Qualified engineer with over 5 years of professional experience. Skilled in managing projects, Telecommunications Engineer problem-solving, and trouble-shooting. Excellent communicator both written & verbal and we executive experience with an ability to work with cross-functional team. Extensive Jeddah, Saudi Arabia professional and interpersonal commination skills. Ability to multitask and appropriately prioritize while under operational pressure. My education and field experience coupled with smuzamilali@gmail.com the can do attitude, compliments the strong attention to detail and solution oriented approach. 00966-598587678 PROFESSIONAL EXPERIENCE 06-09-1987 PROJECT ENGINEER Oct 2019 – Present EDUCATION LCC – A Tech Mahindra Company | Jeddah, Saudi Arabia MS Electrical and Electronics • Leading an18-members team of Engineers, riggers & drivers Engineering by Research • Responsible of Project delivery in a given timeline proposed by customer Universiti Teknologi PETRONAS (UTP)|Malaysia • Responsible for arranging meetings with PMO associated with a project, for monitoring Nov 2011 - Aug 2015 project progress and keeping other team members and the project’s clients up to date and informed BS Electrical Engineering • Develop and manage a detailed project schedule and work plan COMSATS Institute of Information • Measure project performance to identify areas for improvement Technology |Islamabad, Pakistan • Cost Management for the ongoing project Sept. 2007 - April 2011 • Keep updating daily activity tracker having progress record of teams Core Competencies • Identify & manage resource requirements in the project team • Project management • Daily assigning duties to Engineers, Riggers & Drivers • Radio Frequency Optimization • Debugging of Hardware related issues and escalation • Radio Access Network • Compilation of city level Reports and analysis of drive test logs to identify areas or Parameter Tuning patches with degraded coverage, quality, Throughput and recommend soft/hard • Network Performance changes Evaluation & KPI Analysis • Arrange resources and coordination with teams to complete daily drive test activities • SSV (Single Site Verification) and and check parameters values regarding new features implementation. Drive Test support • Coordination with customer for all network related tasks & issues • Reports generation and analysis • Performance updates TECHNICAL ENGINEER Aug. 2017 – Sept. 2019 • Time Management NESMA Recycling Co. Ltd. | Jeddah, Saudi Arabia • Leadership Qualities • Team coordination KEY RESULT AREAS • Relationship development Operations and Maintenance Computer Skills • Maintaining and monitoring project plans, project schedules, work hours, budgets and • TEMS Discovery/Actix/TEMS expenditures. Investigations/AutoCAD/Ansoft • Organizing, attending and participating in stakeholder meetings. Documenting and HFSS Design System/CST following up on important actions and decisions from meetings. Microwave Studio/MATLAB/MS Visual C++, Express PCB/MS • Ensuring project deadlines are met and providing administrative support as needed. Word/MS Excel/MS Power Point • Arranged contractors for the installation of fire alarm system and electric panel boards. • Supervised Installation and commissioning of fire alarm System and electric panel Achievements and Awards boards at metal factory, ensuring that they functioned correctly. • Appreciation Certificate (In • Reviewed drawings and electrical schematics to perform tasks to specifications. recognition of my outstanding • Developed and implemented operations manuals, policies and procedures and performance, superior maintenance programs schedules. dedication and positive attitude • Contacted vendors to ascertain and procure the necessary equipment and tools needed on the job throughout during the year 2018) to successfully complete jobs. • Gold Medal in 24th DISMANTLING PROJECT- YANBU CEMENT COMPANY LINE 1,2,3 International Invention • Liaised with company executives to acquire resources to move projects forward. Innovation & Technology Exhibition (ITEX) 2013, Kuala • Played a key role and implemented Standard Operating Procedure (SOP) for Lumpur dismantling of cement plant. • Double Gold in British • Performed thorough risk assessments on the dismantling work. Innovation Show (BIS) 2013, • Developed estimates to determine comprehensive project costs and financial reports to held in London monitor ongoing Languages • costs at site. • Urdu • Worked directly with dismantling foremen to monitor dismantling work. • English • Arranged skilled workers, heavy equipment (cranes, forklifts, shovels, Loaders) within • Arabic budgeted amount.