMATION FOR
APPROVAL ONLY CONSTRUCTION

R0 R0 08.02.21 ISSUED FOR CONSTRUCTION LAS MOM/JST


RF RC 23.01.21 ISSUED FOR COMMENTS LAS MOM/JST
RE RB 29.12.20 ISSUED FOR COMMENTS LAS MOM/JST
RD - 18.08.20 INTERNAL REVISIO LAS MOM/JST
RC - 28.07.20 INTERNAL REVISIO LAS MOM/JST
RB - 09.07.20 INTERNAL REVISIO LAS MOM/JST
SWSL WITH
DATE REMARKS DRN CHED/APPR
INTERNAL CLIENT
REVISIONS
PROJECT TITLE:

105 MW SOLAR POWER PLANT


AT VALLE ESCONDIDO,CHILE

CLIENT:-

AR VALLE ESCONDIDO SpA,

EPC CONTRACTOR :-
delivery, distribution on any format, must be under SIEMENS ENERGY SPA
belonging to SIEMENS ENERGY SPA. and its use, storing, reproduction,
The original content of this document is digital intellectual property

STERLING & WILSON SOLAR LIMITED


AGENCIA EN CHILE
authorization or several legal actions may apply by law.

DRAWING TITLE:
EARTHING LAYOUT
FOR 33/220kV SUBSTATION

SCALE INDICATED MRP CODE :


R0 08.02.21 ISSUED FOR CONSTRUCTION LAS MOM JST
DRAWN JI CL35-12610-DRW-EL-SWI-4005
RC 23.01.21 ISSUED FOR COMMENTS LAS MOM JST
CHECKED CA SHEET NO 1 OF 1
RB 29.12.20 ISSUED FOR COMMENTS LAS MOM JST
APPROVED CC PAPER SIZE A0
N° DATE MODIFICATIONS DRW REV APPR DATE 08.02.21 REV NO. (WITH CLIENT) R0