The document is a cube register for a construction project building an ESIC hospital. It lists 27 entries providing the date, quantity in cubic meters, and grade of concrete poured for various foundations and buildings. It also outlines the target dates of concrete pouring and completion for different foundation types and buildings over a period from September 26th, 2022 to November 12th, 2022.
The document is a cube register for a construction project building an ESIC hospital. It lists 27 entries providing the date, quantity in cubic meters, and grade of concrete poured for various foundations and buildings. It also outlines the target dates of concrete pouring and completion for different foundation types and buildings over a period from September 26th, 2022 to November 12th, 2022.
The document is a cube register for a construction project building an ESIC hospital. It lists 27 entries providing the date, quantity in cubic meters, and grade of concrete poured for various foundations and buildings. It also outlines the target dates of concrete pouring and completion for different foundation types and buildings over a period from September 26th, 2022 to November 12th, 2022.
TYPE 3 FOUNDATION PCC 01.10.2022 22.10.2022 TYPE 3 FOUNDATION RCC 05.10.2022 26.10.2022 TYPE 5 FOUNDATION PCC 07.10.2022 28.10.2022 TYPE 3 FOUNDATION RCC 08.10.2022 29.10.2022 TYPE 3 FOUNDATION RCC 09.10.2022 30.10.2022 TYPE 5 FOUNDATION PCC 10.10.2022 31.10.2022 TYPE 3 FOUNDATION RCC 11.10.2022 01.11.2022 TYPE 3 FOUNDATION AND COLUMN RCC 17.10.2022 07.11.2022 TYPE 3 FOUNDATION PCC 18.10.2022 08.11.2022 TYPE 3 FOUNDATION AND TYPE V FOUNDATION RCC 20.10.2022 10.11.2022 TYPE 3 FOUNDATION PCC 23.10.2022 13.11.2022 TYPE 3 BELOW COLUMN AND TYPE 5 FOUNDATION RCC 24.10.2022 14.11.2022
TYPE 3 FOUNDATION AND HOSPITAL BUILDING A1 PCC 25.10.2022 15.11.2022
TYPE 3 FOUNDATION RCC 26.10.2022 16.11.2022
TYPE 3 FOUNDATION RCC 27.10.2022 17.11.2022 HOSPITAL BUILDING A1 29.10.2022 19.11.2022 TYPE 3 FOUNDATION AND COLUMN RCC 29.10.2022 19.11.2022 HOSPITAL BUILDING AND TYPE 3 03.11.2022 24.11.2022 TYPE 3 FOUNDATION RCC 04.11.2022 25.11.2022 TYPE 3 FOUNDATION AND COLUMN RCC 07.11.2022 28.11.2022 HOSPITAL BUILDING 09.11.2022 30.11.2022 TYPE 3 FOUNDATION & COLUMN & PEDESTAL AND TYPE V 11.11.2022 02.12.2022 HOSPITAL BUILDING AI 12.11.2022 03.12.2022